HomeMy WebLinkAboutDPI013.C1.0.DPTOPOGRAPHIC & BOUNDARY NOTE ALL EXISTING HORIZONTAL AND VERTICAL INFORMATION HAS BEEN SHOWN PER AN ALTA/ACSM LAND TITLE SURVEY, DATED 09/21/10 (JOB #: B33185) AND TOPOGRAPHIC SURVEY (JOB #: B34158) PREPARED BY MILLER SURVEYING, INC. CIVIL SITE GROUP, INC. CANNOT BE HELD RESPONSIBLE IF ACTUAL HORIZONTAL AND VERTICAL DATA IS DIFFERENT FROM THAT SHOWN ON THESE PLANS. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO COMMENCING WITH CONSTRUCTION. ul :A ss ST ST EXISTING CONDITIONS NOTE CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS, INCLUDING UTILITIES AND DRAINAGE INFRASTRUCTURE BEFORE COMMENCING WITH CONSTRUCTION. CONTRACTOR TO NOTIFY ENGINEER OF ANY DISCREPANCIES. SWPPP INITIAL CONTROLS CONTRACTOR TO INSTALL ALL INITIAL EROSION CONTROL MEASURES INDICATED ON SHEET C4.0 PRIOR TO COMMENCING WITH CONSTRUCTION. UTILITY LOCATE NOTE INDIANA 811 FAILED TO LOCATE ALL EXISTING UTILITIES ON AND/OR SURROUNDING THE SUBJECT SITE; THEREFORE, CONTRACTOR IS RESPONSIBLE TO LOCATE AND FIELD VERIFY ANY EXISTING UTILITIES BEFORE COMMENCING WITH CONSTRUCTION. CIVIL SITE GROUP, INC. CANNOT BE HELD RESPONSIBLE IF THE PROPOSED IMPROVEMENTS INTERFERE WITH ANY EXISTING UTILITY INFORMATION NOT SHOWN ON THESE PLANS. w, 1 I # Know whatt below. Call before you dig. I Fr..FNn• L:IM NORTH 20 0 10 20 ( IN FEET ) 1 inch = 20. PROPERTY BOUNDARY SAWCUT LIMITS (WHERE NECESSARY -TO BE CONFIRMED WITH OWNER & ARCHITECT) APPROXIMATE DEMOLITION LIMITS DEMOLITION & REMOVAL OF PAVEMENT, SIDEWALK, CURB, UTILITIES, BOLLARDS APPROXIMATE LIMITS OF PAVEMENT MILLING, ASPHALT WEDGING/LEVELING, AND NEW SURFACE COURSE AS NEEDED TO TRANSITION INTO EXISTING PAVEMENT PLAN NOTES: O DEMOLISH & REMOVE EXISTING PAVEMENT/SIDEWALK (SAWCUT WHERE NECESSARY) O2 SAWCUT & REMOVE EXISTING PAVEMENT FOR ROOF DRAIN LINE INSTALLATION DEMOLITION NOTES 1. OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF ITEMS OR STRUCTURES TO BE DEMOLISHED. 2. ITEMS INDICATED TO BE REMOVED BUT OF SALVABLE VALUE TO CONTRACTOR MAY BE REMOVED AS WORK PROGRESSES. 3. STORAGE OR SALE OF REMOVED ITEMS ON SITE WILL NOT BE PERMITTED. 4. PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION AS NEEDED TO PROTECT OWNER'S PERSONNEL AND THE GENERAL PUBLIC FROM INJURY DUE TO THE DEMOLITION AREA. 5. REPAIR ALL INCIDENTAL DAMAGE TO ADJACENT FACILITIES CAUSED BY GENERAL DEMOLITION AT NO ADDITIONAL COST TO OWNER. 6. CONDUCT SELECTIVE DEMOLITION OPERATIONS AND DEBRIS REMOVAL IN A MANNER TO ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, WALKS, AND OTHER ADJACENT OCCUPIED OR USED FACILITIES. 