Loading...
HomeMy WebLinkAboutCorrespondence '1l1li o Evans, Mechwart, Hambleton & Tilton, Inc. Engineers, Surveyors, Planners, Scientists January 9, 2006 Il:~;~:~~~>~' . . /\ /':-" \......> " ' / ',,: ,~'I.;;Y 'if?, ._.. ./ \> \ 1 " . ~/'\ (,'1 (.;,<';~)~./ ..', i ,,'~""" 1'/' \. '.... . ..' :{s .' ....1} ..1.=.=. . ...l 1--.. \ .' I: . . '. , I. .: ..,... /'< , . ~ '" , '\. ". ~'. '-..: ". .., \ \~, .------. :~~c~~;;j./ Ms. Christine Barton-Holmes, Planning Administrator City of Carmel One Civic Square Carmel, Indiana 46032 Arden Townhomes (05120012 DP/ADLS) Response to T AC Review Comments EMH& T Project Number 2005-2281 Dear Ms. Barton-Homes: The following outlines our responses to the TAC comment letters regarding the DP/ADLS review of the above-referenced project. The following identifies our response or action taken to address each comment: City of Carmel DeDartment of Community Services From Ms. Christine Barton-Homes Letter dated December 19, 2005 Comment Item Response 1. The Developer prefers to have a single pedestrian connection to the path on Smokey Row Road as shown on the plan. The walk extending along the west side of the entrance road will be located along the existing gravel drive into the property and will meander through the existing large trees. Residents on the east side of the site can access the walk at two designated ramps/cross walk areas. 2. We will provide a fence along the northern side of the property between the trail and the rear of Building 11. 3. The Developer attempted to address this comment by making Buildings 15 and 16 front-loading, with green space in the middle instead of the alley. However, having front-loaded units on Rosalind Place and Bard Lane results in driveways along these main streets, which would disrupt the sidewalk and pedestrian circulation throughout this area of the site. The front-loaded units also have rear porches which would encroach into the middle green space and reduce its mitigating effect. As a result, the Developer has decided to leave the orientation of Buildings 15 and 16 as shown on the submitted plan in order to maintain the aesthetics and pedestrian-friendly character of the project. Crossroads Enaineerina From Mr. Gregory IIko Letter dated December 15, 2005 Comment Item Response 1. This information will be provided with the final construction plans and drainage report. 2. This information will be provided with the final construction plans and drainage report. 3. This information will be provided with the final con~~fuction plans and drainage report. MCMXXVI 6994 Hillsdale Court, Indianapolis, IN 46250 . Phone 317.913.6930' Fax 317.913.6928 Columbus. Cincinnati. Indianapolis. Charlotte emht.com Ms. Christine Barton-Holmes W City of Carmel Department of Community Services January 9, 2006 Page 2 Q /'/'-__~ _M_..........____....... / "'- " /// '\.'\ \ . \ \- \ \ .;, City of Carmel Enaineerina Department From Mr. Nicholas Redden This information will be provided with the final construction plans8!1d drainage report. - "- /<" '>--:J~// 4. Letter dated December 15, 2005 Comment Item Response 1. thru 12. Acknowledged 13. There will be no placement of fill material in the floodplain other than that required to construct the entrance drive along the eastern portion of the site. The only additional fill material that may be placed in the floodplain would be for the proposed multi-use path along the north side of Smokey Row Road. We are awaiting direction from the Carmel Engineer's Office on the details of this path and whether or not it is to be constructed under this project. . 14. Acknowledged 15. Monuments will be provided as required and will be depicted on the Secondary Plat filed with the construction plans. 16. There are no common areas within the right-of-way. 17. No easements overlap the tree preservation area. 18. On-site streets will be private and have been labeled as requested. 19. We have confirmed that the water main easement is contiguous with the property line of Arden and that access to the City's water main will not be an issue. This information will be depicted on the final plans. 20. Correct. 21. A truck turning radius exhibit was sent to Mr. Gary Hoyt as a part of the TAC submittal which indicates that his largest apparatus can access all areas of the site. 22. The enclosed revised plans show a reduction in the width of the drive as requested. 23. The requested detention volume for Smokey Row Road r/w is provided per the Initial Drainage Report as submitted with the Development Plans. 24. A meeting is scheduled for January 10, 2006 with Gary Duncan to discuss the design of the entrance. 25. Please provide direction on the Department's preferred alignment for the path along Smokey Row Road. 26. The requested information will be shown on the final construction plans. 27. The requested information will be shown on the final construction plans. 28. The requested information will be shown on the final construction plans. 29. The requested information will be shown on the final construction plans. Ms. Christine Barton-Holmes U City of Carmel Department of Community Services January 9, 2006 Page 3 Q 30. '. . ~~, '. _ tS~;:.' As requested, Sheets L 1.0, L 1.1, L 1.2, SE1.0 and the architectur~1 details ha~e;'been / / removed from the set submitted to the Department of Engineering. ", // . "'-.......- ...~______.// r"- 31. The requested information will be shown on the final construction plans. 32. Acknowledged. 33. Detail PA-3D has been revised per your request. 34. Acknowledged. 35. The requested information will be shown on the final construction plans. 36. The requested information will be shown on the final construction plans. City of Carmel Department of Community Services From Mr. Scott Brewer E-mail Dated December 12, 2005 Comment Item Response 1. We have not shown an additional landscape buffer on the east side of the property due to the existing natural buffer of mature trees and heavy vegetation adjacent to the east side of the property. Although this existing vegetation is not located on our property, it is within the easement area that will be dedicated to the City of Carmel for the Cool Creek North Trail High School extension. We are confident that this existing buffer will remain in place, due to the fact that we will be constructing this portion of the trail at the same time as the Arden Townhomes, and our engineer is responsible for the design of this portion of the trail and easement area. Section 26.04.05 of the Carmel Ordinance states that "Existing vegetation may be used to achieve project buffering if: (a) the vegetation located upon the subject parcel is of a quality and state of health to achieve buffering, and, (b) the vegetation is proposed to be preserved using accepted best management practices for tree protection during construction." 2. This change has been made and is reflected in the attached plans. 3. Acknowledged. 4. This change has been made and is reflected in the attached plans. 5. We will take the precautions described in your comments. 6. Given the maintenance practices of today's landscape companies and the quality of the Arden development, these crabapple trees will most likely be heavily sheared and shaped. Our landscape architect has advised us that most landscape trees never reach their full size in a landscape situation, and that the final sizes of these plantings will be suitable for the locations shown on the plan. We would therefore like to leave this species selection as is. Ms. Christine Barton~Holmes W City of Carmel Department of Community Services January 9, 2006 Page 4 Q City of Carmel. Fire Department From Mr. Gary Hoyt, Fire Marshal Letter Dated December 15, 2005 Comment Item 1. Response The structures will not be sprinkled. 2. The structures will not have basements. The height at the peak of the roof is 38 feet. 3. The project will not include an amenity building. 4. The buildings will not be provided with a fire alarm system. 5. Fire hydrant locations are shown the enclosed revised Sheet C2.1. City of Carmel Police Department From Mr. Michael Fogarty, Chief of Police Letter Dated December 7, 2005 Comment Item 1. Response No response required. Clav Township Reaional Waste District From Ms. Jennifer Bruner Letter Dated December 5, 2005 Comment Item Response 1. Not within CTRWD service area. No comments. Panhandle Eastern Pipeline From Ms. Teresa Magee Letter Dated December 8, 2005 Comment Item 1. Response Had no comments. Hamilton County Soil & Water Conservation District From Mr. John South, PE Letter Dated December 16,2005 Comment Item Response 1. Soil types and characteristics are acknowledged. 2. Correct - the only development in the floodplain is the entry road. 3. The Developer will evaluate the possibility of making pond #3 a dry detention basin. However, we believe the pond is needed to provide the required detention for the project. 4. Acknowledged. 5. The design will provide for post construction storm water quality treatment within the proposed detention areas. Ms. Christine Barton-Holmes U City of Carmel Department of Community Services January 9, 2006 Page 5 u 6. The Developer attempted to address this comment by making Buildings 15 and 16 front-loading, with green space in the middle instead of the alley. However, having front-loaded units on Rosalind Place and Bard Lane results in driveways along these main streets, which would disrupt the sidewalk and pedestrian circulation throughout this area of the site. The front-loaded units also have rear porches which would encroach into the middle green space and reduce its mitigating effect. As a result, the Developer decided to leave the orientation of Buildings 15 and 16 as shown on the submitted plan in order to maintain the aesthetics and pedestrian-friendly character of the project. Hamilton County Surveyor's Office From Mr. Greg Hoyes Letter Dated December 9, 2005 Comment Item 1. Response Acknowledged. 2. Acknowledged. 3. Acknowledged. 4. The Developer will consider this request. 5. Storm sewer design will be coordinated with the Hamilton County Surveyor's office and the City of Carmel Engineering Department. There will be no placement of fill material in the floodplain other than that required to construct the entrance drive along the eastern portion of the site. The only additional fill material that may be placed in the floodplain would be for the proposed multi-use path along the north side of Smokey Row Road. We are awaiting direction from the Carmel Engineer's Office on the details of this path and whether or not it is to be constructed under this project. 6. 7. Acknowledged. 8. Acknowledged. 9. Acknowledged. 10. Acknowledged. It is our understanding that the project site falls within the limits of the city of Carmel and does not drain to a County regulated drain. Per Gary Duncan of the Carmel Engineer's Office, the city will have final approval authority for the drainage design. 