Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
15117_-_A021_-_Floor_Roof_Assemblies
A021Floor and Roof AssembliesSCALE:Floor AssemblyF11 1/2" = 1'-0"6 MIL UNDERSLABVAPOR RETARDER6" DRAINAGE FILL, SEE STRUCTURALDRAWINGSCONCRETE SLAB ON GRADE,SEE STRUCTURAL DRAWINGS.USE: SLAB ON GRADECOMPACTED SUB-GRADE,SEE CIVIL DRAWINGS.SCALE:Floor AssemblyF21 1/2" = 1'-0"USE: FLOOR ABOVE GARAGESCALE:Floor AssemblyF31 1/2" = 1'-0"USE: TYPICAL FLOOR SYSTEM4" CONCRETE TOPPINGPRECAST PLANKS,SEE STRUCTURAL DRAWINGSSCHEDULED FINISHSCHEDULED FINISHSTEEL DECK WITH CONCRETE SLAB, SEESTRUCTURAL DRAWINGSSTEEL BEAM,SEE STRUCTURAL DRAWNGSSCALE:Floor AssemblyF41 1/2" = 1'-0"USE: LOBBY FLOORSCHEDULED FINISHSTEEL DECK WITH CONCRETE SLAB, SEESTRUCTURAL DRAWINGSSTEEL BEAM,SEE STRUCTURAL DRAWNGSSCALE:Roof AssemblyRC11 1/2" = 1'-0"ROOF PAVER & PEDESTAL SYSTEM.HOLLOW CORE CONCRETE PLANKS.DEPTH VARIES, SEE STRUCTURALDRAWINGS.SYNTHETIC SLATE SHINGLESEXT. PLYWOOD SHEATHINGPER STRUCTURAL DWGS.ONE LAYER 15# ROOF FELT. EDGE METAL @ BOTTOM OFSLOPED ROOF SHOULD BE OVERLAPPED BY ROOFINGFELT. EDGE METAL @ GABLE ENDS SHOULD OVERLAPROOFING FELT.USE: PITCHED ROOFSCALE:Roof AssemblyRW11 1/2" = 1'-0"SPRAY FOAM INSULATIONTO ACHIEVE R-20 R-VALUE.SCALE:Roof AssemblyRS11 1/2" = 1'-0"USE: TYPICAL MEMBRANEROOFSTEEL BEAM,SEE STRUCTURAL DRAWINGSPOLYISOCYANURATE ROOF INSULATION TOACHIEVE R-20 R-VALUE. ADD TAPEREDINSULATION WHERE REQUIRED TO ACHIEVEPOSITIVE DRAINAGE TO ROOF DRAINLOCATIONS.STEEL DECKING. SEE STRUCTURALDRAWINGS0.45 MIL TPO ROOFING MEMBRANE. INDUCTIONWELDED TO ROOF INSULATION PERMANUFACTURERS REQUIREMENTS.SCALE:Roof AssemblyRS21 1/2" = 1'-0"USE: BALCONY ABOVEOCCUPIED SPACESTEEL BEAM,SEE STRUCTURAL DRAWINGSSTEEL DECK WITH CONCRETE SLAB,SEE STRUCTURAL DRAWINGSCONCRETE TOPPING; SLOPE TO ACHIEVE POSITIVEDRAINAGE.SCALE:Ceiling AssemblyC11 1/2" = 1'-0"USE: TYPICAL GYP. CEILING5/8" TYPE 'C' GYPSUM BOARDFLOOR ASSEMBLY (ABOVE)DRYWALL CEILINGSUSPENSION SYSTEMSCALE:Ceiling AssemblyC21 1/2" = 1'-0"ACOUSTICAL CEILING TILESCEILING SUSPENSION SYSTEM.USE: TYPICAL CEILINGFLOOR ASSEMBLY (ABOVE)BRASS DIVIDERARCHITECTPROJECTDRAWING TITLESEALSHEETPROJECT INFO REVISIONS15117 Carmel Police Station Addition CLIENT/CM#DESCRIPTIONDATEDecember 17, 2021Construction Documents3 Civic Square Carmel, IN 46032 12" COVER BOARDPOLYISOCYANURATE ROOF INSULATION TO ACHIEVER-20 R-VALUE. ADD TAPERED INSULATION WHEREREQUIRED TO ACHIEVE POSITIVE DRAINAGE TOROOF DRAIN LOCATIONS.0.60 MIL TPO ROOFING MEMBRANE. INDUCTIONWELDED TO ROOF INSULATION PERMANUFACTURERS REQUIREMENTS.12" COVER BOARDFLUID APPLIED TRAFFIC COATING MEMBRANEPOLYISOCYANURATE ROOF INSULATION TOACHIEVE R-20 R-VALUESHEET MEMBRANE WATERPROOFINGROOF TRUSS PERSTRUCTURAL DWGS.ROOF ASSEMBLY (ABOVE)5/8" TYPE 'X' EXTERIOR GRADEGYPSUM BOARD.3-5/8" 20GA. METAL STUD FRAME AT16" O.C. (REFER TO STRUC. SPEC's)SCALE:Ceiling AssemblyC31 1/2" = 1'-0"USE: TYPICAL EXTERIOR GYP. CEILING