Loading...
HomeMy WebLinkAbout15117_-_A203_-_ENLARGED_MEZZANINE_FLOOR_PLANUP UP A3001 13 14 15 16 17 18 19 M N P Q R S T U G F D C B A H J K L 12 Q7 Q.1 Q.3 Q.5 Q.9 P.2 R.3 18.7 M.1 15.2 15.4 15.6 15.8 T.8 M.3 T.6 A301 1 A300 2 4 A453 4 A454ST-1.4ST-2.4WS3CIWS3CIWS3CIWS3CIWS3CI WS3CI WS3CIWS3CIWS3CIWS3CI Stair ST-2 Stair ST-1 6" metal bollard TV. See Electrical and Technology drawings for power and data requirements. Provide blocking as required. Existing fire panel Mechanical louvers. See MEP drawings for additional information. Motorcycle dual port EV chargers Fingerprint station Security checkpoint Electronic forms 36" x 48" automatic wheelchair lift. See Electrical drawings for power requirements. Limestone panel. See elevations. Recessed green screen. Coordinate with electrical. Interior metal window grill Built-in holding cell bench Provide Binder KBF-S Solid Line Series Humidity Test Chamber (102L, Stainless Steel), evidence refrigerator, existing safes, and stainless steel table. Painted parking stripes Align finish face Mop sink Existing walls to recieve FRTW sheathing on top of existing finish layer Floor drain Turnstile New concrete slab on grade infill. Extents as required in coordination with demolition and repair of underslab plumbing Wall infill to match adjacent wall construction; Align finish faces Warp concrete to achieve drainage around column Decorative exterior railing Apply privacy film to existing window glazing See Structural Sheets for structural reinforcement needed to support mobile shelving above. PLAN NOTES 1 2 3 4 5 6 7 8 9 10 11 12 13 * Reference ID300 Reflected Ceiling Plan Sheets for walls to deck 14 15 16 17 18 19 20 21 22 23 24 25 26 1. THE GENERAL CONTRACTOR SHALL VERIFY ALL CONDITIONS AT THE JOBSITE. NOTIFY ARCHITECT OF ANY DEVIATIONS FROM THOSE CONDITIONS AS THEY ARE NOTED ON THE DRAWINGS. 2. THE GENERAL CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK WITH THE OWNER. 3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL STATE AND LOCAL BUILDING CODES AND GOVERNMENT REGULATORY AGENCIES. 4. THE GENERAL CONTRACTOR IS TO SUBMIT SHOP DRAWINGS-PROJECT DATA AND SAMPLES TO OWNER/ARCHITECT FOR APPROVAL PRIOR TO FABRICATION OF ALL MILLWORK AND WALL FINISHES. 5. DO NOT SCALE ANY DRAWING. ANY DIMENSIONS ARE TO BE OBTAINED FROM THE ARCHITECT IF NOT NOTED ON THE DRAWINGS. REFER ALL QUESTIONS TO THE ARCHITECT OR ENGINEER ON RECORD. 6. ALL DIMENSIONS ARE TO FACE OF FRAMING U.N.O. 7. THE GENERAL CONTRACTOR SHALL KEEP ONE SET OF PLANS AT THE JOBSITE FOR THE SPECIFIC PURPOSE OF RECORDING ACTUAL CONSTRUCTION CONDITIONS. SUCH PROJECT RECORD-DOCUMENTS SHALL BE PROVIDED TO THE OWNER UPON COMPLETION OF THE PROJECT. 8. THE GENERAL CONTRACTOR SHALL VERIFY SIZE, LOCATION, AND CHARACTERISTICS OF ALL WORKS AND EQUIPMENT SUPPLIED BY THE OWNER OR OTHERS WITH THE MANUFACTURER OR SUPPLIER PRIOR TO THE START OF THE WORK. 9. THE GENERAL CONTRACTOR SHALL SEE THAT ALL SUBCONTRACTORS RECEIVE COMPLETE WORKING DRAWINGS AND ASSUME FULL RESPONSIBILITY FOR COORDINATION OF WORK. 10. SEE ID SHEETS FOR CABINETRY AND CASEWORK INFORMATION. GENERAL NOTES PLAN SPEC KEYNOTES ARCHITECTCLIENT/CMPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS15117 December 17, 2021 Construction Documents A203ENLARGED MEZZANINEFLOOR PLANCARMEL POLICE STATIONADDITIONSCALE: 1/8" = 1'-0"1 Enlarged Mechanical Mezzanine Plan #DESCRIPTION DATE Area A Area B Key Plan