11. Acknowledged. Ms. Christine Barton-Holmes U City of Carmel Department of Community Services January 9, 2006 Page 6 Q We trust that the responses outlined herein adequately address the written comments of the various reviewing agencies. Should you have any questions regarding this project or the information contained herein, please do not hesitate to contact us. Sincerely, 1lJT'lnc. Rich~ ~ J. K I ,PE Chie~ngin e c: Buckingham Companies Ryland Homes All T AC agencies Q:\Projectl_2005Projects\20052281Idocs\PennittinglD-AOLSIT ACResponse. DOC - orraiHDn Date: Place: Time: 2:lIlI..a.m. 2.:.1JI..a.m. CARMEL TECHNICAL ADVISORY COMMITTEE AGENDA .. "Five Star Court" is NOT an approved street name. Please submit a new list of street names to Bill Akers at Carmel Communications before the subdivision is recorded. Letter has been sent to Snelling Engineering (see attached PDF). lili2ll..a.m. Docket No. 05120017 TAC: Orchard Park Elementary School The applicant seeks to construct 4 additional classrooms. The site is located at 10404 Orchard Park Drive South. The site is zoned S2lResidence. Filed by Karen Collins, PE, of Cripe Engineering for Carmel/Clay Schools. December 21, 2005 Department of Community Services Conference Room 3rd Floor - Carmel City Hall 9:00 AM .. Did not receive plans. Could not comment. Carmel Science & Tech Park, blk 12, lot 5. Velocity Sports Performance The applicant seeks use variance approval for an athletic training facility. Docket No. 05120006 UV W Chapter 200.01 permitted uses The site is located at 1402 Chase Ct. and is zoned M-3/Manufacutring. Filed by Charlie Frankenberger of Nelson & Frankenberger for BP Spons, LLC. No comments c University High School of Indiana The applicant seeks special use amendment approval for a high school expansion. Docket No. 05120007 SUA; ZO Chapter 5.02; Special Uses The site is located at 2825 W 1161h St. and is zoned S-I/Residence. Filed by Bill Wendling of Campbell, Kyle, Proffitt, LLP. No comments 2.:2lL.a.m. Docket No. 05120012 DP/ADLS: Arden Townhomes The applicant seeks approval for a 90-unit townhome development on 12.7 acres. The site is located at 1940 E 136th St. and is zoned PUDlPlanned Unit Development. Filed by Jim Shinaver of Nelson & Frankenberger for Buckingham Properties, Inc. Changes to street names have been made per phone conversation with Rich Kelly, EMH&T. No comments. 2.:li.a.m. Docket No. 05110020 01'/ ADLS: Old Meridian Place The applicant seeks to create 129 town homes and a mix of office and retail uses on 25 acres. The site is located at 12852 Old Meridian Street and is zoned OM/SFA. Filed by Jon Isaacs for Centex Homes. ..No Street names noted on plans. If the town homes and retail arc to be addressed off of the private drives, street names will still need to be approved. Please see to Bill Akers at Carmel Communications to coordinate the street name approval process. Letter has been sent to Ed Fleming at Stoeppelwerth. (see attached PO F) 2.:SS..a.m. lIl:lIS...a.m. c Docket No. 05120015 TAC Schafer Powder Coating The applicant seeks to create a 47,600 sq. ft. office warehouse on 3.45 acres. The site is located at 4518 West 99th Street and is zoned IllIndustrial. Filed by Greg Snelling of Snelling Engineering for Resons Condominiums International, LLC. ..did not receive plans. Could not comment. Docket No. 05120016 SP: Five Star Estates The applicant seeks to plat 5 lots on 5 acres. The site is located at 2200 W. 131st Street and is zoned SllResidential. Filed by Greg Snelling of Snelling Engineering, LLC for Prime Lots, LLC. u D t<<JS -2.:2.1$/01 ) City of Carmel Via emall: iimsuvnf-Iaw.com dleazenby@buckingham-co.com Original by mail December 19, 2005 Jim Shinaver Nelson & Frankenberger 3105 East 98th Street, Suite 170 Indianapolis, IN 46280 RE: Arden Townhomes (05120012 DP/ADLS) Dear Mr. Shinaver: This letter is in response to your secondary plat application for Arden Townhomes. Comments and concerns are as follow: 1. A connection is not provided for the townhomes on the east side of the project to the proposed walkway on Smokey Row Road. Please add a connecting walkway. 2. There is no buffering or tree preservation shown on the north end of the project. Please indicate if a fence or other buffering will be provided. 3. Twelve of the townhomes are shown to be surrounded by private streets and alleys. Staff would prefer to see some mitigating green space for these units. This may be accomplished by making the units front-loading, and providing green space in the middle, rather than an alley. Please wait to submit revised materials until after the Technical Advisory Committee (T AC) has met on this application. The resubmitted materials should include edits addressing the above comments along with any requirements that arise from the T AC meeting. Additional comments may be made after the requested revisions have been submitted. Sincerely, Christine Barton-Holmes Planning Administrator OS llOO09SP Grandin Hall Section 2 Page 1 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 u u Page 1 of 1 DeVore, Laura B From: Griffin, Matt L Sent: Monday, December 19, 200510:17 AM To: DeVore, Laura B Subject: FW: Arden Townhomes Pud Print and file with Arden DP (tac cart) From: Brewer, Scott I Sent: Monday, December 12, 2005 1:24 AM To: 'Kelly, Rich'; JimS@nf-law.com; 'ellndscp@aol.com' Cc: Conn, Angelina V; Griffin, Matt L Subject: Arden Townhomes Pud Dear Rich: These are my TAC comments for Arden Townhomes PUD landscape and tree preservation plans: 1. It appears there is no landscape buffer on the east side of the property, the existing woods that are to be preserved on the east side and the path to be installed is actually on Carmel High School's property. This does not meet the required buffer yard ordinance (Section 26.04). 2. I do not recommend using Washington hawthorns near paths, sidewalks and roadways. Please choose an alternative species such as tri-color beech, yellowwood, American smoke tree or hornbeam. 3. There are 44 Imperial honey locust trees in the allee along Arden Place. Normally, those numbers are not allowed for species diversity reasons. I will allow this for design purposes, but the maintenance will increase because those numbers of the same trees will attract pest species. 4. There are 33 maples trees on the plan. Please choose an alternative for either the Pacific Sunset maples or the 'Green Mountain' variety such as Kentucky coffee tree, London plane tree, Ginkgo, or sugarberry tree. 5. On the outside of the private alleyways and near the buildings built near preserved trees, the roots should be cut with a sharp blade such as a trencher before the tree preservation fence is installed. This will allow the roots of existing trees to regenerate. If the roots are disturbed, compacted, or mangled by earthmoving equipment, they will be injured and probably die back to the trunk, resulting in the possibility of die back and wind throw. 6. Crabapple species (Malus) 'Coral bust', 'Camelot', and 'David' are 10', 8', and 15' wide respectively. These short wide growing trees seem to be the wrong shape for long term maintenance between driveways and in narrow areas adjacent to sidewalks. Please choose an alternative taller narrow growing species, such as single stem river birch, 'Ivory Silk' tree lilacs, tri-color beech, hornbeam or hop hornbeam. Please reply to these comments in writing and by amended plans. Please contact me if there are any questions. Scott Brewer, City Forester Environmental Planner, DOCS City of Carmel, One Civic Square Carmel, IN 46032 PH: 317-571-2478 FAX: 317-571-2426 12/21/2005 Q o EL JAMES BRAINARD, MAYOR December 19, 2005 Mr. Rich Kelly, P.E. EMH & T, Inc. 6994 Hillsdale Court Indianapolis, IN 46250 RE: Arden Townhomes development plan/primary plat- Project Review #2 Dear Mr. Kelly: We have reviewed your submission for the December 21, 2005 Technical Advisory Conunittee meeting. We offer the following comments: GENERAL INFORMATION '" , , 1. The project site is lo~ated Within current City of ClII1TIe1 <::qiporate Limits. 2," ~~~~1~~~~2~,~f3~~~~t:~~~~"""'\"~' 3. BoardofPublicWorks:andSllfety.ApproviURequireme~ts::,~,,, "yq;:,;" , " , . WafcirllndSanitarySewer Availabi1itY.,~ ',>' ". :.: " ., :.:' , e Commercial Curb Cut. This Will he required for the entrance to the development on SmOkey Row/136th Street. ' The request for Board approval should include 8 W' x II" exhibits that Will 'i indicate the proposed curb cuts and all appropriate data and dimensions includitJg width, radii, etc. 'Please indicate all existing and opposing driveways and their relationship to the 'proposed curb cuts for this development "',.m,..e-Temporary Construction Entrance. Separate BPWS approval will be required if this entrance is to be lo'cated anywhere other thail the site of thepeIlIUl!lent~urb cut. " " .' ConseJit to Encr6ach approvals 'fotany 'permanent unproveinent to be insbllled ivithin dediCated easements and/or dedicated right of way. If an irriglltion system is planned' for ~s proJect, additional Water Availability approval will be required from the Board and additional Water Connection Fees will be due. e Dedication of Right "fWay (if applicable). Preferred dedication forms are available electronically from this office. · Secondary Plat approval, if applicable. , e Open pavement cuts for utility installations or pavement cuts to facilitate entrance and curbing installation. .. '," _ . , ' 'I am eriClosing a schedule. for Boar4 of Public Works and Safety meeting dates and agenda deadlines }forYoutuse.i;:Pl~a.se:use tl].lt:E~ginc;ermg:PfB~t:l.}.t4.~~4,lines for submissions to the Board. ':Any)ubmi$siojt.to~/te'B~~r.drequires prior final approval by the Carmel Clay Plan Comm~sion r;andt{fr-'~ht 'JJ~ard oJ~(?1tinc.. ~pp~o# and completion of review by the Technical Advisory ~'i:o",ndttee. \"411.w'-!~en!.1!equests to 'be place on the Board's agenda must inclllde the appropriate J)ocketNumbersoandthe,date(or; dates).o[.approvfll. by, the Plan Commission and/or BZA. -4. ]TAC Revie~lI5ra~~gs s~bmihed 'for app~ovaJ.~;" ;',,!, ,,',';', ';j:~'I' 1: C'; ",;;';;;) 'We requ~stthat all comments and comment letters generated by this o~ce be,answered in writing and beaCCOnipanied by a drawing reflecting requested revisions. Final drawings will not be approved for construction until all issues have been resolved. All Carmel Utility issues must also re resolved. The DEPARTMENT OF ENGINEERING ONE CMC SQUARE, CARMEl, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 EMAIL engineering@ci.carmel.in.us .... . .; ~ o Q design engineer must certify all drawings submitted for final approval. This office will require a minimum of five-sets (maximum of seven-sets) of approved drawings after all issues have been resolved The drawings will be stamped approved and signed by both the City Engineer and Director Carmel Utilities. The Developer/Owner will receive one-set which is to be maintained on the construction site at all times. Carmel Utilities will receive two-sets. Our Construction Manager will receive one-set and one-set will be maintained in the Department of Engineering. Ifmore than the minimum of five-sets are requested to be approved, the additional sets (maximum total of two additional) must be submitted with the five required sets. 5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated easements and/or right of way will require Consent to Encroach approval. 