Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
15117_-_AD101_-_FIRST_FLOOR_DEMO_PLAN
24119-7 Operations MJR. Operations LT. Stair Women Men Lt. MJR. Office Chief's Office Toilet Assistant Chief Conference Chief's Secretary Elec. Coffee Reception Elev. Personnel Storage Mech. Video Prosecutor Office Storage Lt.CID SGT.CID SGT. Conference Investigations Secretarial Lieutenant Roll Call Supervisor Office Storage Women's Locker Room Mech./Elec. Stair Men's Locker Room Weight Room 24119-5.2 24119-7 24119-5.1 24119-6 24119-12 24119-1.1 24119-5.1 24119-1.1 24119-2.1 24119-2.1 24119-2.124119-1.1 24119-1.2 24119-1.1 24119-2.1 24119-1.1 24119-4 24119-6 24119-1.1 24119-2.1 24119-1.1 24119-2.1 24119-6 24119-7 24119-1.1 24119-2.1 24119-5.2 24119-5.2 24119-1.2 24119-10 24119-11 24119-13 24119-5.3 24119-5.3 24119-6 1. See MEP Sheets for additional selective demolition that will be necessary to facilitate renovation of MEP systems. 2. All ceilings to be demolished unless otherwise noted. See ID300 Sheets for further ceiling demolition information. 3. Dashed lines indicate areas to be removed, solid lines indicate areas to remain. GENERAL NOTES DEMOLITION KEYNOTES ARCHITECTCLIENT/CMPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS15117 December 17, 2021 Construction Documents AD101FIRST FLOOR DEMOPLANCARMEL POLICE STATIONADDITIONSCALE: 1/8" = 1'-0"1 First Floor Demo Plan #DESCRIPTION DATE