Loading...
HomeMy WebLinkAboutID202A_-_ENLARGED_SECOND_FLOOR_FINISH_PLAN_-_AREA_AStorage 247 Office 248 Mechanical 249 Corridor 250 Mechanical 252 Stair ST-4 Electrical 251 IT Storage 246 Elevator EL Corridor 245 Evidence 237 Secured Evidence 238 IDF 235 Corridor 234 Storage 240 Office 241 Storage 242 Mech./Elec. 243 Stair ST-3 Mechanical 244 Corridor 234 ID405 11 CON1 P1 B3 CPT5 P1 B3 CON1 P1 B3 CON1 P1 B3 CON1 P1 B3 CON1 P1 B3 CON1 P1 B3 CON1 P1 B3 CON1 P1 B3 CON1 P1 B3 VCT1 P1 B3 VCT1 P1 B3 CPT5 P1 B3 CON1 P1 B3 CON1 P1 B3 P1 B3 VCT1 CON1 P1 B3 CON1 P1 B3 CON1 P1 B3 CON1 P1 B3 P1 F1 Evidence Storage 239 Evidence Storage 239 F12 F12 Existing flooring to remain. Clean and repair as necessary. Restroom tile WT2 to extend to 6'-0" a.f.f. with trim piece WT3. Paint above tile. Restroom wall tile to extend to 5'-0" a.f.f. Provide schluter trim piece above tile and paint above tile. Stair to be terrazzo TZ1. Provide wood veneer wainscot at stair/landing WD1. Provide new metal stair railing. Training room to have 18'x32' mat similar to Dollamur Flexi Roll and Flexi Connect Wrestling Mat with 2lb. density closed cell polyurethane foam. Wall mats around perimeter of room to be installed. Wall mats similar to Dollamur Flexi Wall Pads in 2" thickness, 6' tall. Color: black. Existing shelving to remain. Existing drinking fountain to remain. Provide 4" coved integral sheet vinyl base. Provide vinyl wallcovering WC1 on operable partition. Evidence storage rack system tracks to be installed on existing concrete. New VCT1 flooring to be installed on top of tracks. Coordinate with Bradford Systems. Provide tile in Restrooms on all walls. Provide roller shade to suite side of transaction window. Provide shower rod at shower entrance. Provide Sanitary Napkin Receptacle & Toilet Tissue Dispenser at each stall. Provide Toilet Tissue Dispenser at each stall. Provide Combination towel dispenser and waste receptacle. Provide Grab Bar 'U3' 'U4' 'U5' FINISH PLAN NOTES F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 F17 F18 F19 ARCHITECTCLIENT/CMPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS15117 December 17, 2021 Construction Documents ID202AENLARGED SECONDFLOOR FINISH PLAN -AREA ACARMEL POLICE STATIONADDITIONSCALE: 1/8" = 1'-0"1 Enlarged Second Floor Finish Plan - Area A #DESCRIPTION DATE