Loading...
HomeMy WebLinkAboutID200A_-_ENLARGED_GROUND_FLOOR_FINISH_PLAN_-_AREA_AMM Roll Call 010 Roll Call Sergeants 009 Vestibule 001 Roll Call Meeting Room 003 Operations Major 024 Break Room 015 Elec. 014 Jan. 013 Mech. 012 IT 011 Vest. 016 Stair ST-4 Women's RR 017 Men's RR 018 Roll Call Lietenants 007 Roll Call Lietenants 006 Operations Lieutenant 005 Evidence Log-In 020 Corridor 004 Elev. Equip. 008 Elevator EL Stair ST7-1 Stor. 021 Mech. 022 MDF 023 CSI Technicians 028 Vestibule 029 Housekeeping 030 Storage 032 Polygraph 033 Corridor 019 Crime Lab 031 RR 025 RR 026 Mech. 027 OBS 034 Hold 040 Hold 041 Hold 042 Vented Room 046 Elec. 048 RR 044 Vest. 039 Corridor 038 Stair ST3-1 Vehicle Impound 045 Storage 047 Intake Vestibule 049 Processing 043 Interview 036 Interview 035 3 ID203 8 ID203 11 ID203 ID404 1 ID404 2 3 CPT4 B3 P1 CPT4 B3 P1 CPT4 B3 P1 CPT5 B3 P1 CPT4 B3 P1 LVT1 B3 P1 LVT1 B3 P1 CPT5 B3 P1 CPT5 B3 P1 CPT5 B3 P1 LVT1 B3 P1 WOM1 F1 P1 VCT1 B3 P1 CON1 B3 P1 CON1 VCT1 CON1 WT6 P1 B3 VCT1 B3 P1 CPT2 P1 WOM1 P1 B3 VCT1 B3 P1 CON1 B3 P1 WOM1 P1 B3 LVT1 B3 P1 B3 P1 LVT1 B3 WC3 CPT5 B3 P1 CPT5 B3 WC3 CPT5 B3 WC3 CPT5 ID4044 5 ID404 6 ID4048 ID404 10 ID404 119 ID404 12 ID404 13 ID404 14 15 ID405 1 2 P1 F1 P1 F1 P1 F1 P1 F1 P1 F1 P1 F1 P1 F1 P1 F1 P1 F1 P1 F1 P1 F1 WOM1P1 B3 LVT1 B3 P1 SV1 P1 SV1 P1 13 ID203 ID404 16 ID404 7 F6 F8 F10 F10 Elec. 009.1 VCT1 B3 P1 Existing flooring to remain. Clean and repair as necessary. Restroom tile WT2 to extend to 6'-0" a.f.f. with trim piece WT3. Paint above tile. Restroom wall tile to extend to 5'-0" a.f.f. Provide schluter trim piece above tile and paint above tile. Stair to be terrazzo TZ1. Provide wood veneer wainscot at stair/landing WD1. Provide new metal stair railing. Training room to have 18'x32' mat similar to Dollamur Flexi Roll and Flexi Connect Wrestling Mat with 2lb. density closed cell polyurethane foam. Wall mats around perimeter of room to be installed. Wall mats similar to Dollamur Flexi Wall Pads in 2" thickness, 6' tall. Color: black. Existing shelving to remain. Existing drinking fountain to remain. Provide 4" coved integral sheet vinyl base. Provide vinyl wallcovering WC1 on operable partition. Evidence storage rack system tracks to be installed on existing concrete. New VCT1 flooring to be installed on top of tracks. Coordinate with Bradford Systems. Provide tile in Restrooms on all walls. Provide roller shade to suite side of transaction window. Provide shower rod at shower entrance. Provide Sanitary Napkin Receptacle & Toilet Tissue Dispenser at each stall. Provide Toilet Tissue Dispenser at each stall. Provide Combination towel dispenser and waste receptacle. Provide Grab Bar 'U3' 'U4' 'U5' FINISH PLAN NOTES F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 F17 F18 F19 ARCHITECTCLIENT/CMPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS15117 December 17, 2021 Construction Documents ID200AENLARGED GROUNDFLOOR FINISH PLAN -AREA ACARMEL POLICE STATIONADDITIONSCALE: 1/8" = 1'-0"1 Enlarged Ground Floor Finish Plan - Area A #DESCRIPTION DATE