No preview available
HomeMy WebLinkAboutID201A_-_ENLARGED_FIRST_FLOOR_FINISH_PLAN_-_AREA_A8 G EF D C B A H J K L 9 10 11 127654321 Investigations 152 Investigations Sergeant 153 Stair ST-3 Mech./Elec. 151 Storage 150 Investigations Lieutenant 149 Investigations Conference 146 Corridor 145 Investigations Sergeant 148 Investigations Sergeant 147 Investigations Divisions Commander 162 Investigations Prosecutor 163 Chaplain 164 Deputy Chief of Operations 165 Elevator EL Stair ST-5 Storage 156 Mech. 161 DTF Entry 154 Mech. 155 IDF 144 Intel Storage 142 Drug Task Force 157Reception 166 Intel Sergeant 143 DTF Sergeants 158 DTF Lieutenant 159 Storage 160 Personnel Storage 167 Assistant Chief 169 RR 170 Chief's Office 171 Major 173 Lieutenant 174 Chief's Secretary 172 Conference 168 Coffee 177 Elec. 178 Corridor 145 Operations Major 175 Operations Lieutenant 176 Stair ST-4 Women's RR 179 Men's RR 180 7 ID203 3 ID203 ID405 4 CPT5 P1 B3 CPT5 P1 B3 P1 F1 CPT4 P1 B3 CPT5 P1 B3 CPT5 P1 B3 CPT4 P1 B2 CPT4 P1 B2 CPT3 WC1 B2CPT5 P1 B3 CPT4 P1 B3 CPT5 P1 B3 CPT5 P1 B3 CPT5 P1 B3 CPT5 P1 B3 CPT5 P1 B3 CPT5 P1 B3 CPT5 P1 B3 CPT5 P1 B3 CPT4 P1 B3 CPT5 P1 B3 CPT5 P1 B3 CPT5 P1 B3 CPT4 P1 B3 CPT4 P1 B3 CPT5 P1 B3 P1 F1 CON1 P1 CPT4 P1 B2 VCT1 P1 B3 LVT1 P1 B3 CPT4 P1 B3 CON1 P1 B3 CPT4 P1 B3 LVT1 CPT2 P1F6 LVT1P1 B3 CON1 LVT1 P1 B3 LVT1 P1 B3 ID405 16 ID406 5 LVT1 P1 B3 Existing flooring to remain. Clean and repair as necessary. Restroom tile WT2 to extend to 6'-0" a.f.f. with trim piece WT3. Paint above tile. Restroom wall tile to extend to 5'-0" a.f.f. Provide schluter trim piece above tile and paint above tile. Stair to be terrazzo TZ1. Provide wood veneer wainscot at stair/landing WD1. Provide new metal stair railing. Training room to have 18'x32' mat similar to Dollamur Flexi Roll and Flexi Connect Wrestling Mat with 2lb. density closed cell polyurethane foam. Wall mats around perimeter of room to be installed. Wall mats similar to Dollamur Flexi Wall Pads in 2" thickness, 6' tall. Color: black. Existing shelving to remain. Existing drinking fountain to remain. Provide 4" coved integral sheet vinyl base. Provide vinyl wallcovering WC1 on operable partition. Evidence storage rack system tracks to be installed on existing concrete. New VCT1 flooring to be installed on top of tracks. Coordinate with Bradford Systems. Provide tile in Restrooms on all walls. Provide roller shade to suite side of transaction window. Provide shower rod at shower entrance. Provide Sanitary Napkin Receptacle & Toilet Tissue Dispenser at each stall. Provide Toilet Tissue Dispenser at each stall. Provide Combination towel dispenser and waste receptacle. Provide Grab Bar 'U3' 'U4' 'U5' FINISH PLAN NOTES F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 F17 F18 F19 ARCHITECTCLIENT/CMPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS15117 December 17, 2021 Construction Documents ID201AENLARGED FIRSTFLOOR FINISH PLAN -AREA ACARMEL POLICE STATIONADDITIONSCALE: 1/8" = 1'-0"1 Enlarged First Finish Floor - Area A #DESCRIPTION DATE