Loading...
HomeMy WebLinkAboutC-1000 SPECIFICATIONSCARMEL POLICE HEADQUARTERSDIRECTORY PATH: R:\Active\Carmel\Police Headquarters\Design\CAD\PlansFILENAME: C-1000 SPECIFICATIONS.dwgDATE/USER: 12/20/2021 3:52 PM / DpelosoIIDevelopment ConsultantsTransportation &C-1000 C-1000SPECIFICATIONSEARTHWORK 1. SCOPE OF WORK 2. BENCH MARKS 3. REMOVAL OF TREES 4. HANDLING OF TOPSOIL 5. DISPOSITION OF UTILITIES 6. SITE GRADING 7. EARTH WORK BALANCE WATER LINE SYSTEM 1. SCOPE OF WORK 2. MATERIALS 3. APPLICATION CITY OF CARMEL RIGHT-OF-WAY PAVING POLICY 1. GENERAL 2. FOUNDATION CITY OF CARMEL CONCRETE CURB POLICY 1. General 2. Foundation 3. Aggregate Bases 5. INSPECTIONS ” STORM SEWER SYSTEMS 1. SCOPE OF WORK 2. STORM SEWER CONSTRUCTION 3. APPLICATION 3. AGGREGATE BASES 4. ASPHALT PAVEMENT 4. Concrete Curb 5. Inspections 6. Acceptance COMMUNICATION CONDUITS “ ”” SANITARY SEWER SYSTEMS 1. SCOPE OF WORK 2. MATERIALS 3. APPLICATION DECORATIVE ASPHALT BLOCK C.Prevailing Specifications: 2016, INDOT Standard Specifications Section 610 1. 2. A. (i) (ii)””” (iii) (iv) B. (i) (i) (ii) (iii) C. (i) D. (i) (i) (ii) (ii) (i) (ii)  (iii) (i) 3.MOCK UP 4.INSTALLATION SHALL BE IN ACCORDANCE WITH THE FOLLOWING: A. B. C. D. E. F. G. H. I. J. K. L. M. N. O. P Q (i) (ii) A. B. C. 3. 4. 5. A. B. C. D. E. (i) (ii) F. G. H.