7. DO NOT CLOSE, BLOCK OR OTHERWISE OBSTRUCT STREETS, WALKS, OR OTHER OCCUPIED OR USED FACILITIES WITHOUT WRITTEN PERMISSION AND/OR REQUIRED PERMITS FROM LOCAL JURISDICTION. PROVIDE ALTERNATE ROUTES AROUND CLOSED OR OBSTRUCTED TRAFFIC WAYS IF REQUIRED BY GOVERNING JURISDICTION. 8. DO NOT INTERRUPT EXISTING UTILITIES SERVING OCCUPIED OR USED FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING FROM UTILITY COMPANY. 9. USE WATER SPRINKLING, TEMPORARY ENCLOSURES, AND OTHER SUITABLE METHODS TO LIMIT DUST, DIRT, AND DEBRIS TO LOWEST PRACTICAL LEVELS. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION. 10. PERFORM SELECTIVE DEMOLITION WORK IN A SYSTEMATIC MANNER. USE SUCH METHODS sl AS NECESSARY TO COMPLETE DEMOLITION SHOWN ON DRAWINGS. Sl 11. DEMOLISH CONCRETE, ASPHALT, AND MASONRY IN SMALL SECTIONS. CUT CONCRETE AND MASONRY AT JUNCTURES WHERE DEMOLITION ENDS AND NEW CONSTRUCTION / IMPROVEMENTS BEGIN USING A MASONRY SAW. DO NOT USE POWER DRIVEN IMPACT TOOLS. SOUTH PROPERTY LINE — — ST ST ST ST —----- ------------------- 12. COMPLETELY FILL BELOW -GRADE AREAS AND VOIDS RESULTING FROM DEMOLITION WORK. PROVIDE FILL CONSISTING OF APPROVED EARTH, GRAVEL OR SAND, FREE OF TRASH AND DEBRIS, STONES OVER 6° DIAMETER, ROOTS ,TOPSOIL, AND OTHER ORGANIC MATTER. 13. REMOVE DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM DEMOLITION OPERATIONS FROM SITE. TRANSPORT AND LEGALLY DISPOSE OF MATERIALS FROM SITE. 14. IF HAZARDOUS MATERIALS ARE ENCOUNTERD DURING DEMOL110N OPERATIONS, COMPLY WITH ALL APPLICABLE REGULATIONS, LAWS, AND ORDINANCES CONCERNING REMOVAL, HANDLING AND PROTECTION AGAINST EXPOSURE OR ENVIRONMENTAL POLLUTION. INS 1.1aN,n,«Tarrya:inrti���►r0iJ0:iI►rr1a1to] ►1J:zO]lot ��r10 16. UPON COMPLETION OF DEMOLITION WORK, REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE PROTECTION BARRICADES AND LEAVE SITE FREE OF DEBRIS. 17. REPAIR DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED. RETURN FACILITIES AND SURFACES TO REMAIN TO THEIR EXISTING CONDITION PRIOR TO COMMENCEMENT OF SELECTIVE DEMOLITION WORK. REPAIR ADJACENT CONSTRUCTION OR SURFACES SOILED OR DAMAGED. 18. INVESTIGATE BUILDING FOUNDATION FOR BASEMENT, CRAWL SPACE, AND OTHER BELOW GRADE AREAS. CONTRACTOR RESPONSIBLE TO FILL ALL BELOW GRADE AREAS WITH SUITABLE FILL MATERIAL TO 95% STANDARD PROCTOR DENSITY (ASTM D-1557). U Z a a O O � � CV WWI ca 0 Cl) Q x c "w Wr, 0 5m r 0 0 a p�� rl- �0000 ~� Uj E = M .� c/ ♦ co W V ,,��111111/I��I ♦.���P'N s CC4 00 � ♦Q2 °��G\STER�. �� �i ° O° No s PE10910647 e = ' STATE OF e o . �Lp I AN • `� �I �� °O•oo•oo•° G\ DATE: 05/17/2021 0 Q Q V Q Q CV UD V w H V F� W FN� w H W PROJECT NUMBER DPI. 013 DRAWING NUMBER Cl 00 SHEET 2 OF 12 DWN BY: BSC CHKD. BY: EAG SCALE: 1" = 20' DATE: 05/17/21