Evans, Mechwart, Hambleton & Tilton, Inc.
Engineers, Surveyors, Planners, Scientists
January 9, 2006
Il:~;~:~~~>~'
. . /\
/':-" \......> " ' / ',,:
,~'I.;;Y 'if?, ._.. ./ \> \
1 " . ~/'\
(,'1 (.;,<';~)~./ ..', i
,,'~""" 1'/'
\. '.... . ..' :{s .' ....1} ..1.=.=.
. ...l 1--..
\ .' I: .
. '. , I. .:
..,... /'<
, . ~ '"
, '\.
". ~'.
'-..: ". .., \ \~,
.------. :~~c~~;;j./
Ms. Christine Barton-Holmes, Planning Administrator
City of Carmel
One Civic Square
Carmel, Indiana 46032
Arden Townhomes (05120012 DP/ADLS)
Response to T AC Review Comments
EMH& T Project Number 2005-2281
Dear Ms. Barton-Homes:
The following outlines our responses to the TAC comment letters regarding the DP/ADLS review of the
above-referenced project. The following identifies our response or action taken to address each
comment:
City of Carmel DeDartment of Community Services
From Ms. Christine Barton-Homes
Letter dated December 19, 2005
Comment Item Response
1. The Developer prefers to have a single pedestrian connection to the path on Smokey
Row Road as shown on the plan. The walk extending along the west side of the
entrance road will be located along the existing gravel drive into the property and will
meander through the existing large trees. Residents on the east side of the site can
access the walk at two designated ramps/cross walk areas.
2. We will provide a fence along the northern side of the property between the trail and
the rear of Building 11.
3. The Developer attempted to address this comment by making Buildings 15 and 16
front-loading, with green space in the middle instead of the alley. However, having
front-loaded units on Rosalind Place and Bard Lane results in driveways along these
main streets, which would disrupt the sidewalk and pedestrian circulation throughout
this area of the site. The front-loaded units also have rear porches which would
encroach into the middle green space and reduce its mitigating effect. As a result, the
Developer has decided to leave the orientation of Buildings 15 and 16 as shown on
the submitted plan in order to maintain the aesthetics and pedestrian-friendly
character of the project.
Crossroads Enaineerina
From Mr. Gregory IIko
Letter dated December 15, 2005
Comment Item Response
1. This information will be provided with the final construction plans and drainage report.
2. This information will be provided with the final construction plans and drainage report.
3. This information will be provided with the final con~~fuction plans and drainage report.
MCMXXVI
6994 Hillsdale Court, Indianapolis, IN 46250 . Phone 317.913.6930' Fax 317.913.6928
Columbus. Cincinnati. Indianapolis. Charlotte
emht.com
Ms. Christine Barton-Holmes W
City of Carmel
Department of Community Services
January 9, 2006
Page 2
Q
/'/'-__~ _M_..........____.......
/ "'- "
/// '\.'\ \
. \
\-
\
\
.;,
City of Carmel Enaineerina Department
From Mr. Nicholas Redden
This information will be provided with the final construction plans8!1d drainage report. -
"- /<"
'>--:J~//
4.
Letter dated December 15, 2005
Comment Item Response
1. thru 12. Acknowledged
13. There will be no placement of fill material in the floodplain other than that required to
construct the entrance drive along the eastern portion of the site. The only additional
fill material that may be placed in the floodplain would be for the proposed multi-use
path along the north side of Smokey Row Road. We are awaiting direction from the
Carmel Engineer's Office on the details of this path and whether or not it is to be
constructed under this project. .
14. Acknowledged
15. Monuments will be provided as required and will be depicted on the Secondary Plat
filed with the construction plans.
16. There are no common areas within the right-of-way.
17. No easements overlap the tree preservation area.
18. On-site streets will be private and have been labeled as requested.
19. We have confirmed that the water main easement is contiguous with the property line
of Arden and that access to the City's water main will not be an issue. This
information will be depicted on the final plans.
20. Correct.
21. A truck turning radius exhibit was sent to Mr. Gary Hoyt as a part of the TAC submittal
which indicates that his largest apparatus can access all areas of the site.
22. The enclosed revised plans show a reduction in the width of the drive as requested.
23. The requested detention volume for Smokey Row Road r/w is provided per the Initial
Drainage Report as submitted with the Development Plans.
24. A meeting is scheduled for January 10, 2006 with Gary Duncan to discuss the design
of the entrance.
25. Please provide direction on the Department's preferred alignment for the path along
Smokey Row Road.
26. The requested information will be shown on the final construction plans.
27. The requested information will be shown on the final construction plans.
28. The requested information will be shown on the final construction plans.
29. The requested information will be shown on the final construction plans.
Ms. Christine Barton-Holmes U
City of Carmel
Department of Community Services
January 9, 2006
Page 3
Q
30.
'.
. ~~, '. _ tS~;:.'
As requested, Sheets L 1.0, L 1.1, L 1.2, SE1.0 and the architectur~1 details ha~e;'been / /
removed from the set submitted to the Department of Engineering. ", // .
"'-.......- ...~______.// r"-
31.
The requested information will be shown on the final construction plans.
32.
Acknowledged.
33.
Detail PA-3D has been revised per your request.
34.
Acknowledged.
35.
The requested information will be shown on the final construction plans.
36.
The requested information will be shown on the final construction plans.
City of Carmel Department of Community Services
From Mr. Scott Brewer
E-mail Dated December 12, 2005
Comment Item Response
1. We have not shown an additional landscape buffer on the east side of the property
due to the existing natural buffer of mature trees and heavy vegetation adjacent to the
east side of the property. Although this existing vegetation is not located on our
property, it is within the easement area that will be dedicated to the City of Carmel for
the Cool Creek North Trail High School extension. We are confident that this existing
buffer will remain in place, due to the fact that we will be constructing this portion of
the trail at the same time as the Arden Townhomes, and our engineer is responsible
for the design of this portion of the trail and easement area.
Section 26.04.05 of the Carmel Ordinance states that "Existing vegetation may be
used to achieve project buffering if: (a) the vegetation located upon the subject parcel
is of a quality and state of health to achieve buffering, and, (b) the vegetation is
proposed to be preserved using accepted best management practices for tree
protection during construction."
2. This change has been made and is reflected in the attached plans.
3. Acknowledged.
4. This change has been made and is reflected in the attached plans.
5. We will take the precautions described in your comments.
6. Given the maintenance practices of today's landscape companies and the quality of
the Arden development, these crabapple trees will most likely be heavily sheared and
shaped. Our landscape architect has advised us that most landscape trees never
reach their full size in a landscape situation, and that the final sizes of these plantings
will be suitable for the locations shown on the plan. We would therefore like to leave
this species selection as is.
Ms. Christine Barton~Holmes W
City of Carmel
Department of Community Services
January 9, 2006
Page 4
Q
City of Carmel. Fire Department
From Mr. Gary Hoyt, Fire Marshal
Letter Dated December 15, 2005
Comment Item
1.
Response
The structures will not be sprinkled.
2.
The structures will not have basements. The height at the peak of the roof is 38 feet.
3.
The project will not include an amenity building.
4.
The buildings will not be provided with a fire alarm system.
5.
Fire hydrant locations are shown the enclosed revised Sheet C2.1.
City of Carmel Police Department
From Mr. Michael Fogarty, Chief of Police
Letter Dated December 7, 2005
Comment Item
1.
Response
No response required.
Clav Township Reaional Waste District
From Ms. Jennifer Bruner
Letter Dated December 5, 2005
Comment Item Response
1. Not within CTRWD service area. No comments.
Panhandle Eastern Pipeline
From Ms. Teresa Magee
Letter Dated December 8, 2005
Comment Item
1.
Response
Had no comments.
Hamilton County Soil & Water Conservation District
From Mr. John South, PE
Letter Dated December 16,2005
Comment Item Response
1. Soil types and characteristics are acknowledged.
2. Correct - the only development in the floodplain is the entry road.
3. The Developer will evaluate the possibility of making pond #3 a dry detention basin.
However, we believe the pond is needed to provide the required detention for the
project.
4. Acknowledged.
5. The design will provide for post construction storm water quality treatment within the
proposed detention areas.
Ms. Christine Barton-Holmes U
City of Carmel
Department of Community Services
January 9, 2006
Page 5
u
6.
The Developer attempted to address this comment by making Buildings 15 and 16
front-loading, with green space in the middle instead of the alley. However, having
front-loaded units on Rosalind Place and Bard Lane results in driveways along these
main streets, which would disrupt the sidewalk and pedestrian circulation throughout
this area of the site. The front-loaded units also have rear porches which would
encroach into the middle green space and reduce its mitigating effect. As a result, the
Developer decided to leave the orientation of Buildings 15 and 16 as shown on the
submitted plan in order to maintain the aesthetics and pedestrian-friendly character of
the project.
Hamilton County Surveyor's Office
From Mr. Greg Hoyes
Letter Dated December 9, 2005
Comment Item
1.
Response
Acknowledged.
2.
Acknowledged.
3.
Acknowledged.
4.
The Developer will consider this request.
5.
Storm sewer design will be coordinated with the Hamilton County Surveyor's office
and the City of Carmel Engineering Department.
