HomeMy WebLinkAboutID201B_-_ENLARGED_FIRST_FLOOR_FINISH_PLAN_-_AREA_BUP
UP
Women's
Restroom
107
Jan.
108
Public Info
Lieutenant
121
Public Info
Sergeant
123
Public Info
Office
125
Public Info
Office
126
Community
Resource
Officer
127
Elec.
128
Production Space
122
Interview
117
Lobby
100
Stair
ST-2
Police Records
113
Records Supervisor
114
Mail and Packages
112
Break
135
Building
Connector
134
Women's
Restroom
137
Men's
Restroom
138
Expansion
139
Corridor
131 Corridor
111
Storage
130
IDF
129
Stair
ST-1
Staff Elev.
EL-2
Corridor
131
Expansion
133
Conference
109
Training
110 A
Training
110 A
Vestibule
103
Mech
104
Vestibule
101
Mech
102
Elevator
EL-3
Men's
Restroom
105
Jan.
106
Lobby
100
F2
F4 F5
TZ3
TZ2
TZ1
TZ2
TZ2
TZ1
TZ3
TZ3
WD1
P1
WT1 WT1
TZ1P1 B1
CPT3
WC1
B2
CON1
P1
B3
CPT4P1 B3
RT1
P1
LVT1
P1
B1
VCT1
P1
B3
CPT4
WC1
B2
CON1
P1
B3
LVT1
P4
B3
CPT4P1 B3 CPT4P1 B3
CPT4
P1
B3
CPT5
P1
B3
CPT4
P1
B3
CPT5
P1
B3
CPT5
P1
B3
CPT5
P1
B3
CPT5
P1
B3
CPT5
P1
B3
CPT4
P1
B3
CPT5
P1
B3
CPT4
WC1
B2
LVT1
P1
B3
LVT1
P1
B3
CPT4
P1
B3
VCT1
P1
B3
TZ2
TZ2
TZ2
TZ2
TZ2
TZ2
TZ2
TZ2
TZ2
TZ2
TZ3 TZ3
TZ1
TZ1
TZ1
TZ1 TZ1
TZ1
TZ1
TZ1
TZ3
TZ3
TZ3
TZ3
TZ3
TZ3
WOM1
WOM1
F2
2
ID203
5
ID203
4
ID203
6
ID203
ID405 5 ID405 67
ID405
8
ID405 9
ID4001 2 ID4011
RT1
P1
P1
B2
P1
B2
CON1
P1
WT2
TZ1
LVT1
LVT1
CON1
P1Storage
115
ID405
10
ID406
4
Public Info Office
124
Storage
116
Open Office
119
WT2
WT1
LVT1
P1
B3
WD1
WD1
WD1
WD1
WD1
TZ3
TZ3
F11
F14
WD1
WD1
WD1
WD1
WD1
WD1
WD1
WD1
Existing flooring to remain. Clean and repair
as necessary.
Restroom tile WT2 to extend to 6'-0" a.f.f.
with trim piece WT3. Paint above tile.
Restroom wall tile to extend to 5'-0" a.f.f.
Provide schluter trim piece above tile and
paint above tile.
Stair to be terrazzo TZ1.
Provide wood veneer wainscot at stair/landing
WD1.
Provide new metal stair railing.
Training room to have 18'x32' mat similar to
Dollamur Flexi Roll and Flexi Connect
Wrestling Mat with 2lb. density closed cell
polyurethane foam. Wall mats around
perimeter of room to be installed. Wall mats
similar to Dollamur Flexi Wall Pads in 2"
thickness, 6' tall. Color: black.
Existing shelving to remain.
Existing drinking fountain to remain.
Provide 4" coved integral sheet vinyl base.
Provide vinyl wallcovering WC1 on operable
partition.
Evidence storage rack system tracks to be
installed on existing concrete. New VCT1
flooring to be installed on top of tracks.
Coordinate with Bradford Systems.
Provide tile in Restrooms on all walls.
Provide roller shade to suite side of
transaction window.
Provide shower rod at shower entrance.
Provide Sanitary Napkin Receptacle & Toilet
Tissue Dispenser at each stall.
Provide Toilet Tissue Dispenser at each stall.
Provide Combination towel dispenser and
waste receptacle.
Provide Grab Bar 'U3' 'U4' 'U5'
FINISH PLAN NOTES
F1
F2
F3
F4
F5
F6
F7
F8
F9
F10
F11
F12
F13
F14
F15
F16
F17
F18
F19 ARCHITECTCLIENT/CMPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS15117
December 17, 2021
Construction Documents
ID201BENLARGED FIRSTFLOOR FINISH PLAN -AREA BCARMEL POLICE STATIONADDITIONSCALE: 1/8" = 1'-0"1 Enlarged First Floor Finish Plan - Area B
#DESCRIPTION DATE