6. Carmel Utilities does not subscnbe to "Holey Moley" and should be contacted directly for all water and sanitary sewer main locations. 7. Carmel Utilities will provide a separate review of this project for water and sanitary sewer issues. 8. I am including copies of the following with this correspondence: . Commercial/Subdivision Project Approval Procedures. . Performance Release Procedure . Permit Data, Contacts, etc. . Commercial Permitting Procedures. . Dedication of Right of Way Documents . Utility Fees BONDING REOUlREMENTS 9. Upon initial review, it appears the following bonding requirements may apply to this project: Performance GuaranteeslEngineer's Estimates I. Interior Streets (if dedicated) 2. Interior Cwb & Gutters (if dedicated) 3. Right of Way Improvements (pavement, curbs, accel/decel/passing blister, sidewalks/paths) 4. Water Mains 5. Sanitary Sewers 6. Storm Sewers (if dedicated) 7. Monuments (if platted) & Markers (if dedicated streets) 8. Interior Sidewalks (if streets are dedicated) 9. Street Signs (if streets are dedicated) Please provide a Certified Engineer's Estimate for 100% of the cost oflabor and materials for these improvements. Please post Performance Guarantees, in the amount of the Engineer's Estimates, for each improvement required. Upon completion and release of the Performance Guarantees, 3-year Maintenance Guarantees will be required. Street CutlRight of Way Permit and Bonding Requirements Any work in the dedicated right of way ofSmokey Row Road/136th Street will require a Right of Way Permit. If the work in the right of way is not included in a Performance Bond, a separate License and Permit Bond will be required. the bond amount will be detennined by the number of instances of w:ork in the right of way @ $2,000.00 per instance. Open pavement cuts in dedicated streets require approval by our Board of Public Works and Safety. Please contact our Right of Way Manager, Fred Glaser, to arrange permitting and bonding. 10. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted to this office for review. We will share Crossroad's comments as they are received. When construction plans are submitted for review for this development, please provide I-set of plans and calculations to this office and I-set of plans and drainage calculations to: Mr. Greg Ilko, PE Crossroad Engineers, PC 3417 South Sherman Drive Beech Grove, IN 46107 u Q AVAILABILITY AND CONNECTION FEES 11. Availability (acreage) Fees must be paid after all other Engineering Department requirements have been satisfied and prior to the start of construction activities. Availability Fees are based upon total platted acreage or upon the total acreage as stated on a legal description of the property. Current Availability (acreage) Fees are $l,01O.00/acre for water and $I,365.00/acre for sanitary sewers. Connection Fees - In order to calculate Connection Fees for this development, detailed usage information is required. It appears that this is a townhome or condominium project. Please provide this office with a detailed listing of buildings, units per building and bedrooms per unit. Current Connection Fees are $1,310.00 per BOU for water and $795.00 per EDU for sanitary sewer. I am enclosing Average User Factor Sheets for water and for sanitary sewers. PROJECT COMMENTS-DEVELOPMENT PLANIPRIMARY PLAT 12. Detention will be required for this development. 13. Is there proposed filling of the floodplain of Cool Creek? The Department will expect the development to conform to the recommendations of the Cool Creek Watershed Study which is available on-line from the City's website. 14. Please contact Crossroad Engineers to obtain a drainage review checklist The Department will expect the drainage system designed for this project to conform to the items outlined in the checklist 15. Please provide monuments at external comers. These monuments should be shown on the plat 16. Please ensure that there are no common areas within the right-of-way. 17. Please ensure that other easements do not overlap with tree preservation easements. 18. Please label private streets. The Department assumes that the on-site streets will be private. 19. Any off-site easements must be secured prior to the Department of Engineering approving the drawings. As we discussed, please resolve the issue related to the old railroad right-of-way and the water service connection. 20. The Department assumes that all internal areas will be blanket IngresslEgress, Drainage and Utility Easements. 21. Please confirm with the Fire Department that internal turning radii are adequate for their fire trucks. 22. Please reduce the drive opening width of the entrance on the west side of the median from 23 feet to a maximum of 18 feet 23. Please provide detention volume for the fully developed thoroughfare plan right-of-way for the Smokey Row Road frontage. This requirement shall apply regardless. of watershed limits. Please provide adequately sized pipes to carry water from the street to the proposed ponds. 24. Please provide an acceleration lane and deceleration lane per the configuration on the attached sketch. Please provide a lane shift taper for the westbound through lane in accordance with the Indiana MUTeD. Thank you for adding the entrance configuration requested by the Department of Engineering and the Plan Commission. However, the Department of Engineering needs additional information to confirm that the lane shifts and tapers satisfy the MUTCD. Please schedule a meeting. 25. Thank you for indicating a 10-foot asphalt multi-use path along SmokeyRow Road. As we have discussed, we will provide direction as to the final alignment of this path within the right-of-way. 26. Thank you for adding the note for the water and sanitary maw and laterals. Please incorporate the Department's cover and backfill standard for all storm sewers that will be maintained by the City or located within the right-of-way. 27. Any street cuts must be delineated on the plans for sawcut, removal, and replacement Please include with the details, the Carmel standard street cut patch detail. 28. For the Construction Drawings, please confirm that the E:MH&T details for curb, sidewalk and pavement meet of exceed the City Standard Details. If they do not, please include the City Standard Details in the Construction Drawings and delineate as such on the Development Plan. Q Q 29. Please provide a Maintenance of Traffic Plan with the Construction Drawings. 30. Please remove Sheet Ll.O (Landscape Plan), Sheets Ll.l and L1.2 (Landscape Details), Sheet SE1.0 (photometric Plan), and the last two sheets (the architectural details) from the construction plans submitted for approval to the Department of Engineering. 31. The City has adopted a new paving policy. Please revise any notes, specifications, and details to accommodate this policy. Please add the policy language to the specifications sheet. 32. Thank you for indicating the construction of the segment of the Cool Creek North Trail High School extension. 33. Please revise Detail P A-3D to include the two-foot stone, 6 inches deep #53 shoulders on each side of the trail for the trail to be constructed on the school property. 34. As we have discussed, Buckingham should resolve the deed overlap with the school property. 35. Construction plans shall indicate removal and replacement of the existing school fence to accommodate the installation of the trail. 36. The City recommends that all private streets be constructed to City standards to facilitate future dedication. These standards include: a Sub-surface drain under the curbing on each side of the roadway meeting the Department's standard detail. a The plan should accommodate a future 50-foot right-of-way to include the street and any sidewalks and the pavement width should be a minimum of 30 feet. a The pavement face curb-to- face curb width should be 40-feet for parking 011 both sides or 32-feet for parking on one side only. a Please continue curb and gutter to the limits of the on-street parking spaces at intersections. a Locate any sanitary or storm manholes ( except inlets) and valve boxes outside of street pavement, sidewalks or curbing and add a note to this effect. a The sidewalk and curbing are installed to the Department's standard details. a The pavement is installed with a normal crown with inlets on each side. a Storm piping, Sanitary Sewer and Water Mains within what could be future right-of-way conform with the City's cover and backfill standards. These comments represent the Department of Engineering's initial review of the development plan/primary plat of this project. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in the delay of the review process. It is critical that our office be made aware of all modifications made on any plans being re-submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans. Also, Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. The Department reserves the right to provide additional comments based on subsequent reviews and on the grading and drainage system upon receipt of drainage calculations and more detailed construction drawings that provide grading elevations, pipe sizing and invert elevations. The comments based on a more detailed review of the drainage system may require changes to the Primary Plat If you have questions, please call me at 571-2441. u Sincerely, ~~.~ Plan Review Coordinator Department of Engineering Enclosures cc: Matt Griffin, Department of Community Services (w.o. encl.) John Duffy, Carmel Utilities (w.o. encl.) Paul Pace, Carmel Utilities (w.o. encl.) Paul Arnone, Carmel Utilities (w.o. encl.) Greg Ilko, Crossroads Engineers Project File Engineering Department Review llApps2111ser dllllJlenglslutredlDHiIlIPROJREY05lARDENREV#2.doc (.;) Q o ").005 I 't1.11 (.l 1) Construction/Stormwater Pollution Prevention Plan Technical Review and Comment (Form 1) Project Name: Arden Townhomes Primary Plat Plan Submittal Date: 12/01/05 Hydrologic Unit Code: Project Location Description: North side of 136th on the east side of Cool Creek Latitude and Longitude: = C.!.~. Town~~-,-.: C!ay.. . ..__.._9~arter:. ..__. __, ~!~~on:, _.}9 Towns~p: 18N ~n~~~;".." o. 4E . ~ Project Owner Name: Buckingham Companies, AMO e Contact: David Leazenby C> 'a Address: 333 N. Pennsylvania Street 10th Floor 1; City: Indianapolis State: IN .20 Phone: 317-974-1234 FAX: 317-974-1238 E-Mail: ~~=~::;=:;';;=~KH1'f~~::~:~%j~llli~illWl1k"if~l!i~illU~~if.~~~m8i(~~g;lllil\:5r!!;jj;];~brofr~\t.~lV~;\,)jjljJ:~;~'~~fllliJ~0~;~];1:?