There will be no placement of fill material in the floodplain other than that required to
construct the entrance drive along the eastern portion of the site. The only additional
fill material that may be placed in the floodplain would be for the proposed multi-use
path along the north side of Smokey Row Road. We are awaiting direction from the
Carmel Engineer's Office on the details of this path and whether or not it is to be
constructed under this project.
6.
7.
Acknowledged.
8.
Acknowledged.
9.
Acknowledged.
10.
Acknowledged. It is our understanding that the project site falls within the limits of the
city of Carmel and does not drain to a County regulated drain. Per Gary Duncan of
the Carmel Engineer's Office, the city will have final approval authority for the
drainage design.
11.
Acknowledged.
Ms. Christine Barton-Holmes U
City of Carmel
Department of Community Services
January 9, 2006
Page 6
Q
We trust that the responses outlined herein adequately address the written comments of the various
reviewing agencies. Should you have any questions regarding this project or the information contained
herein, please do not hesitate to contact us.
Sincerely,
1lJT'lnc.
Rich~ ~ J. K I ,PE
Chie~ngin e
c: Buckingham Companies
Ryland Homes
All T AC agencies
Q:\Projectl_2005Projects\20052281Idocs\PennittinglD-AOLSIT ACResponse. DOC
-
orraiHDn
Date:
Place:
Time:
2:lIlI..a.m.
2.:.1JI..a.m.
CARMEL TECHNICAL ADVISORY COMMITTEE
AGENDA
.. "Five Star Court" is NOT an approved street name. Please submit a new list of
street names to Bill Akers at Carmel Communications before the subdivision is
recorded. Letter has been sent to Snelling Engineering (see attached PDF).
lili2ll..a.m.
Docket No. 05120017 TAC: Orchard Park Elementary School
The applicant seeks to construct 4 additional classrooms.
The site is located at 10404 Orchard Park Drive South. The site is zoned S2lResidence.
Filed by Karen Collins, PE, of Cripe Engineering for Carmel/Clay Schools.
December 21, 2005
Department of Community Services Conference Room
3rd Floor - Carmel City Hall
9:00 AM
.. Did not receive plans. Could not comment.
Carmel Science & Tech Park, blk 12, lot 5. Velocity Sports Performance
The applicant seeks use variance approval for an athletic training facility.
Docket No. 05120006 UV W Chapter 200.01 permitted uses
The site is located at 1402 Chase Ct. and is zoned M-3/Manufacutring.
Filed by Charlie Frankenberger of Nelson & Frankenberger for BP Spons, LLC.
No comments
c
University High School of Indiana
The applicant seeks special use amendment approval for a high school expansion.
Docket No. 05120007 SUA; ZO Chapter 5.02; Special Uses
The site is located at 2825 W 1161h St. and is zoned S-I/Residence.
Filed by Bill Wendling of Campbell, Kyle, Proffitt, LLP.
No comments
2.:2lL.a.m. Docket No. 05120012 DP/ADLS: Arden Townhomes
The applicant seeks approval for a 90-unit townhome development on 12.7 acres.
The site is located at 1940 E 136th St. and is zoned PUDlPlanned Unit Development.
Filed by Jim Shinaver of Nelson & Frankenberger for Buckingham Properties, Inc.
Changes to street names have been made per phone conversation with Rich Kelly, EMH&T. No
comments.
2.:li.a.m. Docket No. 05110020 01'/ ADLS: Old Meridian Place
The applicant seeks to create 129 town homes and a mix of office and retail uses on 25
acres.
The site is located at 12852 Old Meridian Street and is zoned OM/SFA.
Filed by Jon Isaacs for Centex Homes.
..No Street names noted on plans. If the town homes and retail arc to be addressed off of the
private drives, street names will still need to be approved. Please see to Bill Akers
at Carmel Communications to coordinate the street name approval process. Letter
has been sent to Ed Fleming at Stoeppelwerth. (see attached PO F)
2.:SS..a.m.
lIl:lIS...a.m.
c
Docket No. 05120015 TAC Schafer Powder Coating
The applicant seeks to create a 47,600 sq. ft. office warehouse on 3.45 acres.
The site is located at 4518 West 99th Street and is zoned IllIndustrial.
Filed by Greg Snelling of Snelling Engineering for Resons Condominiums International,
LLC.
..did not receive plans. Could not comment.
Docket No. 05120016 SP: Five Star Estates
The applicant seeks to plat 5 lots on 5 acres.
The site is located at 2200 W. 131st Street and is zoned SllResidential.
Filed by Greg Snelling of Snelling Engineering, LLC for Prime Lots, LLC.
u
D
t<<JS -2.:2.1$/01 )
City of Carmel
Via emall: iimsuvnf-Iaw.com
dleazenby@buckingham-co.com
Original by mail
December 19, 2005
Jim Shinaver
Nelson & Frankenberger
3105 East 98th Street, Suite 170
Indianapolis, IN 46280
RE: Arden Townhomes (05120012 DP/ADLS)
Dear Mr. Shinaver:
This letter is in response to your secondary plat application for Arden Townhomes. Comments
and concerns are as follow:
1. A connection is not provided for the townhomes on the east side of the project to
the proposed walkway on Smokey Row Road. Please add a connecting walkway.
2. There is no buffering or tree preservation shown on the north end of the project.
Please indicate if a fence or other buffering will be provided.
3. Twelve of the townhomes are shown to be surrounded by private streets and
alleys. Staff would prefer to see some mitigating green space for these units. This
may be accomplished by making the units front-loading, and providing green
space in the middle, rather than an alley.
Please wait to submit revised materials until after the Technical Advisory Committee (T AC) has
met on this application. The resubmitted materials should include edits addressing the above
comments along with any requirements that arise from the T AC meeting. Additional comments
may be made after the requested revisions have been submitted.
Sincerely,
Christine Barton-Holmes
Planning Administrator
OS llOO09SP Grandin Hall Section 2
Page 1
ONE CIVIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
u
u
Page 1 of 1
DeVore, Laura B
From: Griffin, Matt L
Sent: Monday, December 19, 200510:17 AM
To: DeVore, Laura B
Subject: FW: Arden Townhomes Pud
Print and file with Arden DP (tac cart)
From: Brewer, Scott I
Sent: Monday, December 12, 2005 1:24 AM
To: 'Kelly, Rich'; JimS@nf-law.com; 'ellndscp@aol.com'
Cc: Conn, Angelina V; Griffin, Matt L
Subject: Arden Townhomes Pud
Dear Rich:
These are my TAC comments for Arden Townhomes PUD landscape and tree preservation plans:
1. It appears there is no landscape buffer on the east side of the property, the existing woods that are to be
preserved on the east side and the path to be installed is actually on Carmel High School's property. This
does not meet the required buffer yard ordinance (Section 26.04).
2. I do not recommend using Washington hawthorns near paths, sidewalks and roadways. Please choose an
alternative species such as tri-color beech, yellowwood, American smoke tree or hornbeam.
3. There are 44 Imperial honey locust trees in the allee along Arden Place. Normally, those numbers are not
allowed for species diversity reasons. I will allow this for design purposes, but the maintenance will
increase because those numbers of the same trees will attract pest species.
4. There are 33 maples trees on the plan. Please choose an alternative for either the Pacific Sunset maples
or the 'Green Mountain' variety such as Kentucky coffee tree, London plane tree, Ginkgo, or sugarberry
tree.
5. On the outside of the private alleyways and near the buildings built near preserved trees, the roots should
be cut with a sharp blade such as a trencher before the tree preservation fence is installed. This will allow
the roots of existing trees to regenerate. If the roots are disturbed, compacted, or mangled by earthmoving
equipment, they will be injured and probably die back to the trunk, resulting in the possibility of die back
and wind throw.
6. Crabapple species (Malus) 'Coral bust', 'Camelot', and 'David' are 10', 8', and 15' wide respectively. These
short wide growing trees seem to be the wrong shape for long term maintenance between driveways and
in narrow areas adjacent to sidewalks. Please choose an alternative taller narrow growing species, such
as single stem river birch, 'Ivory Silk' tree lilacs, tri-color beech, hornbeam or hop hornbeam.
Please reply to these comments in writing and by amended plans. Please contact me if there are any questions.
Scott Brewer, City Forester
Environmental Planner, DOCS
City of Carmel,
One Civic Square
Carmel, IN 46032
PH: 317-571-2478
FAX: 317-571-2426
12/21/2005
Q
o
EL
JAMES BRAINARD, MAYOR
December 19, 2005
Mr. Rich Kelly, P.E.
EMH & T, Inc.
6994 Hillsdale Court
Indianapolis, IN 46250
RE: Arden Townhomes development plan/primary plat- Project Review #2
Dear Mr. Kelly:
We have reviewed your submission for the December 21, 2005 Technical Advisory Conunittee meeting.
