HomeMy WebLinkAbout15117_-_A200A_-_ENLARGED_FIRST_FLOOR_PLAN_-_AREA_AMM
A302 3
Break Room
015 016015Vest.
016
Stair
ST-4
Elec.
014
Jan.
013
Roll Call
010010A 012010Mech.
012
IT
011
009A
Women's
RR
017
Men's
RR
018
017 018
Roll Call Sergeants
009009Elev. Equip.
008
008Elevator
EL
Evidence
Log-In
020
Operations
Lieutenant
005
Roll Call
Lietenants
006
Roll Call
Lietenants
007
006005020Vestibule
001
Corridor
004
001002Roll Call
Meeting Room
003
Operations
Major
024
Mech.
022
MDF
023
Stair
ST7-1
003 022023
024025 026RR
025
RR
026
028
CSI
Technicians
028
050A029Vestibule
029
Corridor
019 030.C030027
Housekeeping
030
Polygraph
033
Storage
032
Mech.
027
Crime Lab
031
031 032033034
035036
OBS
034
Interview
035
Interview
036
Hold
042
Hold
041
Hold
040
Processing
043
Corridor
038
Stair
ST3-1 Vest.
039
RR
044
Intake
Vestibule
049
Elec.
048
Storage
047
Corridor
037
037038ST-3.A045039040041042049044048
047
Vehicle Impound
045 050B
050.E
WX WX
WXWXWX
014 013
043
0158
G
EF
D
C
B
A
H
J
K
L
9 10 11 127654321
142400-1
Vented
Room
046
Stor.
021021 046
37' - 4 1/4"25' - 11 1/2"9' - 8 1/8"20' - 0 3/8"12' - 3 1/2" 8' - 5 7/8"22' - 2 3/8"17' - 5 3/8"11' - 6 1/8" 11' - 2 1/2" 8' - 9"15' - 1 5/8"
46' - 7 1/4" VIF
5' - 7 5/8" 5' - 10 1/2" 8' - 9 1/2" 2' - 5" 3' - 7" 5' - 2"8' - 0"5' - 10 1/4"12' - 6 1/4"SEE
A200B
2' - 11 1/8"
A302
2
A302
1
007WS1AI
WS1AI
WS1AI WS1AI WS1AIWS1AIWS1A
WS1A WS1A WS1A
WS3B
WS3BWS3BWS1AI
2
3
0110510' - 8"
1' - 7 1/2"
2WM2WS3B 044.A 044
WS1AI WB12
2
2 2 2
2
WS1AI
WS1AI
WS1AI
WS1AI
WS3AI
WS3AI
Elec.
009.1
009.1WS6WS3B16
16
16
16
6' - 8 3/4"R.O.4' - 6"0' - 6"WS6WS6 WS3CIWS3B
16
16
16 WS3CIWS3CIWS3CI18
3' - 6 1/4"9' - 1 5/8"6' - 7 5/8"17
16
16
15' - 1"16
WB1
WS3A6' - 6"WS1AI
8' - 2 1/4"
22
19' - 8 1/8"12' - 3 1/2"
16 5' - 0"8' - 6 3/16"4' - 0"WS3B
WS1AI
WS3B
WS1A
18
13
ID203
3
ID203
21
22
22
16
17' - 11"1' - 1 5/8"1' - 1 5/8"WS3A
1' - 1 5/8"9' - 0"6" metal bollard
TV. See Electrical and Technology drawings
for power and data requirements. Provide
blocking as required.
Existing fire panel
Mechanical louvers. See MEP drawings for
additional information.
Motorcycle dual port EV chargers
Fingerprint station
Security checkpoint
Electronic forms
36" x 48" automatic wheelchair lift. See
Electrical drawings for power requirements.
Limestone panel. See elevations.
Recessed green screen. Coordinate with
electrical.
Interior metal window grill
Built-in holding cell bench
Provide Binder KBF-S Solid Line Series
Humidity Test Chamber (102L, Stainless
Steel), evidence refrigerator, existing
safes, and stainless steel table.
Painted parking stripes
Align finish face
Mop sink
Existing walls to recieve FRTW sheathing on
top of existing finish layer
Floor drain
Turnstile
New concrete slab on grade infill. Extents
as required in coordination with demolition
and repair of underslab plumbing
Wall infill to match adjacent wall
construction; Align finish faces
Warp concrete to achieve drainage around
column
Decorative exterior railing
Apply privacy film to existing window glazing
See Structural Sheets for structural
reinforcement needed to support
mobile shelving above.
PLAN NOTES
1
2
3
4
5
6
7
8
9
10
11
12
13
* Reference ID300 Reflected Ceiling Plan
Sheets for walls to deck
14
15
16
17
18
19
20
21
22
23
24
25
26
PLAN SPEC KEYNOTES
1. THE GENERAL CONTRACTOR SHALL VERIFY
ALL CONDITIONS AT THE JOBSITE. NOTIFY
ARCHITECT OF ANY DEVIATIONS FROM THOSE
CONDITIONS AS THEY ARE NOTED ON THE
DRAWINGS.
2. THE GENERAL CONTRACTOR SHALL
COORDINATE AND SCHEDULE ALL WORK WITH
THE OWNER.
3. THE GENERAL CONTRACTOR IS
RESPONSIBLE FOR COMPLIANCE WITH ALL
STATE AND LOCAL BUILDING CODES AND
GOVERNMENT REGULATORY AGENCIES.
4. THE GENERAL CONTRACTOR IS TO SUBMIT
SHOP DRAWINGS-PROJECT DATA AND
SAMPLES TO OWNER/ARCHITECT FOR
APPROVAL PRIOR TO FABRICATION OF ALL
MILLWORK AND WALL FINISHES.
5. DO NOT SCALE ANY DRAWING. ANY
DIMENSIONS ARE TO BE OBTAINED FROM THE
ARCHITECT IF NOT NOTED ON THE DRAWINGS.
REFER ALL QUESTIONS TO THE ARCHITECT OR
ENGINEER ON RECORD.
6. ALL DIMENSIONS ARE TO FACE OF FRAMING
U.N.O.
7. THE GENERAL CONTRACTOR SHALL KEEP
ONE SET OF PLANS AT THE JOBSITE FOR THE
SPECIFIC PURPOSE OF RECORDING ACTUAL
CONSTRUCTION CONDITIONS. SUCH PROJECT
RECORD-DOCUMENTS SHALL BE PROVIDED TO
THE OWNER UPON COMPLETION OF THE
PROJECT.
8. THE GENERAL CONTRACTOR SHALL VERIFY
SIZE, LOCATION, AND CHARACTERISTICS OF
ALL WORKS AND EQUIPMENT SUPPLIED BY THE
OWNER OR OTHERS WITH THE MANUFACTURER
OR SUPPLIER PRIOR TO THE START OF THE
WORK.
9. THE GENERAL CONTRACTOR SHALL SEE
THAT ALL SUBCONTRACTORS RECEIVE
COMPLETE WORKING DRAWINGS AND ASSUME
FULL RESPONSIBILITY FOR COORDINATION OF
WORK.
10. SEE ID SHEETS FOR CABINETRY AND
CASEWORK INFORMATION.
GENERAL NOTES
ARCHITECTCLIENT/CMPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS15117
December 17, 2021
Construction Documents
A200AENLARGED FIRSTFLOOR PLAN - AREA ACARMEL POLICE STATIONADDITIONSCALE: 1/8" = 1'-0"1 Enlarged Ground Floor Plan - Area A
#DESCRIPTION DATE
Area A
Area B
Key Plan