\jj!,~~].m:illffiE.~~~ill!~@ Affiliation: EMH&T Address: 7400 ShadeIand Ave. Suite 150 City: Indianapolis Phone: 317-913-6930 County: Hamilton Zip: 46204 FAX: State: IN 317-913-6928 Zip: 46250 E-Mail: Review Date: 12/16/05 ~ Principal Plan Reviewer: John B. South P.E. CPESC ~ Agency: Hamilton County Soil and Water Conservation District ~ ~ Address: 1108 South 9th Street = City: Noblesville a:: Phone: 317-773-2181 Assisted By: FAX: State: IN 317-776-1101 Zip: 46060 E-Mall: john-south@iaswcd.org PLAN IS ADEQUATE: A comprehensive plan review has been completed and it has been determined that the plan satisfies the minimum requirements and intent of 327 lAC 15-5. o Please refer to additional information included on the following page(s). o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of the NOL A copy of the NOI must also be sent to the Reviewing Authority (e.g. SWCD, DNR). :~~~~~B~~1lL~~~f[h~~~_rrV~.~rwi~j~~ll~j~Q1~[illilifllijml*_!filii_~~~11llit!&~~~L~~t~~~{\~~lg~~;.n_~JE~~t1!~i~1~~Yt51~~~till~Jl~ili;gm!t~!11'~~ftlli~UE~~1N~[f=fiIT~:~~1[lli~~~~~~~1~1~~i~tIT;;~J;-ir~~iJj~go o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and revisions to the plan may be required at that time to address deficiencies. o Please refer to additional information included on the following page(s). o Submit Notice of Intent (NOn: Attach a copy of this cover page when submitting the NOI to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of the NOL A also be sent to the o PLAN IS DEFICIENT: Significant deficiencies were identified during the plan review. o Please refer to additional information included on the foUowing page(s). o DO NOT me a Notice of Intent for this project o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re- submitted, and notification has been received that the miDimum requirements have been satisfied. Plan Revisions Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified in the Plan Review Section above. DNR, Division of Soil Conservation Page 1 oft Revised J 2/09/03, Form J u o ConstrumonlStormwater Pollution Prevention Plan - Technical Review and Comment (Form 1) Project Name: Arden Townhomes Primary Plat Date Reviewed: 12/16/05 The technical review and comments are intended to evaluate the completeness of the Construction/Stormwater Pollution Prevention Plan for the project. The Plan submitted was not reviewed for the adequacy of the engineering design. All measures included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility by a qualified individual with structural measures designed by a qualified engineer. The Plan has not been reviewed -Or other local, state, or federal permits that may be required to proceed with this project. Additional information, including design calculations may be requested to fUrther evaluate the Plan. .4.11 proposed stormwater pollution prevention measures and those referenced in this review must meet the design criteria and standards setforth in the "Indiana Stormwater Quality Manual" from the Indiana Department of Natural [Resources, Division of Soil Conservation or similar Guidance Documents. Please direct questions and/or comments regarding this plan review to: JohnB. South P.E. CPESC Please refer to the address and contact information identified in the Plan Review Section on page 1. Assessment of Construction Plan Elements (Section A) The Construction Plan Elements are adequately represented to complete a plan review: o Yes 0 No The items checked below are deficient and require submittal to meet the requirements of the rule. A A Index showing locations of required Plan Elements 1 II by 17 inch plat showing building lot numbers/boundaries and road layout/names o 4 Vicinity map showing project location o 6 Location of all lots and proposed site improvements (roads, utilities, structures, etc.) O 8 Notation of any State or Federal water quality permits o 9 Specific points where storm water discharge will leave 0 10 Location and name of all wetlands, Iakes and the site water comses on and adjacent to the site o 11 Identification of potential discharges to ground water (abandoned wens. sinkholes. etc.) o 13 100 year f1oodpIains, f1oodways, and f100dway fringes 0 14 Pre-construction and post construction estimate of Peak Discharge (10 Year storm event) o 16 Locations and. approximate boundaries ofall disturbed areas (Construction Limits) O 18 Soils map including soil descriptions and limitations o 19 Locations, size and dimensions of proposed storm water 0 Plans for any off-site construction activities systems (e.g. pipes, swales and channels) 20 associated with this project (sewer/water tie-ins) o 11 Locations of proposed soil stockpiles and/or 0 22 Existing site topography at an interval appropriate borrow/disposal areas to indicate drainage patterns Proposed final topography at an interval appropriate to 23 . di draina m cate ge patterns Narrative descn'bing the nature and pUlpose of the project Legal Description of the Project Site (Include Latitude and Longitude - NO! Requirement) 7 Hydrologic unit code (14 Digit) o 11 Identification of all receiving waters o 15 Adjacent Ianduse, including upstream watershed o 17 Identification of existing vegetative cover DNR, Division of Soil Conservation Page 1 oft Revised 12/09/03, Form 1 v o ConstructionlStormwater Pollution Prevention Plan - Technical Review and Comment (Form 1) Project Name: Arden Townhomes Primary Plat Date Reviewed: 12116/05 Assessment of Stormwater Pollution Prevention Plan (Sections B & C) The construction component of the Stormwater Pollution Prevention Plan includes stormwater quality measures to address erosion, sedimentation, and other pollutants associated with land disturbance and construction activities. Proper implementation of the plan and inspections of the construction site are necessary to minimize the discharge of pollutants. The Project Site Owner should be aware that unforeseen construction activities and weather conditions may affect the performance of a practice or the effectiveness of the plan. The plan must be a flexible document, with provisions to modify or substitute B ractices as necessary. Description of potential pollutant sources associated with construction activities Sequence descn"bing stormwater quality measure implementation relative to land disturbing activities Stable construction entrance locations and specifications (at all points of ingress and egress) Sediment control measures for sheet fiow areas Sediment control measures for concentrated fiow areas Storm sewer inlet protection measure locations and specifications Runoff control measures (e.g. diversions, rock check dams, slope drains, etc.) Storm water outlet protection specifications Grade stabilization structure locations and specifications 10 Location, dimensions, specifications, and construction details of each stormwater quaUty measure 11 Temporary surface stabilization methods appropriate for each season (include sequencing) 11 Permanent surface stabllization specifications (include sequencing) 13 Material handUng and spill prevention plan 14 Monitoring and maintenance guidelines for each proposed stormwater quaUty measure D D 15 Erosion & sediment control specifications for individual building lots The post construction component of the Stormwater Pollution Prevention Plan includes the implementation of stormwater quality measures to address pollutants that will be associated with the nallanduse. Post construction stormwater quality measures should be functional upon completion of the project. Long term fUnctionality of the measures are critical to their performance and should be C monitored and maintained. Description of pollutants and their sources associated with the proposed land use Sequence describing stormwater quality measure implementation Description of proposed post construction stormwater quality measures (Include a written description of how these measures will reduce discharge of expected pollutants) Location, dimensions, specifications, and construction details of each stormwater quality measure Description of maintenance guideUnes for post construction stormwater quality measures DNR, Division of Soil Conservation Page 1 of1 Revised J 2/09/03, Fonn J u o ConstructionlStonnwater Pollution Prevention Plan - Technical Review and Comment iProject Name: Arden Townhomes Primary Plat Date Reviewed: 12/16/05 The following are natural resource comments or concerns in regard to this project: The Oakley and Fox terrace soils are well drained with sand and gravel 3'-4' below the surface. Stonnwater basins should be constructed as dry ponds to prevent future failures of installed liners and large costs to the homeowners to fix a problem. Exposed sands and gravels will need to be covered with adequate soil for good plant growth. The Sleeth loam has seasonal high water table, high potential frost action, moderate permeability in the subsoil and rapid permeability in the substratum. The Genesee and Shoals soils are flood plain soils and will remain largely undisturbed except for pond #3. This pond will require a liner or the water level will fluctuate with the water table. The development plan appropriately keeps most of the improvements out of the flood plain. Pond #3 is not recommended. The pond will need to be lined to maintain a static permanent pool level. Liners can fail and impose a significant financial burden on the homeowners. When flooding occurs the pond will also collect debris and sediment from the flood waters. This will significantly shorten its useful life span and incur higher costs for maintenance. I don't believe the future homeowners should be burdened with these future obligations that substantially exceed those of similar developments. A 30 feet wide riparian easement is recommended along Cool Creek. The project will need to consider the new ordinances for post construction water quality. Hard surface could be minimi7.ed by having only one street providing access to the townhomes. Many of these homes have streets on the front and the back. cc: Carmel, Surveyor, File DNR. Division of Soil Conservation Page 1 ofl Revised 12/09/03 u u December 15, 2005 Mr. Richard Kelly EMH&T, Inc. 6994 Hillsdale Court Indianapolis; IN' 46250 Re: Arden Townhomes Technical Advisory Committee En2ineerin2 Review Checklist for Development Draina2e Desips Dear Mr. Kelly: Insufficient information has been submitted to perform a complete drainage review. Included herein is the "Engineering Review Checklist for Development Drainage Designs" that details the City of Carmel's drainage requirements. Please use this in generating yourdrainage submittal. Pfease revise the plans in accordance with the comments below. . 1. Please review the "Pipe Sizing Calculations" section of this checklist. Please provide the information as a part of the drainage calculations as necessary for this project in accordance with these requirements. 