We offer the following comments:
GENERAL INFORMATION '" , ,
1. The project site is lo~ated Within current City of ClII1TIe1 <::qiporate Limits.
2," ~~~~1~~~~2~,~f3~~~~t:~~~~"""'\"~'
3. BoardofPublicWorks:andSllfety.ApproviURequireme~ts::,~,,, "yq;:,;" , " ,
. WafcirllndSanitarySewer Availabi1itY.,~ ',>' ". :.: " ., :.:' ,
e Commercial Curb Cut. This Will he required for the entrance to the development on SmOkey
Row/136th Street. ' The request for Board approval should include 8 W' x II" exhibits that Will
'i indicate the proposed curb cuts and all appropriate data and dimensions includitJg width, radii, etc.
'Please indicate all existing and opposing driveways and their relationship to the 'proposed curb
cuts for this development
"',.m,..e-Temporary Construction Entrance. Separate BPWS approval will be required if this entrance is to
be lo'cated anywhere other thail the site of thepeIlIUl!lent~urb cut. "
" .' ConseJit to Encr6ach approvals 'fotany 'permanent unproveinent to be insbllled ivithin dediCated
easements and/or dedicated right of way. If an irriglltion system is planned' for ~s proJect,
additional Water Availability approval will be required from the Board and additional Water
Connection Fees will be due.
e Dedication of Right "fWay (if applicable). Preferred dedication forms are available electronically
from this office.
· Secondary Plat approval, if applicable. ,
e Open pavement cuts for utility installations or pavement cuts to facilitate entrance and curbing
installation. .. '," _ . , '
'I am eriClosing a schedule. for Boar4 of Public Works and Safety meeting dates and agenda deadlines
}forYoutuse.i;:Pl~a.se:use tl].lt:E~ginc;ermg:PfB~t:l.}.t4.~~4,lines for submissions to the Board.
':Any)ubmi$siojt.to~/te'B~~r.drequires prior final approval by the Carmel Clay Plan Comm~sion
r;andt{fr-'~ht 'JJ~ard oJ~(?1tinc.. ~pp~o# and completion of review by the Technical Advisory
~'i:o",ndttee. \"411.w'-!~en!.1!equests to 'be place on the Board's agenda must inclllde the appropriate
J)ocketNumbersoandthe,date(or; dates).o[.approvfll. by, the Plan Commission and/or BZA.
-4. ]TAC Revie~lI5ra~~gs s~bmihed 'for app~ovaJ.~;" ;',,!, ,,',';', ';j:~'I' 1: C'; ",;;';;;)
'We requ~stthat all comments and comment letters generated by this o~ce be,answered in writing and
beaCCOnipanied by a drawing reflecting requested revisions. Final drawings will not be approved for
construction until all issues have been resolved. All Carmel Utility issues must also re resolved. The
DEPARTMENT OF ENGINEERING
ONE CMC SQUARE, CARMEl, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439
EMAIL engineering@ci.carmel.in.us
.... .
.;
~
o
Q
design engineer must certify all drawings submitted for final approval. This office will require a
minimum of five-sets (maximum of seven-sets) of approved drawings after all issues have been
resolved The drawings will be stamped approved and signed by both the City Engineer and Director
Carmel Utilities. The Developer/Owner will receive one-set which is to be maintained on the
construction site at all times. Carmel Utilities will receive two-sets. Our Construction Manager will
receive one-set and one-set will be maintained in the Department of Engineering. Ifmore than the
minimum of five-sets are requested to be approved, the additional sets (maximum total of two
additional) must be submitted with the five required sets.
5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated
easements and/or right of way will require Consent to Encroach approval.
6. Carmel Utilities does not subscnbe to "Holey Moley" and should be contacted directly for all water
and sanitary sewer main locations.
7. Carmel Utilities will provide a separate review of this project for water and sanitary sewer issues.
8. I am including copies of the following with this correspondence:
. Commercial/Subdivision Project Approval Procedures.
. Performance Release Procedure
. Permit Data, Contacts, etc.
. Commercial Permitting Procedures.
. Dedication of Right of Way Documents
. Utility Fees
BONDING REOUlREMENTS
9. Upon initial review, it appears the following bonding requirements may apply to this project:
Performance GuaranteeslEngineer's Estimates
I. Interior Streets (if dedicated)
2. Interior Cwb & Gutters (if dedicated)
3. Right of Way Improvements (pavement, curbs, accel/decel/passing blister, sidewalks/paths)
4. Water Mains
5. Sanitary Sewers
6. Storm Sewers (if dedicated)
7. Monuments (if platted) & Markers (if dedicated streets)
8. Interior Sidewalks (if streets are dedicated)
9. Street Signs (if streets are dedicated)
Please provide a Certified Engineer's Estimate for 100% of the cost oflabor and materials for these
improvements. Please post Performance Guarantees, in the amount of the Engineer's Estimates, for
each improvement required. Upon completion and release of the Performance Guarantees, 3-year
Maintenance Guarantees will be required.
Street CutlRight of Way Permit and Bonding Requirements
Any work in the dedicated right of way ofSmokey Row Road/136th Street will require a Right of Way
Permit. If the work in the right of way is not included in a Performance Bond, a separate License and
Permit Bond will be required. the bond amount will be detennined by the number of instances of
w:ork in the right of way @ $2,000.00 per instance. Open pavement cuts in dedicated streets require
approval by our Board of Public Works and Safety. Please contact our Right of Way Manager, Fred
Glaser, to arrange permitting and bonding.
10. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations
submitted to this office for review. We will share Crossroad's comments as they are received.
When construction plans are submitted for review for this development, please provide I-set of
plans and calculations to this office and I-set of plans and drainage calculations to:
Mr. Greg Ilko, PE
Crossroad Engineers, PC
3417 South Sherman Drive
Beech Grove, IN 46107
u
Q
AVAILABILITY AND CONNECTION FEES
11. Availability (acreage) Fees must be paid after all other Engineering Department requirements
have been satisfied and prior to the start of construction activities. Availability Fees are based
upon total platted acreage or upon the total acreage as stated on a legal description of the property.
Current Availability (acreage) Fees are $l,01O.00/acre for water and $I,365.00/acre for sanitary
sewers.
Connection Fees - In order to calculate Connection Fees for this development, detailed usage
information is required. It appears that this is a townhome or condominium project. Please
provide this office with a detailed listing of buildings, units per building and bedrooms per unit.
Current Connection Fees are $1,310.00 per BOU for water and $795.00 per EDU for sanitary
sewer. I am enclosing Average User Factor Sheets for water and for sanitary sewers.
PROJECT COMMENTS-DEVELOPMENT PLANIPRIMARY PLAT
12. Detention will be required for this development.
13. Is there proposed filling of the floodplain of Cool Creek? The Department will expect the
development to conform to the recommendations of the Cool Creek Watershed Study which is
available on-line from the City's website.
14. Please contact Crossroad Engineers to obtain a drainage review checklist The Department will
expect the drainage system designed for this project to conform to the items outlined in the
checklist
15. Please provide monuments at external comers. These monuments should be shown on the plat
16. Please ensure that there are no common areas within the right-of-way.
17. Please ensure that other easements do not overlap with tree preservation easements.
18. Please label private streets. The Department assumes that the on-site streets will be private.
19. Any off-site easements must be secured prior to the Department of Engineering approving the
drawings. As we discussed, please resolve the issue related to the old railroad right-of-way
and the water service connection.
20. The Department assumes that all internal areas will be blanket IngresslEgress, Drainage and
Utility Easements.
21. Please confirm with the Fire Department that internal turning radii are adequate for their fire
trucks.
22. Please reduce the drive opening width of the entrance on the west side of the median from 23 feet
to a maximum of 18 feet
23. Please provide detention volume for the fully developed thoroughfare plan right-of-way for the
Smokey Row Road frontage. This requirement shall apply regardless. of watershed limits. Please
provide adequately sized pipes to carry water from the street to the proposed ponds.
24. Please provide an acceleration lane and deceleration lane per the configuration on the attached
sketch. Please provide a lane shift taper for the westbound through lane in accordance with the
Indiana MUTeD. Thank you for adding the entrance configuration requested by the
Department of Engineering and the Plan Commission. However, the Department of
Engineering needs additional information to confirm that the lane shifts and tapers satisfy
the MUTCD. Please schedule a meeting.
25. Thank you for indicating a 10-foot asphalt multi-use path along SmokeyRow Road. As we have
discussed, we will provide direction as to the final alignment of this path within the right-of-way.
26. Thank you for adding the note for the water and sanitary maw and laterals. Please incorporate
the Department's cover and backfill standard for all storm sewers that will be maintained by the
City or located within the right-of-way.
27. Any street cuts must be delineated on the plans for sawcut, removal, and replacement Please
include with the details, the Carmel standard street cut patch detail.
28. For the Construction Drawings, please confirm that the E:MH&T details for curb, sidewalk and
pavement meet of exceed the City Standard Details. If they do not, please include the City
Standard Details in the Construction Drawings and delineate as such on the Development Plan.
Q
Q
29. Please provide a Maintenance of Traffic Plan with the Construction Drawings.
30. Please remove Sheet Ll.O (Landscape Plan), Sheets Ll.l and L1.2 (Landscape Details), Sheet
SE1.0 (photometric Plan), and the last two sheets (the architectural details) from the construction
plans submitted for approval to the Department of Engineering.
