HomeMy WebLinkAboutID200A_-_ENLARGED_GROUND_FLOOR_FINISH_PLAN_-_AREA_AMM
Roll Call
010
Roll Call Sergeants
009
Vestibule
001
Roll Call
Meeting Room
003
Operations
Major
024
Break Room
015
Elec.
014
Jan.
013
Mech.
012
IT
011
Vest.
016
Stair
ST-4
Women's
RR
017
Men's
RR
018
Roll Call
Lietenants
007
Roll Call
Lietenants
006
Operations
Lieutenant
005
Evidence
Log-In
020
Corridor
004
Elev. Equip.
008
Elevator
EL
Stair
ST7-1
Stor.
021
Mech.
022
MDF
023
CSI
Technicians
028
Vestibule
029
Housekeeping
030
Storage
032
Polygraph
033
Corridor
019
Crime Lab
031
RR
025
RR
026
Mech.
027
OBS
034
Hold
040
Hold
041
Hold
042
Vented
Room
046
Elec.
048
RR
044
Vest.
039
Corridor
038
Stair
ST3-1
Vehicle Impound
045
Storage
047
Intake
Vestibule
049
Processing
043
Interview
036
Interview
035
3
ID203
8
ID203
11
ID203
ID404 1
ID404
2
3
CPT4
B3
P1
CPT4
B3
P1 CPT4
B3
P1
CPT5
B3
P1
CPT4
B3
P1
LVT1
B3
P1
LVT1
B3
P1
CPT5
B3
P1
CPT5
B3
P1
CPT5
B3
P1
LVT1
B3
P1
WOM1
F1
P1
VCT1
B3
P1
CON1
B3
P1
CON1 VCT1
CON1
WT6
P1
B3
VCT1
B3
P1
CPT2
P1
WOM1
P1
B3
VCT1
B3
P1
CON1
B3
P1
WOM1
P1
B3
LVT1
B3
P1
B3
P1
LVT1
B3
WC3
CPT5
B3
P1
CPT5
B3
WC3
CPT5
B3
WC3
CPT5
ID4044
5
ID404
6
ID4048
ID404
10
ID404 119
ID404 12
ID404
13
ID404
14
15
ID405 1
2
P1
F1
P1
F1
P1
F1
P1
F1
P1
F1
P1
F1
P1
F1
P1
F1
P1
F1
P1
F1
P1
F1
WOM1P1 B3
LVT1
B3
P1
SV1
P1
SV1
P1
13
ID203
ID404
16
ID404
7
F6
F8
F10
F10
Elec.
009.1
VCT1
B3
P1
Existing flooring to remain. Clean and repair
as necessary.
Restroom tile WT2 to extend to 6'-0" a.f.f.
with trim piece WT3. Paint above tile.
Restroom wall tile to extend to 5'-0" a.f.f.
Provide schluter trim piece above tile and
paint above tile.
Stair to be terrazzo TZ1.
Provide wood veneer wainscot at stair/landing
WD1.
Provide new metal stair railing.
Training room to have 18'x32' mat similar to
Dollamur Flexi Roll and Flexi Connect
Wrestling Mat with 2lb. density closed cell
polyurethane foam. Wall mats around
perimeter of room to be installed. Wall mats
similar to Dollamur Flexi Wall Pads in 2"
thickness, 6' tall. Color: black.
Existing shelving to remain.
Existing drinking fountain to remain.
Provide 4" coved integral sheet vinyl base.
Provide vinyl wallcovering WC1 on operable
partition.
Evidence storage rack system tracks to be
installed on existing concrete. New VCT1
flooring to be installed on top of tracks.
Coordinate with Bradford Systems.
Provide tile in Restrooms on all walls.
Provide roller shade to suite side of
transaction window.
Provide shower rod at shower entrance.
Provide Sanitary Napkin Receptacle & Toilet
Tissue Dispenser at each stall.
Provide Toilet Tissue Dispenser at each stall.
Provide Combination towel dispenser and
waste receptacle.
Provide Grab Bar 'U3' 'U4' 'U5'
FINISH PLAN NOTES
F1
F2
F3
F4
F5
F6
F7
F8
F9
F10
F11
F12
F13
F14
F15
F16
F17
F18
F19 ARCHITECTCLIENT/CMPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS15117
December 17, 2021
Construction Documents
ID200AENLARGED GROUNDFLOOR FINISH PLAN -AREA ACARMEL POLICE STATIONADDITIONSCALE: 1/8" = 1'-0"1 Enlarged Ground Floor Finish Plan - Area A
#DESCRIPTION DATE