2. Please review the "Construction Plan" and "Storm Profiles" sections of this checklist. Please include the required information in the construction plans for this project in accordance with these . . requirements: ..~.: .... . .... . ..3. Please provide structure numbers and structure data notes for the drainage structures in the plans. ;;. "4;: : The contour elevations for all ponds are not marked on the construction plans. Please show the (+;'<;;"contoUre'&va,tions, and provide spot elevations and typical cross-sections for each pond to show adequate freeboard for each pond. The minimum freeboard shall be two feet above the 1 OO-year critical flood elevation. Please iDclude witbY01ir.submittal, one (1) copy of the comments indicating the action taken or a written explanation for action not taken. Construction plans and drainage calculations are not to be re-submitted without implementing changes with respect to any and all review comments from the City of Carmehand the /' Hamilton County Surveyor's Office. The comments and plans may be submitted to my atteJition.at".the~:. . following address: ,I // ' /;. .' CrossRoad Engineers, P.C. I ( ". .:-(Y.::. . "417 S th S' on I I \~'S.;. _/...- . :J.' au . nerman ve. t."...., <,' Beech Qrove;IN46107 \, ",,"' ~ " *.tJ'J.. ) . "J ::::~t me at (317) 780-1555 ext. 12 wilh any quemo... \,':::..~ : ".;. ';r,;;-: '. '.r" f".-'.: il:....' ", ~-. " . ;.' ~ ;-' . . )':,-, ~"_l:';:. '..~: !_ ", ~,; . . 1....'...._ . .... - : ::. ~ -"'0-- ',"._.'.', :.... . . " - .~ : .... . :'.~ . ..... ~ : . ~ -.. .. ..... .-".' .;:: . ", '; ~:..:.:,', ~;".i'~ '.-~:,,:';;';';' '. . ..:/ :l~_;:: ....., , ,.~ " '. :'..... .' - '-f .. . '.. . '. ,~.." .. t, ...' ; .... copy: GaryDuric8il, City of Carmel Assistant Engineer Greg Hoyes, Hamilton County Surveyors Office -~-= 3417 Soul:h Sherman Dr. . Beech&ro"e, IN4&1D7 . Te.1 317-7BOU555 . Fax 317-7BO-&5i!5 "~=~==~ Dee 15 2005 2:11PM ~LASERJET 3200 u p.2 '~,. . . . City of Carmel Fire Department Headquarters 2 CIVIC SQUARE CARMEL, INDIANA 46032 Voice (317) 571-2600 Fax (317) 571-2615 Fire Prevention Bureau Richard J. Kelly, PE EMH&T 6994 Hillsdale Court indianapolis, IN 46250 RE: Arden PUD LETTER OF APPROVAL The undersigned has reviewed the proposed plans for Arden PUD and has approved the plans subject to the following: 1. WiD the structures be sprlnklered? If so a meeting will need to be scheduled to discuss the locaUon(s) of 1he fire department connect/on(s) and an additional fire hydrant We will also request an exterior entrance to the fire sprinkler riser room (s). We also will request 1he purchase of Knox Foe caps for the sprinkler siamese(s). 2. What are the heights of the buildings and WIll the buildings have a basement? 3. Will this project include an amenity building? If so our office Is requesting the inslaDatlon of a Knox box for emergency access. Knox products can be purchased on line at www.knoxbox.com 4. Will the buildings be provided with a fire alarm system? 5. Our. office is also requesting a set of water distribution plans showing fire hydrant locations. 6. Please respond to the above noted condiUon(s) In writing and submit to our office prior to the scheduled Technical Advisory Meeting for this project Date: December 15. 2005 By: Gary Hoyt, Fire Marshal Carmel Fire Deparbnent 01. u NELSON & FRANKENBERGER A PROFESSIONAL CORPORATION ATTORNEYS AT LAW JAMES J. NELSON CHARLESD.FRANKENBERGER JAMES E. SHINA VER LARRY J. KEMPER JOHN B. FLATT FREDERIC LAWRENCE OF COUNSEL JANE B. MERRILL 3105 EAST 98TH STREET SUITE 170 INDIANAPOLIS, INDIANA 46280 317-844-0106 FAX: 317-846-8782 December 12, 2005 Matt Griffin City of Carmel Department of Community Services mgriffin@carmel.in.gov RE: Arden Townhomes - ADLS/DP Approval TAC Meeting Scheduled for 12/21/05 Dear Matt: Attached to this e-mail message, you will find copies of the T AC transmittal letters sent by Rick Kelly of EMH & T Engineering to the various T AC agencies. Please be sure that his matter is placed on the T AC agenda for its December 21 st meeting. Please also send me a copy of the agenda when it is prepared. Thank you for your assistance in this regard. Please contact me with any questions. Very truly yours, NELSON & FRANKENBERGER, P.e. James E. Shinaver JES/bd Enclosure CC: David Leazenby, dleazenby@buckingham-co.com w/o encl. Sara Nasuti, sara@buckingham-co.com w/o encl. Rich Kelly, rkelly@emht.com w/o encl. H:\brad\buckingham\arden\griffin Itr 111705.doc u t.cu-Qu 1(./1) Page 1 of2 Rigney, Lynn From: Kelly, Rich Sent: Monday, December 12, 2005 8:13 AM To: Rigney, Lynn; 'David Leazenby' Cc: 'Sara Nasuti' Subject: FW: Arden Townhomes Pud All, Below are Scott Brewers comments for Arden. Lynn - please file with other T AC letters as received. Rich From: Brewer, Scott I [mailto:SBrewer@carmel.in.gov] Sent: Monday, December 12, 2005 1:24 AM To: Kelly, Rich; JimS@nf-law.comi e1lndscp@aol.com Cc: Conn, Angelina Vi Griffin, Matt L SUbject: Arden Townhomes Pud Dear Rich: These are my TAC comments for Arden Townhomes PUD landscape and tree preservation plans: 1. It appears there is no landscape buffer on the east side of the property, the existing woods that are to be preserved on the east side and the path to be installed is actually on Carmel High School's property. This does not meet the required buffer yard ordinance (Section 26.04). 2. I do not recommend using Washington hawthorns near paths, sidewalks and roadways. Please choose an alternative species such as tri-color beech, yellowwood, American smoke tree or hornbeam. 3. There are 44 Imperial honey locust trees in the allee along Arden Place. Normally, those numbers are not allowed for species diversity reasons. I will allow this for design purposes, but the maintenance will increase because those numbers of the same trees will attract pest species. 4. There are 33 maples trees on the plan. Please choose an alternative for either the Pacific Sunset maples or the 'Green Mountain' variety such as Kentucky coffee tree, London plane tree, Ginkgo, or sugarberry tree. 5. On the outside of the private alleyways and near the buildings built near preserved trees, the roots should be cut with a sharp blade such as a trencher before the tree preservation fence is installed. This will allow the roots of existing trees to regenerate. If the roots are disturbed, compacted, or mangled by earthmoving equipment, they will be injured and probably die back to the trunk, resulting in the possibility of die back and wind throw. 6. Crabapple species (Malus) 'Coralbust', 'Camelot', and 'David' are 10', 8', and 15' wide respectively. These short wide growing trees seem to be the wrong shape for long term maintenance between driveways and in narrow areas adjacent to sidewalks. Please choose an alternative taller narrow growing species, such as single stem river birch, 'Ivory Silk' tree lilacs, tri-color beech, hornbeam or hop hornbeam. Please reply to these comments in writing and by amended plans. Please contact me if there are any questions. Scott Brewer, City Forester Environmental Planner, DOCS 12/12/2005 City of Carmel, One Civic Square Carmel, IN 46032 PH: 317-571~2478 FAX: 317-571-2426 12/12/2005 u u Page 2 of2 /- ~ 12/09/2005 10:18 317776\..1 HAMILTON CO VR ).OO$.'2.~11 Lli) PAGE 02/03 J(enton C. 'Word, Slfnlt}'oT t'E'fitmr (J17.) 77';"'~4~S 'Tn,r (JI7) ii~G).$ S"/Ie h($ Om: .1Iomlllnn eel/III'" Sqllon: .:Nobksllille. Illf{innll 4606o..1.1~~O December 9, 2005 EMIl & T Inc. ATTN: Rioh Kelly 6994 Hi11sda1e Court Indianapolis, IN 46250 VIA FACSIMILE: 913-6928 Re: ArdeD Townhomes Dear Mr. Kelly: We have reviewed the primary plat submitted to the Hamilton County Svrveyor's Office on December 1, 2005 for this project and have the following comments: 1. The proposed project falls in the inCOIpOIated limits of the City ofCBID1el 2. The proposed project DOES fall in a Carmel Wellhead Proteetion Zone. 3. This proposed project does not fall in a regulated drain watershed. 4. Do to up-stream drainage problems on Little Cool Creek and Cool Creek being a regulated drain upstream, the Hamllton County Surveyor's Office would ask that a petition to make Cool Creek a regulated drain across this project be executed. This would allow us to maintain the drain and keep the tlow moving though the creek. We will grant reduction of the statutory regulated dmin easement and support encroachments that are part of this proposed project. 5. Please coordinate the storm system design with both the Hamilton County Surveyor's Office and the City of Carmel Engineering Department. 6. The Cool Creek Watershed Management PlBDt that was ajoint study done by HCSO, City of Camtel, and the Town of Westfield, recommends against ANY 12/89/2885 18:18 317776~ HAMILTON CO VR PAGE 83/1213 Joss of floodplain for Cool Creek. Will any floodplain volume be lost to this development? If so, compensatory storage wUI be strongly recommended. 7. The Watershed Management Plan also recommends that any debris or flowline abstraction need to be removed. HCSO would recommend that a general stream cleanup be considered with this project. This cleanup should involve debris, flowline obstructions, and any possible obstmction in the floodplain (dead/dying trees and any deadfall on the ground). 8. The HCSa would also recommend that any major erosion area be looked at and repaired. The management plan shows areas ofminor and major erosion just downstream oftbis site and this area should be looked at also. 9. A copy of the approved IDNR Construetion in a Floodway Pennit should be submitted to HCSO, O~ received. 10. Although the HamUton County Surveyor's Office has reviewed this primary plat and issued a comment letter. this office will not be limited by the primary plat in regards to the pond sizes or katicm. drainage easement widths, storm sewer locations. lot layout. landscape layout, or any other drainage related i881le8. 1nsufticJeot iDfounation is presented to conduct a complete drainage review and changes may be required during the construction pluming stage. 11. Please note that fiJrtber comments may be necessary at a later date. Should you have any questions, I can be reached at 317-776-8495. Sincerely, cc: Matt Griffin - Carmel DOCD 10hn South - HCSWCD Dick Hill- Carmel Engineering Mike McBride - HCHD <hi Dko - Crossroads Engineering Buckingham - David Lcazenby u u City of CarmeR Carn1l.eR Police DeJIDartn1l.,ent ;) Cic\'ic Sguare Carllllel, Indiana -46032 December 7, 2005 Richard J. Kelly, PE EMH&T 6994 Hillsdale Court Indianapolis, IN 46250 RE: Arden Job no.: 2005-2281 Dear Mr. Kelly: I have received and reviewed the plans submitted for the above-mentioned project. At the present time, I see nothing in the plans that would hamper law en- forcement efforts. If we can be of any further assistance to you, please contact us. Respectfully, Jt~'~.c{~~ Michael D. Fogarty Chief of Police MDF:vb cc: Dept. of Community Services .........{ "i(j (317) 571-2SDO A Nationally Accredited Law Enforcement Agency f'ax(317) G71-2S12 DEC. 5. 