HomeMy WebLinkAboutID302A_-_ENLARGED_SECOND_FLOOR_REFLECTED_CEILING_PLAN_-_AREA_AExisting ceiling to remain, if any existing
ceiling needs repair/ replacements do to as
new conditions.
Portion of existing ceiling to be demolished
due to removal of existing plumbing. Patch and
repair as necessary.
Existing ceiling/lighting to remain.
Provide allowance for specialty lighting above
center millwork island. Provide under cabinet
lighting.
Raised portion of ceiling to be Armstrong
Acousti-built. Refer to ceiling schedule on
ID002 for more information.
Ceiling bulkhead to be wood veneer WD1
Ceiling to be Armstrong Plasterform. Refer to
ceiling schedule on ID002 for more
information.
Refer to ceiling detail #7 on ID402.
CEILING PLAN NOTES
C1
C2
C3
C4
C5
C6
C7
C8
LF1 CUSTOM CHANDELIER PUBLIC LOBBY
LF2 CUSTOM PENDANT
LF3 CUSTOM COURTROOM CHANDELIER
LF4 CUSTOM POST LIGHT AT STAIR
LF5 CUSTOM WALL SCONCE
LF6 HIGH CEILING DOWNLIGHT
LF7 2'X2' RECESSED LAY-IN FIXTURE
LF8 GENERAL DOWNLIGHT
LF9 RESTROOM WALL SCONCE
LF10 COVE LIGHT
LF11 SUSPENDED LINEAR FIXTURE
CEILING LEGEND
8
G
EF
D
C
B
A
H
J
K
L
9 10 11 127654321
LF11
C3
C1
C1
C1
C1 C1
C1
C1
C1
C1
C1
LF11 LF11
LF11 LF11
LF11
LF11
LF11
LF11
LF11
LF11
LF11
LF11
LF11
LF11
LF11 LF11
LF11 LF11
LF11 LF11
LF11 LF11WS1A
WS1A
D
WS6
D
WS6
D WS1ADWS1A
WS6DWS1ADWS6DMechanical
244
Stair
ST-3
Storage
242
Mech./Elec.
243
Corridor
234
Office
241
Storage
240
Evidence Storage
239
Elevator
ELIT Storage
246
Corridor
245
Storage
247
Office
248
Mechanical
249
Electrical
251Stair
ST-4Mechanical
252
Corridor
250
IDF
235
Evidence
237 Secured Evidence
238
Storage
236
WS1A
D ARCHITECTCLIENT/CMPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS15117
December 17, 2021
Construction Documents
ID302AENLARGED SECONDFLOOR REFLECTEDCEILING PLAN - AREA ACARMEL POLICE STATIONADDITIONSCALE: 1/8" = 1'-0"1
Enlarged Second Floor Reflected Ceiling Plan -
Area A
#DESCRIPTION DATE