HomeMy WebLinkAbout15117_-_A204B_-_ENLARGED_ROOF_PLAN_-_AREA_BA3001
13 14 15 16 17 18 19
M
N
P
Q
R
S
T
U
G
F
D
C
B
A
H
J
K
L
12
Q7
Q.1
Q.3
Q.5
Q.9
P.2
R.3
18.7
M.1
15.2 15.4 15.6 15.8
T.8
M.3
T.6
A301
1
A300
2
10 1/8" / 12"10 1/8" / 12"
1/4" / 12"
1/4" / 12"1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
See
A204A 1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"3
3 3
3
3
4
5
5 5
5
5
5
5
5 5
7
7
7 7 77
6
6
7
7
7
7
7
7
7
7
7 7 77
1. THE GENERAL CONTRACTOR SHALL VERIFY
ALL CONDITIONS AT THE JOBSITE. NOTIFY
ARCHITECT OF ANY DEVIATIONS FROM THOSE
CONDITIONS AS THEY ARE NOTED ON THE
DRAWINGS.
2. THE GENERAL CONTRACTOR SHALL
COORDINATE AND SCHEDULE ALL WORK WITH
THE OWNER.
3. THE GENERAL CONTRACTOR IS
RESPONSIBLE FOR COMPLIANCE WITH ALL
STATE AND LOCAL BUILDING CODES AND
GOVERNMENT REGULATORY AGENCIES.
4. THE GENERAL CONTRACTOR IS TO SUBMIT
SHOP DRAWINGS-PROJECT DATA AND
SAMPLES TO OWNER/ARCHITECT FOR
APPROVAL PRIOR TO FABRICATION OF ALL
MILLWORK AND WALL FINISHES.
5. DO NOT SCALE ANY DRAWING. ANY
DIMENSIONS ARE TO BE OBTAINED FROM THE
ARCHITECT IF NOT NOTED ON THE DRAWINGS.
REFER ALL QUESTIONS TO THE ARCHITECT OR
ENGINEER ON RECORD.
6. ALL DIMENSIONS ARE TO FACE OF FRAMING
U.N.O.
7. THE GENERAL CONTRACTOR SHALL KEEP
ONE SET OF PLANS AT THE JOBSITE FOR THE
SPECIFIC PURPOSE OF RECORDING ACTUAL
CONSTRUCTION CONDITIONS. SUCH PROJECT
RECORD-DOCUMENTS SHALL BE PROVIDED TO
THE OWNER UPON COMPLETION OF THE
PROJECT.
8. THE GENERAL CONTRACTOR SHALL VERIFY
SIZE, LOCATION, AND CHARACTERISTICS OF
ALL WORKS AND EQUIPMENT SUPPLIED BY THE
OWNER OR OTHERS WITH THE MANUFACTURER
OR SUPPLIER PRIOR TO THE START OF THE
WORK.
9. THE GENERAL CONTRACTOR SHALL SEE
THAT ALL SUBCONTRACTORS RECEIVE
COMPLETE WORKING DRAWINGS AND ASSUME
FULL RESPONSIBILITY FOR COORDINATION OF
WORK.
10. SEE ID SHEETS FOR CABINETRY AND
CASEWORK INFORMATION.
GENERAL NOTES
Prefinished aluminum scupper and downspout
Existing roof to remain
Membrane roof with minimum 1/4" / 12" slope
Shingle roof
Roof drain and overflow drain; see plumbing
Roof hatch; see specifications
Tapered insulation to achieve positive
drainage
ROOF NOTES
1
2
3
4
5
6
7 ARCHITECTCLIENT/CMPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS15117
December 17, 2021
Construction Documents
A204BENLARGED ROOF PLAN- AREA BCARMEL POLICE STATIONADDITIONSCALE: 1/8" = 1'-0"1 Enlarged Roof Plan - Area B
#DESCRIPTION DATE
Area A
Area B
Key Plan