31. The City has adopted a new paving policy. Please revise any notes, specifications, and details to
accommodate this policy. Please add the policy language to the specifications sheet.
32. Thank you for indicating the construction of the segment of the Cool Creek North Trail High
School extension.
33. Please revise Detail P A-3D to include the two-foot stone, 6 inches deep #53 shoulders on each
side of the trail for the trail to be constructed on the school property.
34. As we have discussed, Buckingham should resolve the deed overlap with the school property.
35. Construction plans shall indicate removal and replacement of the existing school fence to
accommodate the installation of the trail.
36. The City recommends that all private streets be constructed to City standards to facilitate future
dedication. These standards include:
a Sub-surface drain under the curbing on each side of the roadway meeting the
Department's standard detail.
a The plan should accommodate a future 50-foot right-of-way to include the street and any
sidewalks and the pavement width should be a minimum of 30 feet.
a The pavement face curb-to- face curb width should be 40-feet for parking 011 both sides
or 32-feet for parking on one side only.
a Please continue curb and gutter to the limits of the on-street parking spaces at
intersections.
a Locate any sanitary or storm manholes ( except inlets) and valve boxes outside of street
pavement, sidewalks or curbing and add a note to this effect.
a The sidewalk and curbing are installed to the Department's standard details.
a The pavement is installed with a normal crown with inlets on each side.
a Storm piping, Sanitary Sewer and Water Mains within what could be future right-of-way
conform with the City's cover and backfill standards.
These comments represent the Department of Engineering's initial review of the development plan/primary
plat of this project. We request that all responses to our comments be provided in writing. Failure to
provide written responses may result in the delay of the review process.
It is critical that our office be made aware of all modifications made on any plans being re-submitted,
particularly if any such changes are considered "new" or fall outside of our previous reviews. Please
provide revised plans including all revisions. Please notify us of any changes and specifically state any
changes, including changes resulting from Plan Commission, BZA or other committee meetings.
All bonds and performance guarantees must be posted prior to Engineering Department approval of
construction plans. Also, Board of Public Works and Safety approvals and any other governing agency
approvals (if required) must be obtained prior to Engineering Department approval.
The Department reserves the right to provide additional comments based on subsequent reviews and on the
grading and drainage system upon receipt of drainage calculations and more detailed construction drawings
that provide grading elevations, pipe sizing and invert elevations. The comments based on a more detailed
review of the drainage system may require changes to the Primary Plat
If you have questions, please call me at 571-2441.
u
Sincerely,
~~.~
Plan Review Coordinator
Department of Engineering
Enclosures
cc: Matt Griffin, Department of Community Services (w.o. encl.)
John Duffy, Carmel Utilities (w.o. encl.)
Paul Pace, Carmel Utilities (w.o. encl.)
Paul Arnone, Carmel Utilities (w.o. encl.)
Greg Ilko, Crossroads Engineers
Project File
Engineering Department Review
llApps2111ser dllllJlenglslutredlDHiIlIPROJREY05lARDENREV#2.doc
(.;)
Q
o
").005 I 't1.11 (.l 1)
Construction/Stormwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Project Name: Arden Townhomes Primary Plat
Plan Submittal Date: 12/01/05 Hydrologic Unit Code:
Project Location Description: North side of 136th on the east side of Cool Creek
Latitude and Longitude:
= C.!.~. Town~~-,-.: C!ay.. . ..__.._9~arter:. ..__. __, ~!~~on:, _.}9 Towns~p: 18N ~n~~~;".." o. 4E .
~ Project Owner Name: Buckingham Companies, AMO
e Contact: David Leazenby
C>
'a Address: 333 N. Pennsylvania Street 10th Floor
1; City: Indianapolis State: IN
.20 Phone: 317-974-1234 FAX: 317-974-1238 E-Mail:
~~=~::;=:;';;=~KH1'f~~::~:~%j~llli~illWl1k"if~l!i~illU~~if.~~~m8i(~~g;lllil\:5r!!;jj;];~brofr~\t.~lV~;\,)jjljJ:~;~'~~fllliJ~0~;~];1:?\jj!,~~].m:illffiE.~~~ill!~@
Affiliation: EMH&T
Address: 7400 ShadeIand Ave. Suite 150
City: Indianapolis
Phone: 317-913-6930
County:
Hamilton
Zip: 46204
FAX:
State: IN
317-913-6928
Zip: 46250
E-Mail:
Review Date: 12/16/05
~ Principal Plan Reviewer: John B. South P.E. CPESC
~ Agency: Hamilton County Soil and Water Conservation District
~
~ Address: 1108 South 9th Street
= City: Noblesville
a:: Phone: 317-773-2181
Assisted By:
FAX:
State: IN
317-776-1101
Zip: 46060
E-Mall: john-south@iaswcd.org
PLAN IS ADEQUATE: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NOL A copy of the NOI must also be sent to the Reviewing Authority (e.g. SWCD, DNR).
:~~~~~B~~1lL~~~f[h~~~_rrV~.~rwi~j~~ll~j~Q1~[illilifllijml*_!filii_~~~11llit!&~~~L~~t~~~{\~~lg~~;.n_~JE~~t1!~i~1~~Yt51~~~till~Jl~ili;gm!t~!11'~~ftlli~UE~~1N~[f=fiIT~:~~1[lli~~~~~~~1~1~~i~tIT;;~J;-ir~~iJj~go
o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day
review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and
revisions to the plan may be required at that time to address deficiencies.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOn: Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NOL A also be sent to the
o PLAN IS DEFICIENT: Significant deficiencies were identified during the plan review.
o Please refer to additional information included on the foUowing page(s).
o DO NOT me a Notice of Intent for this project
o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re-
submitted, and notification has been received that the miDimum requirements have been satisfied.
Plan Revisions
Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified
in the Plan Review Section above.
DNR, Division of Soil Conservation
Page 1 oft
Revised J 2/09/03, Form J
u
o
ConstrumonlStormwater Pollution Prevention Plan - Technical Review and Comment (Form 1)
Project Name: Arden Townhomes Primary Plat
Date Reviewed: 12/16/05
The technical review and comments are intended to evaluate the completeness of the Construction/Stormwater Pollution
Prevention Plan for the project. The Plan submitted was not reviewed for the adequacy of the engineering design. All
measures included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility
by a qualified individual with structural measures designed by a qualified engineer. The Plan has not been reviewed
-Or other local, state, or federal permits that may be required to proceed with this project. Additional information,
including design calculations may be requested to fUrther evaluate the Plan.
.4.11 proposed stormwater pollution prevention measures and those referenced in this review must meet the design criteria
and standards setforth in the "Indiana Stormwater Quality Manual" from the Indiana Department of Natural
[Resources, Division of Soil Conservation or similar Guidance Documents.
Please direct questions and/or comments regarding this plan review to:
JohnB. South P.E. CPESC
Please refer to the address and contact information identified in the Plan Review Section on page 1.
Assessment of Construction Plan Elements (Section A)
The Construction Plan Elements are adequately represented to complete a plan review:
o Yes 0 No
The items checked below are deficient and require submittal to meet the requirements of the rule.
A A
Index showing locations of required Plan Elements 1 II by 17 inch plat showing building lot
numbers/boundaries and road layout/names
o 4 Vicinity map showing project location
o 6 Location of all lots and proposed site
improvements (roads, utilities, structures, etc.)
O 8 Notation of any State or Federal water quality
permits
o 9 Specific points where storm water discharge will leave 0 10 Location and name of all wetlands, Iakes and
the site water comses on and adjacent to the site
o 11 Identification of potential discharges to ground
water (abandoned wens. sinkholes. etc.)
o 13 100 year f1oodpIains, f1oodways, and f100dway fringes 0 14 Pre-construction and post construction estimate of
Peak Discharge (10 Year storm event)
o 16 Locations and. approximate boundaries ofall
disturbed areas (Construction Limits)
O 18 Soils map including soil descriptions and
limitations
o 19 Locations, size and dimensions of proposed storm water 0 Plans for any off-site construction activities
systems (e.g. pipes, swales and channels) 20 associated with this project (sewer/water tie-ins)
o 11 Locations of proposed soil stockpiles and/or 0 22 Existing site topography at an interval appropriate
borrow/disposal areas to indicate drainage patterns
Proposed final topography at an interval appropriate to
23 . di draina
m cate ge patterns
Narrative descn'bing the nature and pUlpose of the
project
Legal Description of the Project Site
(Include Latitude and Longitude - NO! Requirement)
7 Hydrologic unit code (14 Digit)
o 11 Identification of all receiving waters
o 15 Adjacent Ianduse, including upstream watershed
o 17 Identification of existing vegetative cover
DNR, Division of Soil Conservation
Page 1 oft
Revised 12/09/03, Form 1
v
o
ConstructionlStormwater Pollution Prevention Plan - Technical Review and Comment (Form 1)
Project Name: Arden Townhomes Primary Plat
Date Reviewed: 12116/05
Assessment of Stormwater Pollution Prevention Plan (Sections B & C)
The construction component of the Stormwater Pollution Prevention Plan includes stormwater quality
measures to address erosion, sedimentation, and other pollutants associated with land disturbance and
construction activities. Proper implementation of the plan and inspections of the construction site are
necessary to minimize the discharge of pollutants. The Project Site Owner should be aware that
unforeseen construction activities and weather conditions may affect the performance of a practice or the
effectiveness of the plan. The plan must be a flexible document, with provisions to modify or substitute
B ractices as necessary.
