HomeMy WebLinkAboutApplication_TriCo 03-16-22TriCo Regional Sewer Utility
www.TriCo.eco Phone (317) 844-9200 Fax (317) 844-9203
Sanitary Sewer Project Application
Submit to:
TriCo, 10701 N College Ave., Suite A. Indianapolis, IN 462804098
One set of plans shall be submitted with this application.
1. Project Title: Jackson's Grant Village, Section 2
Location: Northwest corner of 116th Street and Sorinc MiII Road
Please check county: Boone ❑✓ Hamilton El Marion
2. Project Owner. _Jackson's Grant Real Estate Company, LLC
Address: 13578 East 131st Street Suite 200 Fishers Indiana 46037
Phone: 317-770- Ir3tR Fax Email dwagner@republicdev com
3. Sewer Billing Address (if different from project owner address shown above):
Contact Name: Same as above.
Address
Phone:
4. Engineer. SjOeppelwerth &Associates, Inc
Email
Address: 7965 East 106th Street Fishers Indiana 46036
Phone: 317-5704763 Fax 317-849-5942 Email brobinson@stoeppelwerth.com
5. A site map showing location, acreage and zoning is attached?
M Yes No
6. Number of Acres? 11.869 Attach Legal Description
7. Design Flow: One Equivalent Dwelling Unit (EDU) = 310 gpd
For calculations where space occupancy is unknown please use the following equivalency:
(1 person/ 200 SOFT, 1 person = 20 gpd)
1 Bdrm. Apts.
2 Bdrm. Apts.
52 Single Family Home
Commercial Lots*
(other)
(other)
*list each building separately (other)
@
200 gpd/unit
'i�
Total Average Flow: 16.120 GPD
If an IDEM Construction Permit will be required, attach a copy of the IDEM Sanitary Sewer
Design Summary.
7.(a) is the property zoned for the intended use? ❑✓ Yes EJ No
(b) If yes, what is the zoning class? PUD
8. Facility Description/ Product: 52 Single -Family Residential Lots
Pagel
(Rev, 08-18)
9. Project Description: Continuation of the sanitary sewer mains from Jackson's Grant on
Williams Creek subdivision.
10. Construction Schedule:
Start Construction: June 2022
Complete Construction: June 2027
11. The Plan
Review and Inspection Fee is
due with this
application.
1,018
Lineal Foot of sewer x $5.00
= 15,090,00
Amount Due
The Interceptor fee of $4,075.00 per acre is due prior to the start of construction. The
EDU and Application Fees are due prior to the issuance of a Connection Permit. The
design and construction of this project shall comply with all applicable District
Ordinances and State Standards.
To the best of my knowledge and belief, the above project data is complete and accurate.
140 " O' It 'lA� 5� VC March 16 2022
caner/Owner's gent Da e
Douglas B. Wagner
Paget (Rev.08-18)