2005 9: 49AM Q u NO. 8945 P. 1/1 E M H& T Evans. Mechwart. Hambleton & nlton, Inc. l!nglneers. S\XVeYOIS. Plennell. Sr;ieniiSlS CTRWD ~G:U DEe 1 zoos Letter of Transmittal rh i$, Is Nor From: Mr. Rich Kelly Date: December 1, 2005 Job no.: 2005-2281 ~ Il) Re: Arden /}/IAJ(" Se('v(~.f Arftl.. Jmnikr '8rU-t"eY CTre. w~ o Courier Du.s. Mall 0 Fed. Ex. 0 UPS D originals D [other] o copies To: Ms. Jennifer Bruner Clay Township Regional Waste District 10701 N. College Ave. Indianapolis, IN 46280-1098 We are sending you herowith via: The following items: at Copies Date Number of DesGription sheets 1 11-16-05 Development Plan I Prlmaty Plat - Plan Sheets Cl.O & C2.0 . . These are transmitted as checked below: Droupproval Dfor your file Glas required Oror review & coJDJUCDt Dforexecution/ signatures o [other] Remarks:: The above referenced project is scheduled for the Carmel TAC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. Thank you. Copies To: Mr. lim Shinaver, Nelson & Frankenberger EMH&T File Signed: -o\v Richard 1. Kelly, PE Branch Manager "enalosutes ere not as noted, kindly notify us at once. MCMXXVI 69'14 HiJlsdOle Covtl.lndionopo!is, IN 462S0. Phone 317.913.6930. Fax317.913.6~ 0:>Umb1r'~. ~'CI\<llICl\I" emtJl.com ------ ~ u (j OS t 200 L2-.DPkillL S Construction/Stormwater Pollution Prevention Plan Technical Review and Comment (Form 1) Project Name: Arden Townhomes Primary Plat Plan Submittal Date: 12/01/05 Hydrologic Unit Code: Project Location Description: North side of 136th on the east side of Cool Creek Latitude and Longitude: Civil County: Hamilton = Q :; Project Owner Name: Buckingham Companies, AMO E Contact: David Leazenby Q. ~ Address: 333 N. Pennsylvania Street 10th Floor ... t: City: Indianapolis State: IN .~ Phone: 317-974-1234 FAX: 317-974-1238 Q 100 ~ Plan Preparer Name: Richard Kelly Affiliation: EMH&T Address: 7400 Shadeland Ave. Suite 150 City: Indianapolis Phone: 317 -913-6930 19 18N Zip: 46204 E-Mail: FAX: State: IN 317-913-6928 Zip: 46250 E-Mail: Review Date: 12/16/05 ~ Principal Plan Reviewer: John B. South P.E. CPESC .~ Agency: Hamilton County Soil and Water Conservation District ~ ~ Address: 1108 South 9th Street ; City: Noblesville s::: Phone: 317-773-2181 Assisted By: FAX: State: IN 317-776-1101 Zip: 46060 E-Mail: john-south@iaswcd.org PLAN IS ADEQUATE: A comprehensive plan review has been completed and it has been determined that the plan satisfies the minimum requirements and intent of 327 lAC 15-5. o Please refer to additional information included on the following page(s). D Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of the NO/. A NOI must also be sent to the D A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and revisions to the plan may be required at that time to address deficiencies. o Please refer to additional information included on the following page(s). D Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of the NO/. A NOI must also be sent to the o PLAN IS DEFICIENT: Significant deficiencies were identified during the plan review. o Please refer to additional information included on the following page(s). D DO NOT file a Notice of Intent for this project. o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re- submitted, and notification has been received that the minimum requirements have been satisfied. Plan Revisions Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified in the Plan Review Section above. DNR, Division of Soil Conservation Page 1 of 1 Revised 12/09/03, Form 1 Dee-OB-20DS 03:04pm From- u u T-S27 P.DDI/DOI F-B68 11111 Panhandfe Eastern Pipeline Co. has no company Facilities Evans, Mec:hwott, Hambleton & Tilton, Inc. involved in this project ~neeI$. SurvS)'ClfS. PIonnen. $c:Ienlbts ~ 1.~-,jgl05 I 191'led I Diie I Letter of Tr I1sm ittal To: Ms. Teresa Ma I or Mr. Mark Wood p$JnhSlnilTe East qn Pipeline 9371 Zionsville Indi:m:l\P01is. 46268 H1T From: Mr. Rich Kelly Date: December I, 200S Job no.: 2005-2281 l \ l'l Re: Arden We are sending yo !herewith via: D Cowier o copies o U.S. Mail 0 Fed. Ex. 0 UPS o originals 0 [other] The following item : Copies Date Number of sheets Description 1 11-16-05 Development Plan / Primary Plat - Plan Sheets Cl.0 8r. C2.0 These are transmit ;d as checked below: Dfor approval pror your tile GJas required 0 for review & comment Dforexecutionl si o [Olher] Remaa1cs: Thank you. ~roject is scheduled for the Cannel TAC meeting on December 21, FY review comments to my attention via fax or mail. . I r Mr. 1 ShinaVet, Nelson & Frankenberger EMH& I File Copies To: Signed: JD.,\.'- Richard J. Kelly, PE Branch Manager If ~UTN CilO not aB noted, kindl)' fIOtify UlS r.d onc;e. M C M II l\ V I 69 Iiillsclale Coun. Indanopolis,lN 462.50. Phone 317.911.6930 . Fax 317.'13.6928 c_. 0ncMcnI. ~. CtI<odDIIe emht.com u u EIMIH'fT Evans, Mechwart, Hambleton & Tlton. Inc. engineers. Surveyors, PIamers. Sdentlsts Letter of Transmittal To: Mr. Bill Akers Carmel Clay Communications 31 First Ave. NW Carmel, IN 46032 From: Mr. Rich KC11y Date: December 1,2005 Job no.: 2005-2281 Re: Arden We are sending you herewith via: o Courier Ii] U.S. Mail 0 Fed. Ex. 0 UPS The following Items: [i] copies DorigiDala 0 [other] Copies Date Number of Description sheets 1 11-16-OS Development Plan I Primary Plat - Plan Sheets Cl.0 & C2.0 These are transmitted as checked below: Dfar approval Dear YOW' file liJas required 0 for review & comment Dforexecutionl signatW'es o [other] Remarks: The 'above referenced project is scheduled for the Cannel TAC meeting on December 21, 2005. Please forward any revie.w comments to my attention via fax or mail, Thank you. Copies To: Mr. Jim Shinaver, Nelson & Frankenberger EMH&T File Signed: If enclosures 61'8 not as nded, klndty notify us at onc9. MCMXXVI 6994 H11lsdole Court. Indlcnopols. IN ~~ . Phone 317.913.6930 . I'<llC 317.913.6928 CcUnbut. 0drGlI. -..-. ~ emht.com u (j EfMHsT Evans. Mechwart. Hambleton & mon.lnc. EngIneers. Surveyors, Plannel1. Sdenlfsts Letter of Transmittal To: Mr. Scott Brewer Dept. of Community Services One Civic Square Carmel, IN 46032 From: Mr. Rich Kelly Date: December 1, 200S Job no.: 2005-2281 Re: Arden We afe sending you herewith via: [XJ Courier 0 U.S. Mail 0 Fed. Ex. 0 UPS [Xl copies Dorigina1a 0 [other] . The following items: Copies Date Number of Description sheets 1 11-16-05 9 Development Plan I Primary Plat ," These are transmitted 88 checked below: Dforapproval Dforyourfile Glasrequired Dforreview&comment Dror execution I signatures 0 [other] RenwIcs: The above referenced project is scheduled for the Carmel T AC meeting on December 2 I, 2005. Please forward any review comments to my attention via fax or mail. Thank you. Cq)Ies To: Mr. Jim Shinaver, Nelson & Fraokenberger EMH&T File Signed: fJ " 6Ilc/osll/'8S 818 not as noted, kindly notify lIB 81 once, MCMXXVI 6994 H1l1sdole Court.lndllJllClPCllb.IN <16250. Phone 317.913.6930 . Fax 317.913.6?28 Cclt..mbus. ~. ~ . Challolla emhl.com u u I I EIMIH,~T Evans. Mechwart. Hambleton & moo. Inc. E:ngIneers. SU'leycn. Plonnel'$. ScIentIsts Letter of Transmittal To: Mr. John Duffy Carmel City Utilities 760 Third Ave. SW Carmel. IN 46032 From: Mr. Rich Kelly Date: December I, 2005 Job no.: 2005-2281 Re: Arden We are sending you herewith via: o Courier Ii] U.S. Mail 0 Fed. Ex. 0 UPS The following Items: [Xl copies o originals D [other] Copies Date Number of Description sheets 1 11-16-05 9 Development Plan I Primary Plat These are transmitted 88 checked below: Dfor approval o for your file @as required 0 for review & comment Dfar execution I signatures 0 [other] R18mark&: The above referenced project is scheduled for the Carmel T AC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. Thank you. CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger EMH&T File Signed: If encJosutaS Bit not 88 noted, IdndJy notify III III once. MCMXXVI 6994 HIlIsdale court. Indlonopolls. IN 46250 . Phone 317.913.6930 · fax 317.913.6928 c:oMnbuI.~. ~. ChafIoIte emht.com u u II I M:HL~T Evans. Mechwart, Hambleton & lUton, Inc. Englneets. Sl.IVeyors. Planners. ScIentists Letter of Transmittal To: Chief Michael Fogarty Carmel Police Department Three Civic Square Cannel, IN 46032 From: Mr. Rich Kelly Date: December It 200S Job no.: 2005-2281 Re: Arden The fallowing Items: Ii] Courier 0 U.S. Mail 0 Fed. Ex. 0 UPS [Xl copies D originals 0 [other] We are sending you herewith via: Copl.. Date Number of Description sheets 1 11-16-05 Development Plan I Primary Plat - Plan Sheets Cl.O & C2.0 Tbese are transmitted as checked below: Dfor approval o far your file o for execution I signatures Remarks: liJas required D for review & comment D[other] The above referenced project is scheduled for the Carmel T AC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. . Thank you. CopIes To: Mr. Jim Sbinaver, Nelson & Frankenberger EMH&T File Signed: If encIOSU18S 818 not as noted, kindly notify us at once. MCMKXVI 6994 HIUsdole court. indianapolis. IN 462S0. Phone 317.913.6930 . I'GlC 317.'13.6928 ~'CR*IIXIlI'~'~ emht.com u u E M H'rT Evans. Mechwart. Hambleton & lUton. Inc. EngIneers. Sulveyon. PIannen. Sclentlsts Letter of Transmittal To: Mr. Gary Hoyt Office of Fire Chie( Station #1 Two Civic Square Cannel, IN 46032 From: Mr. Rich Kelly Date: December 1,2005 Job no.: 2005-2281 Re: Alden The following Itema: [i] Courier 0 U.S. Mail 0 Fed. Ex. 0 UPS Ii] copies DorigiDa1s 0 [other] We are sending you herewith via: Copies Date Number of Description sheets 1 11-16-05 Development Plan I Primary Plat - Plan Sheets C1.0 & C2.0 1 Turning Radius Exhibit Theae are transmitted as checked below: Dfor approval Dfor your file GJ as required D for review & comment o for execution I signatures o [other] RerrBIca; The above referenced project is scheduled for the Cannel TAC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. Thank you. CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger EMH&T File Signed: If encIosUl8$ IlI8 not as noted, IdndJy notify /If sf once. MCMXXVI 6"4 H11lSda1e Courl.lndlo1apolls.IN 46250. Phone 317.913.6930. Fox317.913.6928 CoUnIlla' QIc:hlaI. ___. ~ emht.com u u EIMiH<~T Evans. Mechwart. Hambleton & lUtan. Inc. Engineers. Surveyon. Plannel$, Sclenllsts Letter of Transmittal To: Mr. Tun Blanchard Assistant Building Commissioner One Civic Square Carmel, IN 46032 From: Mr. Rich Kelly Date: December 1. 