Description of potential pollutant sources associated with construction activities
Sequence descn"bing stormwater quality measure implementation relative to land disturbing
activities
Stable construction entrance locations and specifications (at all points of ingress and egress)
Sediment control measures for sheet fiow areas
Sediment control measures for concentrated fiow areas
Storm sewer inlet protection measure locations and specifications
Runoff control measures (e.g. diversions, rock check dams, slope drains, etc.)
Storm water outlet protection specifications
Grade stabilization structure locations and specifications
10 Location, dimensions, specifications, and construction details of each stormwater quaUty measure
11 Temporary surface stabilization methods appropriate for each season (include sequencing)
11 Permanent surface stabllization specifications (include sequencing)
13 Material handUng and spill prevention plan
14 Monitoring and maintenance guidelines for each proposed stormwater quaUty measure
D D 15 Erosion & sediment control specifications for individual building lots
The post construction component of the Stormwater Pollution Prevention Plan includes the
implementation of stormwater quality measures to address pollutants that will be associated with the
nallanduse. Post construction stormwater quality measures should be functional upon completion of
the project. Long term fUnctionality of the measures are critical to their performance and should be
C monitored and maintained.
Description of pollutants and their sources associated with the proposed land use
Sequence describing stormwater quality measure implementation
Description of proposed post construction stormwater quality measures
(Include a written description of how these measures will reduce discharge of expected pollutants)
Location, dimensions, specifications, and construction details of each stormwater quality measure
Description of maintenance guideUnes for post construction stormwater quality measures
DNR, Division of Soil Conservation
Page 1 of1
Revised J 2/09/03, Fonn J
u
o
ConstructionlStonnwater Pollution Prevention Plan - Technical Review and Comment
iProject Name: Arden Townhomes Primary Plat
Date Reviewed: 12/16/05
The following are natural resource comments or concerns in regard to this project:
The Oakley and Fox terrace soils are well drained with sand and gravel 3'-4' below the surface. Stonnwater basins should
be constructed as dry ponds to prevent future failures of installed liners and large costs to the homeowners to fix a
problem. Exposed sands and gravels will need to be covered with adequate soil for good plant growth. The Sleeth loam
has seasonal high water table, high potential frost action, moderate permeability in the subsoil and rapid permeability in
the substratum. The Genesee and Shoals soils are flood plain soils and will remain largely undisturbed except for pond
#3. This pond will require a liner or the water level will fluctuate with the water table.
The development plan appropriately keeps most of the improvements out of the flood plain.
Pond #3 is not recommended. The pond will need to be lined to maintain a static permanent pool level. Liners can fail
and impose a significant financial burden on the homeowners. When flooding occurs the pond will also collect debris and
sediment from the flood waters. This will significantly shorten its useful life span and incur higher costs for maintenance.
I don't believe the future homeowners should be burdened with these future obligations that substantially exceed those of
similar developments.
A 30 feet wide riparian easement is recommended along Cool Creek.
The project will need to consider the new ordinances for post construction water quality.
Hard surface could be minimi7.ed by having only one street providing access to the townhomes. Many of these homes
have streets on the front and the back.
cc: Carmel, Surveyor, File
DNR. Division of Soil Conservation
Page 1 ofl
Revised 12/09/03
u
u
December 15, 2005
Mr. Richard Kelly
EMH&T, Inc.
6994 Hillsdale Court
Indianapolis; IN' 46250
Re: Arden Townhomes
Technical Advisory Committee
En2ineerin2 Review Checklist for Development Draina2e Desips
Dear Mr. Kelly:
Insufficient information has been submitted to perform a complete drainage review. Included herein is the
"Engineering Review Checklist for Development Drainage Designs" that details the City of Carmel's drainage
requirements. Please use this in generating yourdrainage submittal. Pfease revise the plans in accordance
with the comments below. .
1. Please review the "Pipe Sizing Calculations" section of this checklist. Please provide the information
as a part of the drainage calculations as necessary for this project in accordance with these
requirements.
2. Please review the "Construction Plan" and "Storm Profiles" sections of this checklist. Please
include the required information in the construction plans for this project in accordance with these
. . requirements: ..~.: .... . .... .
..3. Please provide structure numbers and structure data notes for the drainage structures in the plans.
;;. "4;: : The contour elevations for all ponds are not marked on the construction plans. Please show the
(+;'<;;"contoUre'&va,tions, and provide spot elevations and typical cross-sections for each pond to show
adequate freeboard for each pond. The minimum freeboard shall be two feet above the 1 OO-year
critical flood elevation.
Please iDclude witbY01ir.submittal, one (1) copy of the comments indicating the action taken or a written
explanation for action not taken. Construction plans and drainage calculations are not to be re-submitted
without implementing changes with respect to any and all review comments from the City of Carmehand the
/'
Hamilton County Surveyor's Office. The comments and plans may be submitted to my atteJition.at".the~:. .
following address: ,I // '
/;. .'
CrossRoad Engineers, P.C. I ( ". .:-(Y.::. .
"417 S th S' on I I \~'S.;. _/...- .
:J.' au . nerman ve. t."...., <,'
Beech Qrove;IN46107 \, ",,"' ~ " *.tJ'J.. ) . "J
::::~t me at (317) 780-1555 ext. 12 wilh any quemo... \,':::..~
: ".;. ';r,;;-: '.
'.r" f".-'.:
il:....'
", ~-. "
. ;.' ~ ;-' .
. )':,-, ~"_l:';:. '..~: !_ ", ~,; .
. 1....'...._ . .... - : ::. ~
-"'0-- ',"._.'.', :....
. . " - .~ : .... . :'.~
. ..... ~ : . ~ -.. ..
..... .-".' .;:: . ", '; ~:..:.:,', ~;".i'~ '.-~:,,:';;';';' '. . ..:/ :l~_;:: .....,
, ,.~ " '. :'..... .' - '-f ..
. '.. . '. ,~.." .. t, ...' ; ....
copy: GaryDuric8il, City of Carmel Assistant Engineer
Greg Hoyes, Hamilton County Surveyors Office
-~-= 3417 Soul:h Sherman Dr. . Beech&ro"e, IN4&1D7 . Te.1 317-7BOU555 . Fax 317-7BO-&5i!5 "~=~==~
Dee 15 2005 2:11PM
~LASERJET 3200
u
p.2
'~,. . . .
City of Carmel
Fire Department Headquarters
2 CIVIC SQUARE
CARMEL, INDIANA 46032
Voice (317) 571-2600 Fax (317) 571-2615
Fire Prevention Bureau
Richard J. Kelly, PE
EMH&T
6994 Hillsdale Court
indianapolis, IN 46250
RE: Arden PUD
LETTER OF APPROVAL
The undersigned has reviewed the proposed plans for
Arden PUD
and has approved the plans subject to the following:
1. WiD the structures be sprlnklered? If so a meeting will need to be scheduled to discuss the
locaUon(s) of 1he fire department connect/on(s) and an additional fire hydrant We will also
request an exterior entrance to the fire sprinkler riser room (s). We also will request 1he purchase
of Knox Foe caps for the sprinkler siamese(s).
2. What are the heights of the buildings and WIll the buildings have a basement?
3. Will this project include an amenity building? If so our office Is requesting the inslaDatlon of a
Knox box for emergency access. Knox products can be purchased on line at www.knoxbox.com
4. Will the buildings be provided with a fire alarm system?
5. Our. office is also requesting a set of water distribution plans showing fire hydrant locations.
6.
Please respond to the above noted condiUon(s) In writing and submit to our office prior to the
scheduled Technical Advisory Meeting for this project
Date: December 15. 2005
By: Gary Hoyt, Fire Marshal
Carmel Fire Deparbnent
01.
u
NELSON
&
FRANKENBERGER
A PROFESSIONAL CORPORATION
ATTORNEYS AT LAW
JAMES J. NELSON
CHARLESD.FRANKENBERGER
JAMES E. SHINA VER
LARRY J. KEMPER
JOHN B. FLATT
FREDERIC LAWRENCE
OF COUNSEL
JANE B. MERRILL
3105 EAST 98TH STREET
SUITE 170
INDIANAPOLIS, INDIANA 46280
317-844-0106
FAX: 317-846-8782
December 12, 2005
Matt Griffin
City of Carmel
Department of Community Services
mgriffin@carmel.in.gov
RE: Arden Townhomes - ADLS/DP Approval
TAC Meeting Scheduled for 12/21/05
Dear Matt:
Attached to this e-mail message, you will find copies of the T AC transmittal letters sent
by Rick Kelly of EMH & T Engineering to the various T AC agencies. Please be sure that his
matter is placed on the T AC agenda for its December 21 st meeting. Please also send me a copy
of the agenda when it is prepared.
Thank you for your assistance in this regard. Please contact me with any questions.
Very truly yours,
NELSON & FRANKENBERGER, P.e.
