HomeMy WebLinkAboutID202A_-_ENLARGED_SECOND_FLOOR_FINISH_PLAN_-_AREA_AStorage
247
Office
248
Mechanical
249
Corridor
250
Mechanical
252
Stair
ST-4
Electrical
251
IT Storage
246
Elevator
EL
Corridor
245
Evidence
237
Secured Evidence
238
IDF
235
Corridor
234
Storage
240
Office
241
Storage
242
Mech./Elec.
243
Stair
ST-3
Mechanical
244
Corridor
234
ID405
11
CON1
P1
B3
CPT5
P1
B3 CON1
P1
B3
CON1
P1
B3 CON1
P1
B3
CON1
P1
B3
CON1
P1
B3
CON1
P1
B3
CON1
P1
B3 CON1
P1
B3
VCT1
P1
B3
VCT1
P1
B3
CPT5
P1
B3
CON1
P1
B3
CON1
P1
B3
P1
B3
VCT1
CON1
P1
B3
CON1
P1
B3
CON1
P1
B3
CON1
P1
B3
P1
F1
Evidence Storage
239
Evidence Storage
239 F12
F12
Existing flooring to remain. Clean and repair
as necessary.
Restroom tile WT2 to extend to 6'-0" a.f.f.
with trim piece WT3. Paint above tile.
Restroom wall tile to extend to 5'-0" a.f.f.
Provide schluter trim piece above tile and
paint above tile.
Stair to be terrazzo TZ1.
Provide wood veneer wainscot at stair/landing
WD1.
Provide new metal stair railing.
Training room to have 18'x32' mat similar to
Dollamur Flexi Roll and Flexi Connect
Wrestling Mat with 2lb. density closed cell
polyurethane foam. Wall mats around
perimeter of room to be installed. Wall mats
similar to Dollamur Flexi Wall Pads in 2"
thickness, 6' tall. Color: black.
Existing shelving to remain.
Existing drinking fountain to remain.
Provide 4" coved integral sheet vinyl base.
Provide vinyl wallcovering WC1 on operable
partition.
Evidence storage rack system tracks to be
installed on existing concrete. New VCT1
flooring to be installed on top of tracks.
Coordinate with Bradford Systems.
Provide tile in Restrooms on all walls.
Provide roller shade to suite side of
transaction window.
Provide shower rod at shower entrance.
Provide Sanitary Napkin Receptacle & Toilet
Tissue Dispenser at each stall.
Provide Toilet Tissue Dispenser at each stall.
Provide Combination towel dispenser and
waste receptacle.
Provide Grab Bar 'U3' 'U4' 'U5'
FINISH PLAN NOTES
F1
F2
F3
F4
F5
F6
F7
F8
F9
F10
F11
F12
F13
F14
F15
F16
F17
F18
F19 ARCHITECTCLIENT/CMPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS15117
December 17, 2021
Construction Documents
ID202AENLARGED SECONDFLOOR FINISH PLAN -AREA ACARMEL POLICE STATIONADDITIONSCALE: 1/8" = 1'-0"1 Enlarged Second Floor Finish Plan - Area A
#DESCRIPTION DATE