200S Job no.: 2ooS-2281 Re: Arden We are .endlng you herewith via: [X] Courier DU.S.Mail o Fed. Ex. o UPS The following Items: Ii.] copies Oorigina1s 0 [other] Copies Date Number of Description sheets 1 11-16~S 9 Development Plan I Primary Plat " These are transmitted as checked below: o for approval Oror your file lil as required Dfor .review & comment o for execution I signatures 0 [other] Remarks: The above referenced project is scheduled for the Cannel T AC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. Thank you. CcpIes To: Mr. Jim Shinaver, Nelson & Frankenberger EMH&T File Signed: IJ If encIosut8s 8/8 not as noted, kindly nollfy lIB at once. MCMXXVI 69'14 HlllSc:lale Court. Indianapolis. IN 462SO . Phone 317.913.6930 · Fax 317.913.6928 CaII..rr&M. CInc:hd. ~ . CtDto8e emht.com u u ElM H<yT Evans. Mechwart. Hambleton & lUton,lnc. Engineell. Su/VeyOl$. PIonne!1, Sc:Ienflsts Letter of Transmittal To: Mr. Gary Duncan! Mr. Nick Redden Carmel Engineering One Civic Square Carmel, IN 46032 From: Date: Job no.: Re: Mr. Rich Kelly December I, 2005 2005-2281 Arden We are sending you herewith via: GJ Courier D u.s. Mail D Fed. Ex. 0 UPS The following Items: [X] copies D origjDals 0 [other] Copies Date Number of Description sheets 1 11-16-05 9 Development Plan I Primary Plat 1 11-29-05 Initial Drainage Report 1 Turning Radius Exhibit These are transmiUed as checked below: Dforapproval Dforyourfile Iilas required Dforreview & comment Oror execution I signatures 0 [other] RerrBkB: The above referenced project is scheduled for the Carmel TAC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. Thank you. CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger EMH&T File Signed: IJ If encIosur8S 1118 not BS noted, kindly notify us at once. MCMXXVI 6994 HlIIsdaJe Court. indIanapolis. IN 46250. Phone 317.913.6930 . Fax 317.913.6928 CdMllI:M. QlcftIatI. ..........,.., . ~ emht.com u u i I EiM HefT Evans, Mechwart, Hambleton & TUtor\, Inc. Enl#neers. Surveyors. Planners. Sclentlsls Letter of Transmittal To: Mr. MarkWcstenneier Cannel Clay Parks Department 760 Third Ave. SW, Suite 100 Carmel, IN 46032 From: Mr. Rich Kelly Date: December I, 200S Job no.: 2005-2281 Re: Arden We are sending you herewith via: The following Items: o Courier [i] U.S. Mail 0 Fed. Ex. 0 UPS Iil copies 0 originals 0 [othc:a-] Copl.. Date Number of DeacrlpUon sheets 1 1l-1~S Development Plan I Primary Plat - Plan Sheets Cl.O & C2.0 Theae are transmitted as checked below: o for approval Ofor your file liIas required 0 for review & comment o for execution I signatures 0 [other] RIrnIItat; The above referenced project is scheduled for the Carmel TAC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. Thank you. CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger BMH&T File Signed: If encIosut8s BIe not as noted, kindly notify us 81 OIIC& MCMXXVI 6994 H1lIsdale coun.lndlanapols, IN 46250 . Phone 317.913.6930. Fax317.913.6928 ~'<:n:maII'~'~ emhl.com u w HtT Evans. Mechwart. Hambleton & TIlton, Inc. EnglneelS, surveyors. Plannltl'S. ScIentists Letter of Transmittal To: Mr. Mike McBride Hamilton County Highway Dept. 1700 S. 10th St. Noblesville. IN 46060 From: Mr. Rich Kelly Date: December 1. 2005 Job no.: 2005-2281 Re: Arden We are sending you herewith via: The following items: o Courier lil U.S. Mail 0 Fed. Ex. 0 UPS [;] copies DoriSmats 0 [other] Copies Date Number of Description sheets 1 11-16-05 Development Plan I Primary Plat- Plan Sheets Cl.O, C2.0 & C2.1 Th8$e are transmitted as chec:ked below: Dior approval Dior your file [i] as required D for review & comment Dror execution I signatures D [other] Remarks; The above referenced project is scheduled for the Cannel T AC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. Thank you. Copies To: Mr. Jim Shinaver, Nelson & Frankenberger EMH&T File Signed: ~.PE Branch Manager If enc/O$IHDS 8t8 not as noted, kindly notify us at once. MCMXXVI 6"" H11b;dale Court. lr\dIanaIJoUs. IN 462~ · Phone 317.' 13.61130 . Fax 317.913.6928 (;clUmbI,a. QdlnatI. ~ . CIlcIIaIIe emht.com u u E M H,~ T .\ Evans, Mechwart. Hambleton & TIlton. Inc. Englneers. Surveyors. Planners. Sdentlsts Letter of Transmittal To: Mr.lason LeMaster Hamilton County Health Department One Hamilton County Square, Suite 30 Noblesville, IN 46060-2229 From: Mr. Rich Kelly Date: December I, 2005 Job no.: 2005-2281 Re: Arden We are sending you herewith via: o Courier Ii] U.S. Mail D Fed. Ex. D UPS !iJcopies Doriginals 0 [other] The following items: Copies Date Number of DescrIption sheets 1 11-16-05 Development Plan I Primary Plat - Plan Sheets Cl.0 & C2.0 These are transmitted as checked below: Oror approval Dror your file [ilas required 0 for review & comment Dfor execution I signatures o [other] Remarks: The above referenced project is scheduled for the Carmel T AC meeting on December 21, 200S. Please fOlWard any review comments to my attention via fax or mail. Thank you. CqJIes To: Mr. Jim Shinaver, Nelson & Frankenberger EMH&T File Signed: Jl If encIosU18S 819 not 88 noted, IdndJy notify us st once. MCMXXVI 6994 H1l1sdole court. tldIalopois. IN 46250 . Phone 317.913.6930 . Fax 317.913.6928 CcMIIbul'OdlnaII'~' ~ emhl.com u u EIMIH,~T Evaru, Mechwart, Hambleton & Tlton. Ine. EngIneers. SlIVeyors. I'IanneJs, Sclentlsts Letter of Transmittal To: Ms. Brooke Gajownik Hamilton County Sheriffs Office 18100 Cumberland Rd. Noblesville, IN 46060 From: Mr. Rich Kelly Date: December 1,2005 Job no.: 2005-2281 Re: Arden We are sending you herewith via: o Courier lXl U.S. Mail 0 Fed. Ex. 0 UPS @ copies D origiDa1a 0 [other] The following Items: Copies Date Number of Description sheets 1 11-16-05 Development Plan I Primary Plat - Plan Sheets Cl.0 &: C2.0 These are transmitted as checked below: Ofor approval Ofor your file @as required 0 for review &; comment Dfor execution I signatures D[other] - R8nBIc&: The above referenced project is scheduled for the Carmel TAC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. Thank you. CopIes To: Mr. Jim Sbinaver, Nelson & Frankenberger EMH&T File Signed: ~'PE Bran anager "encIosl/t8$ Bt8 not lIB noted. kindly notify us 81 0IIC8. MCMXXVI 6994 HIlIsdaJe Court. IndlanapoJls.1N 46250 . Phone 317.913.6930 . Fax 317.913.6928 CclImbuo' 01ch1aII' ____. ~ emht.com u u EIMiH<fT Evans, Mechwart, Hambleton & TUton, Inc. Enol""", Surveyors. Planners. Scientists Letter of Transmittal To: Mr. Dcu Groves or Ms. Shirley Hunter Cincrgy 1441 S. Guilford Rd. Carmel, IN 46032 From: Mr. Rich Kelly Date: December 1,2005 Job no.: 2005-2281 Re: Arden We are sending you herewith via: o Courier [i] U.S. Mail 0 Fed. Ex. 0 UPS The following Items: [i] copies Doriginals D [other] Capl. Date Number of DescrIption sheets 1 11-16-05 Development Plan I Primary Plat- Plan Sheets C1.0. C2.0. C2.l & C2.2 These are transmitted as checked below: Dforapproval o for your file GJasrequired Dforreview&comment Dfor execution I signatures D [other] Renwb: The above referenced project is scheduled for the Cannel TAC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. Thank you. CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger EMH&T File Signed: {J If encIosUIW '" not as noted, IdndIy notify us lilt once. MCMXXVI 6994 HllbdalII COUft.lndlanapolls.lN 46~. PllOne 317.'113.6930 · f<Dc 317.913.6'128 Cc*IMtu:. ~. ~. ChcIIotte emht.com u u EIMIH<~T Evons. Mechwarf. Hambleton & 11Iton. Inc. engineers. 5urveycn. P/annen, Sdenllsfs Letter of Transmittal To: Mr. Ron Farrand Carmel Clay Schools 5201 E. 131st St. Carmel,IN 46032 From: Mr. Rich Kelly Date: December I, 2005 Job no.: 2005-2281 Re: Arden The following Items: o Courier [i] U.S. Mail 0 Fed. Ex. D UPS [i] copies D originals 0 [other] We are sending you herewith via: Copies Date Number of Description sheets I 11-16-05 Development Plan! Primary Plat - Plan Sheets CI.O & C2.0 Theae are transmitted as checked below: Dfor approval Dfor yom file [iJ as required 0 for review & comment Dfor execution! signatures DCother] R8marIcs: The above referenced project is scheduled for the Cannel TAC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. Thank you. CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger EMH&T File Signed: If encIo8tmJ8 8/'& not as noted, kindly notify us 81 once. MCMXXVI 6994 HillscloIe court.1ndIonopo1s, IN -462S0 - ",on8317.913.693O -1'alc317.?13.6928 CcMnbuo . 01chlalI. -........ . 00lclIt. emht.com u (.) E M HefT Evans. Mechwort. Hambleton & Won. Inc. EnglnHl'S. SUlVeyors. Planners. Sdentlsts Letter of Transmittal To: Mr.lohn South Hamilton County SWCD 1108S. 9th St. Nob1esville.lN 46060 From: Mr. Rich Kelly Date: December 1, 200S Job no.: 2005-2281 Re: Arden W. are sending you herewith via: G] Courier D U.S. Mail D Fed. Ex. 0 UPS [Xl copies 0 originals 0 [other] The following Items: Copies Date Number of Description she. I 11-16-05 9 Development Plan I Primary Plat ., :. These are transmitted as checked below: Dfor approval Ofor your file GJas required o for review & comment Dfor execution I signatures 0 [other] ~ The above referenced project is scheduled for the Carmel TAC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. Thank you. Copies To: Mr. Jim Shinaver. Nelson & Frankenberger EMH&T File Signed: If enclosures 818 not as noted, Ic/ndIy notify us 81 once. MCMXXVI "'4 HlIIsdCle Court. Indianapolis, IN 46250. Phone 317.913.6930' Fax317.913.6928 Cobnbus ' CIncndI' hc:Ic:InapaIJ . 0at0IIe emht.com (j u E MIH'fT Evans, Mechwart, Hambleton & TIlton. Inc. fnglneers, Surveycn. Planners. ScIenllsh Letter of Transmittal To: Mr. Greg Hoyes Hamilton CoWlty Surveyor's Office One Hamilton Colmty Square, Suite 188 Nobesville. IN 46060 From: Mr. Rich Kelly Date: December 1. 2005 Job no.: 2005-2281 Re: Arden We are sending you herewith via: The following Items: [Xl Cowier D U.S. Mail D Fed. Ex. D UPS IiJ copies o originals 0 [other] Copies Date Number of Description sheets 1 11-16-05 9 Development Plan I Primary Plat 1 11-29-05 Initial Drainage Report These are transmitted as checked below: Dfor approval Dfor your file Iilas required D for review & comment Of Of execution I signatures 0 [other] R8nwIcs: The above referenced project is scheduled for the Carmel TAC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. Thank you. CopIes To: Mr. Jim Shinaver. Nelson & Frankenberger EMH&T File Signed: I i I i i i i .! i I. I i ~ If enc/osU/88 818 not 88 noted, lcfndJy notify us lit once. MCMlCXVI 69904 H1l1sdole Court.lnclanapoDs.1N <46250. Phone 317.913.6930. Fox317.913.6928 CaMrtlus. Ch:hIaII. ~. ~ emhl.com Q o E,MIHc(T Evans. Mechwart. Hambleton & Tltoo. Inc. engIneers, SUlVeyors. Planners, Sclenllsls Letter of Transmittal To: Mr.lasonKirkman Briglrthouse Networks 3030 Roosevelt Ave. Indianapolis, IN 46218 From: Mr. Rich Kelly Date: December 1, 2005 Job no.: 2005-2281 Re: Arden w. are sending you herewith via: o Courier Ii} U.S. Mail 0 Fed. Ex. 0 UPS The following Items: [Xl copies o originals D [other] Copies Date Number of Description sheets 1 11-16-05 Development Plan I Primary Plat- Plan Sheets C1.0. C2.0 & C2.1 These are transmitted as checked below: Dror approval OrOt your file [Xl as required D for review & comment Dror execution I signatures 0 [other] R8rnaIb: The above referenced project is scheduled for the Carmel T AC meeting on December 21, .2005. Please forward any review comments to my attention via fax or mail. Thank you. CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger EMH&T File Signed: If encIosUf8S ate not lI$ noted, kindly notify us at once. MCMXXVI 69P4 HlDsdale court, indianapolis. IN 462S0 . Phone 317.913.6930 . Fax 317.913.6928 CoI.rnbuo . ~. hdcI\apoIb . CIIarIoIIe emht.com u Q iii M Hl~T