James E. Shinaver
JES/bd
Enclosure
CC: David Leazenby, dleazenby@buckingham-co.com w/o encl.
Sara Nasuti, sara@buckingham-co.com w/o encl.
Rich Kelly, rkelly@emht.com w/o encl.
H:\brad\buckingham\arden\griffin Itr 111705.doc
u
t.cu-Qu 1(./1)
Page 1 of2
Rigney, Lynn
From: Kelly, Rich
Sent: Monday, December 12, 2005 8:13 AM
To: Rigney, Lynn; 'David Leazenby'
Cc: 'Sara Nasuti'
Subject: FW: Arden Townhomes Pud
All,
Below are Scott Brewers comments for Arden.
Lynn - please file with other T AC letters as received.
Rich
From: Brewer, Scott I [mailto:SBrewer@carmel.in.gov]
Sent: Monday, December 12, 2005 1:24 AM
To: Kelly, Rich; JimS@nf-law.comi e1lndscp@aol.com
Cc: Conn, Angelina Vi Griffin, Matt L
SUbject: Arden Townhomes Pud
Dear Rich:
These are my TAC comments for Arden Townhomes PUD landscape and tree preservation plans:
1. It appears there is no landscape buffer on the east side of the property, the existing woods that are to be
preserved on the east side and the path to be installed is actually on Carmel High School's property. This
does not meet the required buffer yard ordinance (Section 26.04).
2. I do not recommend using Washington hawthorns near paths, sidewalks and roadways. Please choose an
alternative species such as tri-color beech, yellowwood, American smoke tree or hornbeam.
3. There are 44 Imperial honey locust trees in the allee along Arden Place. Normally, those numbers are not
allowed for species diversity reasons. I will allow this for design purposes, but the maintenance will
increase because those numbers of the same trees will attract pest species.
4. There are 33 maples trees on the plan. Please choose an alternative for either the Pacific Sunset maples
or the 'Green Mountain' variety such as Kentucky coffee tree, London plane tree, Ginkgo, or sugarberry
tree.
5. On the outside of the private alleyways and near the buildings built near preserved trees, the roots should
be cut with a sharp blade such as a trencher before the tree preservation fence is installed. This will allow
the roots of existing trees to regenerate. If the roots are disturbed, compacted, or mangled by earthmoving
equipment, they will be injured and probably die back to the trunk, resulting in the possibility of die back
and wind throw.
6. Crabapple species (Malus) 'Coralbust', 'Camelot', and 'David' are 10', 8', and 15' wide respectively. These
short wide growing trees seem to be the wrong shape for long term maintenance between driveways and
in narrow areas adjacent to sidewalks. Please choose an alternative taller narrow growing species, such
as single stem river birch, 'Ivory Silk' tree lilacs, tri-color beech, hornbeam or hop hornbeam.
Please reply to these comments in writing and by amended plans. Please contact me if there are any questions.
Scott Brewer, City Forester
Environmental Planner, DOCS
12/12/2005
City of Carmel,
One Civic Square
Carmel, IN 46032
PH: 317-571~2478
FAX: 317-571-2426
12/12/2005
u
u
Page 2 of2
/- ~
12/09/2005 10:18 317776\..1
HAMILTON CO VR ).OO$.'2.~11 Lli) PAGE 02/03
J(enton C. 'Word, Slfnlt}'oT
t'E'fitmr (J17.) 77';"'~4~S
'Tn,r (JI7) ii~G).$
S"/Ie h($
Om: .1Iomlllnn eel/III'" Sqllon:
.:Nobksllille. Illf{innll 4606o..1.1~~O
December 9, 2005
EMIl & T Inc.
ATTN: Rioh Kelly
6994 Hi11sda1e Court
Indianapolis, IN 46250
VIA FACSIMILE: 913-6928
Re: ArdeD Townhomes
Dear Mr. Kelly:
We have reviewed the primary plat submitted to the Hamilton County Svrveyor's Office on
December 1, 2005 for this project and have the following comments:
1. The proposed project falls in the inCOIpOIated limits of the City ofCBID1el
2. The proposed project DOES fall in a Carmel Wellhead Proteetion Zone.
3. This proposed project does not fall in a regulated drain watershed.
4. Do to up-stream drainage problems on Little Cool Creek and Cool Creek being a
regulated drain upstream, the Hamllton County Surveyor's Office would ask that
a petition to make Cool Creek a regulated drain across this project be executed.
This would allow us to maintain the drain and keep the tlow moving though the
creek. We will grant reduction of the statutory regulated dmin easement and
support encroachments that are part of this proposed project.
5. Please coordinate the storm system design with both the Hamilton County
Surveyor's Office and the City of Carmel Engineering Department.
6. The Cool Creek Watershed Management PlBDt that was ajoint study done by
HCSO, City of Camtel, and the Town of Westfield, recommends against ANY
12/89/2885 18:18 317776~
HAMILTON CO VR
PAGE 83/1213
Joss of floodplain for Cool Creek. Will any floodplain volume be lost to this
development? If so, compensatory storage wUI be strongly recommended.
7. The Watershed Management Plan also recommends that any debris or flowline
abstraction need to be removed. HCSO would recommend that a general stream
cleanup be considered with this project. This cleanup should involve debris,
flowline obstructions, and any possible obstmction in the floodplain (dead/dying
trees and any deadfall on the ground).
8. The HCSa would also recommend that any major erosion area be looked at and
repaired. The management plan shows areas ofminor and major erosion just
downstream oftbis site and this area should be looked at also.
9. A copy of the approved IDNR Construetion in a Floodway Pennit should be
submitted to HCSO, O~ received.
10. Although the HamUton County Surveyor's Office has reviewed this primary plat
and issued a comment letter. this office will not be limited by the primary plat in
regards to the pond sizes or katicm. drainage easement widths, storm sewer
locations. lot layout. landscape layout, or any other drainage related i881le8.
1nsufticJeot iDfounation is presented to conduct a complete drainage review and
changes may be required during the construction pluming stage.
11. Please note that fiJrtber comments may be necessary at a later date.
Should you have any questions, I can be reached at 317-776-8495.
Sincerely,
cc: Matt Griffin - Carmel DOCD
10hn South - HCSWCD
Dick Hill- Carmel Engineering
Mike McBride - HCHD
<hi Dko - Crossroads Engineering
Buckingham - David Lcazenby
u
u
City of CarmeR
Carn1l.eR Police DeJIDartn1l.,ent
;) Cic\'ic Sguare
Carllllel, Indiana -46032
December 7, 2005
Richard J. Kelly, PE
EMH&T
6994 Hillsdale Court
Indianapolis, IN 46250
RE: Arden
Job no.: 2005-2281
Dear Mr. Kelly:
I have received and reviewed the plans submitted for the above-mentioned
project.
At the present time, I see nothing in the plans that would hamper law en-
forcement efforts.
If we can be of any further assistance to you, please contact us.
Respectfully,
Jt~'~.c{~~
Michael D. Fogarty
Chief of Police
MDF:vb
cc: Dept. of Community Services
.........{
"i(j
(317) 571-2SDO
A Nationally Accredited Law Enforcement Agency
f'ax(317) G71-2S12
DEC. 5. 2005 9: 49AM
Q
u
NO. 8945 P. 1/1
E M H& T
Evans. Mechwart. Hambleton & nlton, Inc.
l!nglneers. S\XVeYOIS. Plennell. Sr;ieniiSlS
CTRWD
~G:U
DEe 1 zoos
Letter of Transmittal
rh i$, Is
Nor
From: Mr. Rich Kelly
Date: December 1, 2005
Job no.: 2005-2281 ~ Il)
Re: Arden
/}/IAJ(" Se('v(~.f Arftl.. Jmnikr '8rU-t"eY
CTre. w~
o Courier Du.s. Mall 0 Fed. Ex. 0 UPS
D originals D [other]
o copies
To:
Ms. Jennifer Bruner
Clay Township Regional Waste District
10701 N. College Ave.
Indianapolis, IN 46280-1098
We are sending you herowith via:
The following items:
at
Copies Date Number of DesGription
sheets
1 11-16-05 Development Plan I Prlmaty Plat - Plan Sheets Cl.O & C2.0
.
.
These are transmitted as checked below:
Droupproval Dfor your file Glas required Oror review & coJDJUCDt
Dforexecution/ signatures o [other]
Remarks::
The above referenced project is scheduled for the Carmel TAC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
Copies To: Mr. lim Shinaver, Nelson & Frankenberger
EMH&T File
Signed:
-o\v
Richard 1. Kelly, PE
Branch Manager
"enalosutes ere not as noted, kindly notify us at once.
MCMXXVI
69'14 HiJlsdOle Covtl.lndionopo!is, IN 462S0. Phone 317.913.6930. Fax317.913.6~
0:>Umb1r'~. ~'CI\<llICl\I"
emtJl.com
------
~
u
(j
OS t 200 L2-.DPkillL S
Construction/Stormwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Project Name: Arden Townhomes Primary Plat
Plan Submittal Date: 12/01/05 Hydrologic Unit Code:
Project Location Description: North side of 136th on the east side of Cool Creek
Latitude and Longitude:
Civil
County:
Hamilton
=
Q
:; Project Owner Name: Buckingham Companies, AMO
E Contact: David Leazenby
Q.
~ Address: 333 N. Pennsylvania Street 10th Floor
...
t: City: Indianapolis State: IN
.~ Phone: 317-974-1234 FAX: 317-974-1238
Q
100
~ Plan Preparer Name: Richard Kelly
Affiliation: EMH&T
Address: 7400 Shadeland Ave. Suite 150
City: Indianapolis
Phone: 317 -913-6930
19
18N
Zip: 46204
E-Mail:
FAX:
State: IN
317-913-6928
Zip: 46250
E-Mail:
Review Date: 12/16/05
~ Principal Plan Reviewer: John B. South P.E. CPESC
.~ Agency: Hamilton County Soil and Water Conservation District
~
~ Address: 1108 South 9th Street
; City: Noblesville
s::: Phone: 317-773-2181
Assisted By:
FAX:
State: IN
317-776-1101
Zip: 46060
E-Mail: john-south@iaswcd.org
PLAN IS ADEQUATE: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional information included on the following page(s).
D Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO/. A NOI must also be sent to the
D A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day
review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and
revisions to the plan may be required at that time to address deficiencies.
o Please refer to additional information included on the following page(s).
D Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO/. A NOI must also be sent to the
o PLAN IS DEFICIENT: Significant deficiencies were identified during the plan review.
o Please refer to additional information included on the following page(s).
D DO NOT file a Notice of Intent for this project.
o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re-
submitted, and notification has been received that the minimum requirements have been satisfied.
Plan Revisions
Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified
in the Plan Review Section above.
DNR, Division of Soil Conservation
Page 1 of 1
Revised 12/09/03, Form 1
Dee-OB-20DS 03:04pm From-
u
u
T-S27 P.DDI/DOI F-B68
11111 Panhandfe Eastern Pipeline Co.
has no company Facilities
Evans, Mec:hwott, Hambleton & Tilton, Inc. involved in this project
~neeI$. SurvS)'ClfS. PIonnen. $c:Ienlbts ~ 1.~-,jgl05
I 191'led I Diie
I
Letter of Tr I1sm ittal
To: Ms. Teresa Ma I or Mr. Mark Wood
p$JnhSlnilTe East qn Pipeline
9371 Zionsville
Indi:m:l\P01is. 46268
H1T
From: Mr. Rich Kelly
Date: December I, 200S
Job no.: 2005-2281 l \ l'l
Re: Arden
We are sending yo !herewith via:
D Cowier
o copies
o U.S. Mail 0 Fed. Ex. 0 UPS
o originals 0 [other]
The following item :
Copies
Date
Number of
sheets
Description
1
11-16-05
Development Plan / Primary Plat - Plan Sheets Cl.0 8r. C2.0
These are transmit ;d as checked below:
Dfor approval pror your tile GJas required 0 for review & comment
Dforexecutionl si o [Olher]
Remaa1cs:
Thank you.
~roject is scheduled for the Cannel TAC meeting on December 21,
FY review comments to my attention via fax or mail. .
I
r
Mr. 1 ShinaVet, Nelson & Frankenberger
EMH& I File
Copies To:
Signed:
JD.,\.'-
Richard J. Kelly, PE
Branch Manager
If ~UTN CilO not aB noted, kindl)' fIOtify UlS r.d onc;e.
M C M II l\ V I
69 Iiillsclale Coun. Indanopolis,lN 462.50. Phone 317.911.6930 . Fax 317.'13.6928
c_. 0ncMcnI. ~. CtI<odDIIe
emht.com
u
u
EIMIH'fT
Evans, Mechwart, Hambleton & Tlton. Inc.
engineers. Surveyors, PIamers. Sdentlsts
Letter of Transmittal
To: Mr. Bill Akers
Carmel Clay Communications
31 First Ave. NW
Carmel, IN 46032
From: Mr. Rich KC11y
Date: December 1,2005
Job no.: 2005-2281
Re: Arden
We are sending you herewith via:
o Courier Ii] U.S. Mail 0 Fed. Ex. 0 UPS
The following Items:
[i] copies
DorigiDala 0 [other]
Copies Date Number of Description
sheets
1 11-16-OS Development Plan I Primary Plat - Plan Sheets Cl.0 & C2.0
These are transmitted as checked below:
Dfar approval Dear YOW' file liJas required 0 for review & comment
Dforexecutionl signatW'es o [other]
Remarks:
The 'above referenced project is scheduled for the Cannel TAC meeting on December 21,
2005. Please forward any revie.w comments to my attention via fax or mail,
Thank you.
Copies To: Mr. Jim Shinaver, Nelson & Frankenberger
EMH&T File
Signed:
If enclosures 61'8 not as nded, klndty notify us at onc9.
MCMXXVI
6994 H11lsdole Court. Indlcnopols. IN ~~ . Phone 317.913.6930 . I'<llC 317.913.6928
CcUnbut. 0drGlI. -..-. ~
emht.com
u
(j
EfMHsT
Evans. Mechwart. Hambleton & mon.lnc.
EngIneers. Surveyors, Plannel1. Sdenlfsts
Letter of Transmittal
To: Mr. Scott Brewer
Dept. of Community Services
One Civic Square
Carmel, IN 46032
From: Mr. Rich Kelly
Date: December 1, 200S
Job no.: 2005-2281
Re: Arden
We afe sending you herewith via:
[XJ Courier 0 U.S. Mail 0 Fed. Ex. 0 UPS
[Xl copies Dorigina1a 0 [other]
. The following items:
Copies Date Number of Description
sheets
1 11-16-05 9 Development Plan I Primary Plat
,"
These are transmitted 88 checked below:
Dforapproval Dforyourfile Glasrequired Dforreview&comment
Dror execution I signatures 0 [other]
RenwIcs:
The above referenced project is scheduled for the Carmel T AC meeting on December 2 I,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
Cq)Ies To: Mr. Jim Shinaver, Nelson & Fraokenberger
EMH&T File
Signed:
fJ
" 6Ilc/osll/'8S 818 not as noted, kindly notify lIB 81 once,
MCMXXVI
6994 H1l1sdole Court.lndllJllClPCllb.IN <16250. Phone 317.913.6930 . Fax 317.913.6?28
Cclt..mbus. ~. ~ . Challolla
emhl.com
u
u
I I
EIMIH,~T
Evans. Mechwart. Hambleton & moo. Inc.
E:ngIneers. SU'leycn. Plonnel'$. ScIentIsts
Letter of Transmittal
To: Mr. John Duffy
Carmel City Utilities
760 Third Ave. SW
Carmel. IN 46032
From: Mr. Rich Kelly
Date: December I, 2005
Job no.: 2005-2281
Re: Arden
We are sending you herewith via:
o Courier Ii] U.S. Mail 0 Fed. Ex. 0 UPS
The following Items:
[Xl copies
o originals D [other]
Copies Date Number of Description
sheets
1 11-16-05 9 Development Plan I Primary Plat
These are transmitted 88 checked below:
Dfor approval o for your file @as required 0 for review & comment
Dfar execution I signatures 0 [other]
R18mark&:
The above referenced project is scheduled for the Carmel T AC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger
EMH&T File
Signed:
If encJosutaS Bit not 88 noted, IdndJy notify III III once.
MCMXXVI
6994 HIlIsdale court. Indlonopolls. IN 46250 . Phone 317.913.6930 · fax 317.913.6928
c:oMnbuI.~. ~. ChafIoIte
emht.com
u
u
II
I
M:HL~T
Evans. Mechwart, Hambleton & lUton, Inc.
Englneets. Sl.IVeyors. Planners. ScIentists
Letter of Transmittal
To: Chief Michael Fogarty
Carmel Police Department
Three Civic Square
Cannel, IN 46032
From: Mr. Rich Kelly
Date: December It 200S
Job no.: 2005-2281
Re: Arden
The fallowing Items:
Ii] Courier 0 U.S. Mail 0 Fed. Ex. 0 UPS
[Xl copies D originals 0 [other]
We are sending you herewith via:
Copl.. Date Number of Description
sheets
1 11-16-05 Development Plan I Primary Plat - Plan Sheets Cl.O & C2.0
Tbese are transmitted as checked below:
Dfor approval o far your file
o for execution I signatures
Remarks:
liJas required D for review & comment
D[other]
The above referenced project is scheduled for the Carmel T AC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail. .
Thank you.
CopIes To: Mr. Jim Sbinaver, Nelson & Frankenberger
EMH&T File
Signed:
If encIOSU18S 818 not as noted, kindly notify us at once.
MCMKXVI
6994 HIUsdole court. indianapolis. IN 462S0. Phone 317.913.6930 . I'GlC 317.'13.6928
~'CR*IIXIlI'~'~
emht.com
u
u
E M H'rT
Evans. Mechwart. Hambleton & lUton. Inc.
