Loading...
HomeMy WebLinkAbout15117_-_A200A_-_ENLARGED_FIRST_FLOOR_PLAN_-_AREA_AMM A302 3 Break Room 015 016015Vest. 016 Stair ST-4 Elec. 014 Jan. 013 Roll Call 010010A 012010Mech. 012 IT 011 009A Women's RR 017 Men's RR 018 017 018 Roll Call Sergeants 009009Elev. Equip. 008 008Elevator EL Evidence Log-In 020 Operations Lieutenant 005 Roll Call Lietenants 006 Roll Call Lietenants 007 006005020Vestibule 001 Corridor 004 001002Roll Call Meeting Room 003 Operations Major 024 Mech. 022 MDF 023 Stair ST7-1 003 022023 024025 026RR 025 RR 026 028 CSI Technicians 028 050A029Vestibule 029 Corridor 019 030.C030027 Housekeeping 030 Polygraph 033 Storage 032 Mech. 027 Crime Lab 031 031 032033034 035036 OBS 034 Interview 035 Interview 036 Hold 042 Hold 041 Hold 040 Processing 043 Corridor 038 Stair ST3-1 Vest. 039 RR 044 Intake Vestibule 049 Elec. 048 Storage 047 Corridor 037 037038ST-3.A045039040041042049044048 047 Vehicle Impound 045 050B 050.E WX WX WXWXWX 014 013 043 0158 G EF D C B A H J K L 9 10 11 127654321 142400-1 Vented Room 046 Stor. 021021 046 37' - 4 1/4"25' - 11 1/2"9' - 8 1/8"20' - 0 3/8"12' - 3 1/2" 8' - 5 7/8"22' - 2 3/8"17' - 5 3/8"11' - 6 1/8" 11' - 2 1/2" 8' - 9"15' - 1 5/8" 46' - 7 1/4" VIF 5' - 7 5/8" 5' - 10 1/2" 8' - 9 1/2" 2' - 5" 3' - 7" 5' - 2"8' - 0"5' - 10 1/4"12' - 6 1/4"SEE A200B 2' - 11 1/8" A302 2 A302 1 007WS1AI WS1AI WS1AI WS1AI WS1AIWS1AIWS1A WS1A WS1A WS1A WS3B WS3BWS3BWS1AI 2 3 0110510' - 8" 1' - 7 1/2" 2WM2WS3B 044.A 044 WS1AI WB12 2 2 2 2 2 WS1AI WS1AI WS1AI WS1AI WS3AI WS3AI Elec. 009.1 009.1WS6WS3B16 16 16 16 6' - 8 3/4"R.O.4' - 6"0' - 6"WS6WS6 WS3CIWS3B 16 16 16 WS3CIWS3CIWS3CI18 3' - 6 1/4"9' - 1 5/8"6' - 7 5/8"17 16 16 15' - 1"16 WB1 WS3A6' - 6"WS1AI 8' - 2 1/4" 22 19' - 8 1/8"12' - 3 1/2" 16 5' - 0"8' - 6 3/16"4' - 0"WS3B WS1AI WS3B WS1A 18 13 ID203 3 ID203 21 22 22 16 17' - 11"1' - 1 5/8"1' - 1 5/8"WS3A 1' - 1 5/8"9' - 0"6" metal bollard TV. See Electrical and Technology drawings for power and data requirements. Provide blocking as required. Existing fire panel Mechanical louvers. See MEP drawings for additional information. Motorcycle dual port EV chargers Fingerprint station Security checkpoint Electronic forms 36" x 48" automatic wheelchair lift. See Electrical drawings for power requirements. Limestone panel. See elevations. Recessed green screen. Coordinate with electrical. Interior metal window grill Built-in holding cell bench Provide Binder KBF-S Solid Line Series Humidity Test Chamber (102L, Stainless Steel), evidence refrigerator, existing safes, and stainless steel table. Painted parking stripes Align finish face Mop sink Existing walls to recieve FRTW sheathing on top of existing finish layer Floor drain Turnstile New concrete slab on grade infill. Extents as required in coordination with demolition and repair of underslab plumbing Wall infill to match adjacent wall construction; Align finish faces Warp concrete to achieve drainage around column Decorative exterior railing Apply privacy film to existing window glazing See Structural Sheets for structural reinforcement needed to support mobile shelving above. PLAN NOTES 1 2 3 4 5 6 7 8 9 10 11 12 13 * Reference ID300 Reflected Ceiling Plan Sheets for walls to deck 14 15 16 17 18 19 20 21 22 23 24 25 26 PLAN SPEC KEYNOTES 1. THE GENERAL CONTRACTOR SHALL VERIFY ALL CONDITIONS AT THE JOBSITE. NOTIFY ARCHITECT OF ANY DEVIATIONS FROM THOSE CONDITIONS AS THEY ARE NOTED ON THE DRAWINGS. 2. THE GENERAL CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK WITH THE OWNER. 3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL STATE AND LOCAL BUILDING CODES AND GOVERNMENT REGULATORY AGENCIES. 4. THE GENERAL CONTRACTOR IS TO SUBMIT SHOP DRAWINGS-PROJECT DATA AND SAMPLES TO OWNER/ARCHITECT FOR APPROVAL PRIOR TO FABRICATION OF ALL MILLWORK AND WALL FINISHES. 5. DO NOT SCALE ANY DRAWING. ANY DIMENSIONS ARE TO BE OBTAINED FROM THE ARCHITECT IF NOT NOTED ON THE DRAWINGS. REFER ALL QUESTIONS TO THE ARCHITECT OR ENGINEER ON RECORD. 6. ALL DIMENSIONS ARE TO FACE OF FRAMING U.N.O. 7. THE GENERAL CONTRACTOR SHALL KEEP ONE SET OF PLANS AT THE JOBSITE FOR THE SPECIFIC PURPOSE OF RECORDING ACTUAL CONSTRUCTION CONDITIONS. SUCH PROJECT RECORD-DOCUMENTS SHALL BE PROVIDED TO THE OWNER UPON COMPLETION OF THE PROJECT. 8. THE GENERAL CONTRACTOR SHALL VERIFY SIZE, LOCATION, AND CHARACTERISTICS OF ALL WORKS AND EQUIPMENT SUPPLIED BY THE OWNER OR OTHERS WITH THE MANUFACTURER OR SUPPLIER PRIOR TO THE START OF THE WORK. 9. THE GENERAL CONTRACTOR SHALL SEE THAT ALL SUBCONTRACTORS RECEIVE COMPLETE WORKING DRAWINGS AND ASSUME FULL RESPONSIBILITY FOR COORDINATION OF WORK. 10. SEE ID SHEETS FOR CABINETRY AND CASEWORK INFORMATION. GENERAL NOTES ARCHITECTCLIENT/CMPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS15117 December 17, 2021 Construction Documents A200AENLARGED FIRSTFLOOR PLAN - AREA ACARMEL POLICE STATIONADDITIONSCALE: 1/8" = 1'-0"1 Enlarged Ground Floor Plan - Area A #DESCRIPTION DATE Area A Area B Key Plan