Evans, Mechwart. Hambleton & lUtoo, Inc. EngIneers. Surveyors. Plann8ll. Sdenll5ls Letter of Transmittal To: Ms.lennifer Marlett Indianapolis Water Company 1220 Waterway Blvd. Indianapolis, IN 46206 From: Mr. Rich KeRy Date: December I, 2005 Job no.: 2005-2281 Re: Arden We are sending you herewith via: o Courier [i]u.s. Mail D Fed. Ex. D UPS GJcopies Doriginals D [other] The following Items: Copies Date Number of Description sheets 1 11-16-05 Development Plan I Primary Plat- Plan Sheets C1.0, C2.0 & C2.1 These are transmitted 8S checked below: o for approval Dfor your file [i] as required 0 for review & comment o for execution I sigoatures 0 [other] RemiItc&; The above referenced project is scheduled for the Carmel TAC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. Thank you. CopIes To: Mr. 1im Shinaver, Nelson & Frankenberger EMH&T File Signed: If encIosUI8S 8IV not as noted, kindly nalffy us at once. MCMXXVI 6994 H/l1sd0le Court.lndlanapols.IN 46250. Phone 317.913.6930. faK317.913.6928 CoIunlbuJ . Ct1c:tncIII. ndlanqooIo . Qladotle emhl.com u u E MIH'rT Evans. Mechwart, Hambleton & TDton, Inc. En~8B. SulveyOl$. Plannen. Sdenllsts Letter of Transmittal To: Ms. 1ennifer BJUIler Clay Township Regional Waste District 10701 N. College Ave. Indianapolis, IN 46280-1098 From: Mr. Rich Kelly Date: December 1, 2005 Job no.: 2005-2281 Re: Arden We are sending you herewith via: D Courier [Xl U.S. Mail D Fed. Ex. 0 UPS [XJ copies 0 originals 0 [other] The following Items: Copies Date Number of Description sheets 1 11.16-05 Development Plan! Primary Plat - Plan Sheets Cl.O & C2.0 These are transmitted as checked below: Dforapproval Dforyourfile G]asrequired o for review & comment Dfor execution! signatures o [other] Ren&1c&; The above referenced project is scheduled for the Carmel TAC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. Thank you. CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger EMH&T File Signed: tI~ Richard Kelly, PE Branc Manager If 9Ilc/osu19S are not as noted. Idndfy notify us at once. M C M )( )( V I 69'" tilllsdale Court.lndlanQj:)oIis.1N <46250' Phone 317.913.6930' Fax317.913.6928 c:..t..mtM . ClncIMOIl . hfanapcIs . ~ emht.com u u E MiH'iT Evans, Mechwcrt, Hambleton & 11Iton, Inc. Englne<<s, Surveyors. Planners. Sc/entlsls Letter of Transmittal To: Ms. Teresa Magee or Mr. Mark Wood Panhandle Eastern Pipeline 9371 Zionsville Rd. Indianapolis, IN 46268 From: Mr. Rich Kelly Date: December I, 2005 Job no.: 2005-2281 Re: Arden The following Items: o Courier [i] U.S. Mail 0 Fed. Ex. 0 UPS [i] copies 0 originals 0 [other] We are sending you herewith via: Copies Date Number of Description sheets 1 11-16-05 Development Plan I Primaly Plat - Plan Sheets Cl.O & C2.0 These are transmitted as checked below: Dfor approval Of Of your file @as requinxl 0 for ~view & comment o lor execution I signatures 0 [other] RsmmIcs: The above referenced project is scheduled for the Cannel TAC meeting on December 21, 2OOS. Please forward any review comments to my attention via fax. or mail. Thank you. CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger EMH&T File Signed: If enclosures 81'8 not /IS noted, klndJy notffy us at 0IlCle. MCMXXVI 6994 HllIsdale Court. Indianapolis. IN 46250 . Phone 317.913.6930 . Fax 317.913.6928 C<*Imbut. QICtnalI. ~. ~ emht.com u u II I MIH&T Evans. MechWOff. Hambleton & lUton, Inc. engineers. Surveyors, Planners, Sdentlsts Letter of Transmittal To: Mr. Greg Dko, PE CrossRoads Engineering 3417 S. Sherman Dr. Beech Grove, IN 46107 From: Mr. Rich Kelly Date: December I, 2005 Job no.: 2005-2281 Re: Arden The following Items: o Courier Ii] U.S. Mail 0 Fed. Ex. 0 UPS lil copies 0 originals D [other] We are sending you herewith via: Copies Date Number of Description sheets 1 11-16-05 9 Development Plan I Ptimary Plat 1 11-29-05 Initial Drainage Report These are transmitted as checked below: Dfot approval Dfor your file lil as required D for review &. comment Dror execution I signatures D [other] RenwIcs: The above referenced project is scheduled for the Cannel TAC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. Thank you. Copies To: Mr. Jim Shinaver, Nelson & Frankenberger EMH&T File Signed: If encIosUf8$ '" not as natJJd, kInd/y notify us at once. MCMXXVI 6994 tllUsc:klle Court. Indlcnapoll$, IN 46250 · Phone 317.~13.6930 . Fox 317.913.6928 CGb'nbuII ChcImoII. ~. ChcIIIotII emht.com u u ElM H,~T Evans, Mechwart, Hambleton & TIlton, Inc. engineers. SUlVeycn Planners. SCIentists Letter of Transmittal To: Poasbnaster c/o Cindy KW'ber Cannel Post Office 275 Medical Dr. Carmel. IN 46032-9998 From: Mr. Rich Kelly Date: December 1.2005 Job no.: 2005-2281 Re: Arden The following Items: o Courier [i) U.S. Mail 0 Fed. Ex. 0 UPS [i) copies 0 originals 0 [other] We are sending you herewith via: Copies Date Number of Description sheets 1 11-16-05 Development Plan / Primary Plat - Plan Sheets Cl.O &. C2.0 These are transmlUed.as checked below: Dfor approval Deor your file @as required 0 for review &. comment Dfor execution I signatures 0 [other] Rerr&Ics: The above referenced project is scheduled for the Carmel T AC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. Thank you. CopIes To: Mr. Jim Sbinaver, Nelson & Frankenberger EMH&T File Signed: wPu.{j{; Branch Manager If encIosUl8a 818 not 81 noted, kindly notify us at once. MCMXXVI 6994 Hllsdale CoUll. Indlalapolls, IN 46250. Phone 317.913.6930. Fax317.913.6?28 CaU'nIM' Qoolnnalf. ~. ~ emhl.com u u H'rT Evans, Mechwart. Hambleton & TDton, Inc. fn~ Surveyors. Planners. Sdentlsls Letter of Transmittal To: Mr. Dave Klingensmith Carmel Street Deparbnent 3400 W. 13Ist St. Westfield.lN 46074 From: Mr. Rich Kelly Date: December 1. 2005 Job no.: 2005-2281 Re: Arden We are sending you herewith via: o Courier [Xl U.S. Mail 0 Fed. Ex. 0 UPS The following Items: GJ copies o originals 0 [other] CopIes Date Number of Descrfptlon sheets 1 11-16-05 Development Plan / Primary Plat - Plan Sheets C1.0, C2.0, C2.l & C2.2 These are transmitted as checked below: Dror approval o for your file [i]as required 0 for review & comment Dfor execution I signatures 0 [other] Rsmark8: " The above referenced project is scheduled for the Carmel TAC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. Thank you. CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger EMH&T File Signed: If enclo6U188 618 not 88 noted, kindly notify us It once. MCMXXVI 699-4 Hill$dOle Court.lncllonopolb.IN ~ . Phone 317.913.6930. I'CIlc 317.913.6928 Cc*Jmbus . CIIlcIMaIl. IncIIanapoIo . ~ emht.com u II Evans. MechWOlf, Hambleton & TOton. Inc. Engineers. Suv8ycB. Planners. Sdenlllts u MIHL~T i Letter of Transmittal To: Mr. Chuck Shupperd Vectren Energy P,Q.Box 1700 Noblesville, IN 46061-1700 From: Mr. Rich Kelly Date: December 1, 2005 Job no.: 2005-2281 Re: Arden We are sending you herewith via: o Courier GJ u.s. Mail 0 Fed. Ex. 0 UPS The following items: IiJ copies o originals D [other] Copies Date Number of Descrlptfon sheets 1 11-16-05 9 Development Plan! Primary Plat- Plan Sheets C1.0, C2.0 & C2.1 These are transmitted as checked below: Dfor approval Ofor your tile lilas required 0 for review & comment Dfor execution! signatures o [other] R8markB: The above referenced project is scheduled for the Carmel TAC meeting on December 21, 2005. Please forward any review comments to my attention via fax or mail. Thank you. Cqlies To: Mr. Jim Sbinaver, Nelson & Frankenberger EMH&T File Signed: If encIosu1e8 aJ9 not ss noted, Idnd/y notify us 81 once. M C M lC lC V I 699-4 Hillsdale COUlt.lndlanopols.lN 46250 . PhOfle 317.913.6930 . Fax 317.913.69.28 COIumtaw . ~ . hcIIn:IpoII- OIadofte emht.com u' NELSON & FRANKENBERGER A PROFESSIONAL CORPORATION ATTORNEYS-AT-LAW \j JAMES J. NELSON CHARLES D. FRANKENBERGER JAMES E. SHlNAVER LAWRENCE J. KEMPER JOHN B. FLATI' FREDRIC LAWRENCE DAVID J. LIClITENBERGER of counsel JANE B. MERRD..L 3105 EAST 98TH STREET SUITE 170 INDIANAPOLIS, INDIANA 46280 317-844-0106 FAX: 317-846-8782 www.nf-law.com November 18,2005 /:(/~/--( I"-.Y ,'>,;/ /j' 1 --I " -~ '~~-; .\ -..... :' '"," VIA HAND DELIVERY r(~-~'~~- 1~ ,~: ')f..,:; l:~. _.:~ ,_~';I " I - .....~:", I' , - -- --'. / \~ ';,.. \-- , \- Matt Griffin City of Carmel Department of Community Services RE: Arden Townhomes - ADLS, Development Plan and Plat Applications Dear Matt, Enclosed please find the following: 1. An original and one (1) copy of an ADLS Application; 2. An original and one (1) copy of a Development Plan Application; 3. An original and one (1) copy of a Plat Application; 4. Petitioner and Owner Consents; 5. Legal Description; 6. Last Deed of Record; 7. Proposed Zoning Schedule; . 8. . Sample Declaration of Covenants, Conditions and Restrictions; and 9. Associated Plans and Drawings for the ADLS, DP and Plat approval Applications. As you know, the Arden Rezone Pending under Docket Number 0505004Z and Ordinance Number Z482-05 is currently before the Common Council for final review and approval. In anticipation of a possible approval of the rezone, we are filing the enclosed applications for ADLS, Development Plan, Plat Approval. If the rezone is approved, you can obtain from the Clerk-Treasurer's Office the final and approved PUD ordinance which will govern the development of this project. The engineers will mail directly to the T AC agencies in your office, the plans required for the tax submittal. Please be sure that this matter is placed on the T AC Agenda and provide me a Nelson & Frankenberger U. November 18, 2005 . Page 2 \j copy of that agenda prior to the meeting. Also, please review the zoning schedule and advise me if I have provided the. correct chronology of deadlines and hearing dates. Finally, after you have reviewed the enclosed applications, please assign the appropriate docket numbers and advise me of the filing fee so that I can have my client pay the same. As usual, thank you for your cooperation and assistance in this matter. Very truly yours, NELSON & FRANKENBERGER, P.c. JES/kat Enclosure H:\brad\buckingham\arden\griffin Itr 111705.doc 11/18/05 12/06/05 12/21/05 12/21/05 12/23/05 01/06/06 01/11/06 01/17/06 01/27/06 02/07/06 02/24/06 03/07/06 03/1 0/06 03/15/06 03/21/06 . . -~-. w ~ ARDEN ADLS Deadline to file Engineer mail T AC submittal T AC meeting during business hours Noon deadline e-mail notice to Indianapolis Star Deadline mail c/m to publish notice Noon deadline file brochures/proofs Notice with Staff / C-e.-e.. Staff Reports issued 6:00 p.m. PC meeting (151 meeting) Noon deadline file revised PC Committee brochures (if needed) 6:00 p.m. 15t Committee meeting' , Noon deadline file revised PC Committee brochures 6:00 p.m. 2nd PC Committee meeting. Noon deadline final PC brochures due Staff Staff Reports issued 6:00 p.m. PC meeting (2nd meeting/fmal vote)* *The above schedule contemplates 2 PC Committee meetings. If only 1 PC Committee meeting is required, the final full PC meeting will occur on 02/21/06 for a final vote. H:\brad\Buckingham\Arden\PC Schedule.doc