EngIneers. Sulveyon. PIannen. Sclentlsts
Letter of Transmittal
To: Mr. Gary Hoyt
Office of Fire Chie( Station #1
Two Civic Square
Cannel, IN 46032
From: Mr. Rich Kelly
Date: December 1,2005
Job no.: 2005-2281
Re: Alden
The following Itema:
[i] Courier 0 U.S. Mail 0 Fed. Ex. 0 UPS
Ii] copies DorigiDa1s 0 [other]
We are sending you herewith via:
Copies Date Number of Description
sheets
1 11-16-05 Development Plan I Primary Plat - Plan Sheets C1.0 & C2.0
1 Turning Radius Exhibit
Theae are transmitted as checked below:
Dfor approval Dfor your file GJ as required D for review & comment
o for execution I signatures o [other]
RerrBIca;
The above referenced project is scheduled for the Cannel TAC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger
EMH&T File
Signed:
If encIosUl8$ IlI8 not as noted, IdndJy notify /If sf once.
MCMXXVI
6"4 H11lSda1e Courl.lndlo1apolls.IN 46250. Phone 317.913.6930. Fox317.913.6928
CoUnIlla' QIc:hlaI. ___. ~
emht.com
u
u
EIMiH<~T
Evans. Mechwart. Hambleton & lUtan. Inc.
Engineers. Surveyon. Plannel$, Sclenllsts
Letter of Transmittal
To: Mr. Tun Blanchard
Assistant Building Commissioner
One Civic Square
Carmel, IN 46032
From: Mr. Rich Kelly
Date: December 1. 200S
Job no.: 2ooS-2281
Re: Arden
We are .endlng you herewith via:
[X] Courier DU.S.Mail o Fed. Ex. o UPS
The following Items:
Ii.] copies
Oorigina1s 0 [other]
Copies Date Number of Description
sheets
1 11-16~S 9 Development Plan I Primary Plat
"
These are transmitted as checked below:
o for approval Oror your file lil as required Dfor .review & comment
o for execution I signatures 0 [other]
Remarks:
The above referenced project is scheduled for the Cannel T AC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
CcpIes To: Mr. Jim Shinaver, Nelson & Frankenberger
EMH&T File
Signed:
IJ
If encIosut8s 8/8 not as noted, kindly nollfy lIB at once.
MCMXXVI
69'14 HlllSc:lale Court. Indianapolis. IN 462SO . Phone 317.913.6930 · Fax 317.913.6928
CaII..rr&M. CInc:hd. ~ . CtDto8e
emht.com
u
u
ElM H<yT
Evans. Mechwart. Hambleton & lUton,lnc.
Engineell. Su/VeyOl$. PIonne!1, Sc:Ienflsts
Letter of Transmittal
To:
Mr. Gary Duncan! Mr. Nick Redden
Carmel Engineering
One Civic Square
Carmel, IN 46032
From:
Date:
Job no.:
Re:
Mr. Rich Kelly
December I, 2005
2005-2281
Arden
We are sending you herewith via:
GJ Courier D u.s. Mail D Fed. Ex. 0 UPS
The following Items:
[X] copies
D origjDals 0 [other]
Copies Date Number of Description
sheets
1 11-16-05 9 Development Plan I Primary Plat
1 11-29-05 Initial Drainage Report
1 Turning Radius Exhibit
These are transmiUed as checked below:
Dforapproval Dforyourfile Iilas required Dforreview & comment
Oror execution I signatures 0 [other]
RerrBkB:
The above referenced project is scheduled for the Carmel TAC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger
EMH&T File
Signed:
IJ
If encIosur8S 1118 not BS noted, kindly notify us at once.
MCMXXVI
6994 HlIIsdaJe Court. indIanapolis. IN 46250. Phone 317.913.6930 . Fax 317.913.6928
CdMllI:M. QlcftIatI. ..........,.., . ~
emht.com
u
u
i I
EiM HefT
Evans, Mechwart, Hambleton & TUtor\, Inc.
Enl#neers. Surveyors. Planners. Sclentlsls
Letter of Transmittal
To: Mr. MarkWcstenneier
Cannel Clay Parks Department
760 Third Ave. SW, Suite 100
Carmel, IN 46032
From: Mr. Rich Kelly
Date: December I, 200S
Job no.: 2005-2281
Re: Arden
We are sending you herewith via:
The following Items:
o Courier [i] U.S. Mail 0 Fed. Ex. 0 UPS
Iil copies 0 originals 0 [othc:a-]
Copl.. Date Number of DeacrlpUon
sheets
1 1l-1~S Development Plan I Primary Plat - Plan Sheets Cl.O & C2.0
Theae are transmitted as checked below:
o for approval Ofor your file liIas required 0 for review & comment
o for execution I signatures 0 [other]
RIrnIItat;
The above referenced project is scheduled for the Carmel TAC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger
BMH&T File
Signed:
If encIosut8s BIe not as noted, kindly notify us 81 OIIC&
MCMXXVI
6994 H1lIsdale coun.lndlanapols, IN 46250 . Phone 317.913.6930. Fax317.913.6928
~'<:n:maII'~'~
emhl.com
u
w
HtT
Evans. Mechwart. Hambleton & TIlton, Inc.
EnglneelS, surveyors. Plannltl'S. ScIentists
Letter of Transmittal
To: Mr. Mike McBride
Hamilton County Highway Dept.
1700 S. 10th St.
Noblesville. IN 46060
From: Mr. Rich Kelly
Date: December 1. 2005
Job no.: 2005-2281
Re: Arden
We are sending you herewith via:
The following items:
o Courier lil U.S. Mail 0 Fed. Ex. 0 UPS
[;] copies DoriSmats 0 [other]
Copies Date Number of Description
sheets
1 11-16-05 Development Plan I Primary Plat-
Plan Sheets Cl.O, C2.0 & C2.1
Th8$e are transmitted as chec:ked below:
Dior approval Dior your file [i] as required D for review & comment
Dror execution I signatures D [other]
Remarks;
The above referenced project is scheduled for the Cannel T AC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
Copies To: Mr. Jim Shinaver, Nelson & Frankenberger
EMH&T File
Signed:
~.PE
Branch Manager
If enc/O$IHDS 8t8 not as noted, kindly notify us at once.
MCMXXVI
6"" H11b;dale Court. lr\dIanaIJoUs. IN 462~ · Phone 317.' 13.61130 . Fax 317.913.6928
(;clUmbI,a. QdlnatI. ~ . CIlcIIaIIe
emht.com
u
u
E M H,~ T
.\
Evans, Mechwart. Hambleton & TIlton. Inc.
Englneers. Surveyors. Planners. Sdentlsts
Letter of Transmittal
To: Mr.lason LeMaster
Hamilton County Health Department
One Hamilton County Square, Suite 30
Noblesville, IN 46060-2229
From: Mr. Rich Kelly
Date: December I, 2005
Job no.: 2005-2281
Re: Arden
We are sending you herewith via:
o Courier Ii] U.S. Mail D Fed. Ex. D UPS
!iJcopies Doriginals 0 [other]
The following items:
Copies Date Number of DescrIption
sheets
1 11-16-05 Development Plan I Primary Plat - Plan Sheets Cl.0 & C2.0
These are transmitted as checked below:
Oror approval Dror your file [ilas required 0 for review & comment
Dfor execution I signatures o [other]
Remarks:
The above referenced project is scheduled for the Carmel T AC meeting on December 21,
200S. Please fOlWard any review comments to my attention via fax or mail.
Thank you.
CqJIes To: Mr. Jim Shinaver, Nelson & Frankenberger
EMH&T File
Signed:
Jl
If encIosU18S 819 not 88 noted, IdndJy notify us st once.
MCMXXVI
6994 H1l1sdole court. tldIalopois. IN 46250 . Phone 317.913.6930 . Fax 317.913.6928
CcMIIbul'OdlnaII'~' ~
emhl.com
u
u
EIMIH,~T
Evaru, Mechwart, Hambleton & Tlton. Ine.
EngIneers. SlIVeyors. I'IanneJs, Sclentlsts
Letter of Transmittal
To: Ms. Brooke Gajownik
Hamilton County Sheriffs Office
18100 Cumberland Rd.
Noblesville, IN 46060
From: Mr. Rich Kelly
Date: December 1,2005
Job no.: 2005-2281
Re: Arden
We are sending you herewith via:
o Courier lXl U.S. Mail 0 Fed. Ex. 0 UPS
@ copies D origiDa1a 0 [other]
The following Items:
Copies Date Number of Description
sheets
1 11-16-05 Development Plan I Primary Plat - Plan Sheets Cl.0 &: C2.0
These are transmitted as checked below:
Ofor approval Ofor your file @as required 0 for review &; comment
Dfor execution I signatures D[other]
-
R8nBIc&:
The above referenced project is scheduled for the Carmel TAC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
CopIes To: Mr. Jim Sbinaver, Nelson & Frankenberger
EMH&T File
Signed:
~'PE
Bran anager
"encIosl/t8$ Bt8 not lIB noted. kindly notify us 81 0IIC8.
MCMXXVI
6994 HIlIsdaJe Court. IndlanapoJls.1N 46250 . Phone 317.913.6930 . Fax 317.913.6928
CclImbuo' 01ch1aII' ____. ~
emht.com
u
u
EIMiH<fT
Evans, Mechwart, Hambleton & TUton, Inc.
Enol""", Surveyors. Planners. Scientists
Letter of Transmittal
To: Mr. