Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
15117_-_AD100_-_GROUND_FLOOR_DEMO_PLAN
24119-5.2 24119-7 24119-724119-5.2 24119-5.2 24119-7 Training/ Conference Reception VestibuleTLT Storage Records Records Supervisor Records Supervisor C.P.U. Community Resource Officer Copy Chaplain Storage Technician Exam CL. CL. Evidence Vehicular Sallyport Mech. Elec. 24119-2.1 24119-1.1 24119-2.2 24119-2.2 24119-1.1 24119-5.1 24119-6 24119-2.1 24119-4 24119-1.1 24119-2.1 24119-2.1 24119-1.1 24119-1.2 24119-2.1 24119-1.1 24119-4 24119-1.1 24119-1.1 24119-2.1 24119-2.1 24119-4 24119-5.2 24119-6 24119-1.3 24119-1.2 24119-2.1 24119-1.1 24119-3 24119-2.1 24119-2.1 24119-3 24119-3 24119-9 24119-2.1 24119-1.2 24119-1.1 Elev. 24119-15 CA 24119-5.3 24119-5.1 1. See MEP Sheets for additional selective demolition that will be necessary to facilitate renovation of MEP systems. 2. All ceilings to be demolished unless otherwise noted. See ID300 Sheets for further ceiling demolition information. 3. Dashed lines indicate areas to be removed, solid lines indicate areas to remain. GENERAL NOTES DEMOLITION KEYNOTES ARCHITECTCLIENT/CMPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS15117 December 17, 2021 Construction Documents AD100GROUND FLOOR DEMOPLANCARMEL POLICE STATIONADDITIONSCALE: 1/8" = 1'-0"1 Ground Floor Demo Plan #DESCRIPTION DATE