Loading...
HomeMy WebLinkAboutID302A_-_ENLARGED_SECOND_FLOOR_REFLECTED_CEILING_PLAN_-_AREA_AExisting ceiling to remain, if any existing ceiling needs repair/ replacements do to as new conditions. Portion of existing ceiling to be demolished due to removal of existing plumbing. Patch and repair as necessary. Existing ceiling/lighting to remain. Provide allowance for specialty lighting above center millwork island. Provide under cabinet lighting. Raised portion of ceiling to be Armstrong Acousti-built. Refer to ceiling schedule on ID002 for more information. Ceiling bulkhead to be wood veneer WD1 Ceiling to be Armstrong Plasterform. Refer to ceiling schedule on ID002 for more information. Refer to ceiling detail #7 on ID402. CEILING PLAN NOTES C1 C2 C3 C4 C5 C6 C7 C8 LF1 CUSTOM CHANDELIER PUBLIC LOBBY LF2 CUSTOM PENDANT LF3 CUSTOM COURTROOM CHANDELIER LF4 CUSTOM POST LIGHT AT STAIR LF5 CUSTOM WALL SCONCE LF6 HIGH CEILING DOWNLIGHT LF7 2'X2' RECESSED LAY-IN FIXTURE LF8 GENERAL DOWNLIGHT LF9 RESTROOM WALL SCONCE LF10 COVE LIGHT LF11 SUSPENDED LINEAR FIXTURE CEILING LEGEND 8 G EF D C B A H J K L 9 10 11 127654321 LF11 C3 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 LF11 LF11 LF11 LF11 LF11 LF11 LF11 LF11 LF11 LF11 LF11 LF11 LF11 LF11 LF11 LF11 LF11 LF11 LF11 LF11 LF11 LF11WS1A WS1A D WS6 D WS6 D WS1ADWS1A WS6DWS1ADWS6DMechanical 244 Stair ST-3 Storage 242 Mech./Elec. 243 Corridor 234 Office 241 Storage 240 Evidence Storage 239 Elevator ELIT Storage 246 Corridor 245 Storage 247 Office 248 Mechanical 249 Electrical 251Stair ST-4Mechanical 252 Corridor 250 IDF 235 Evidence 237 Secured Evidence 238 Storage 236 WS1A D ARCHITECTCLIENT/CMPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS15117 December 17, 2021 Construction Documents ID302AENLARGED SECONDFLOOR REFLECTEDCEILING PLAN - AREA ACARMEL POLICE STATIONADDITIONSCALE: 1/8" = 1'-0"1 Enlarged Second Floor Reflected Ceiling Plan - Area A #DESCRIPTION DATE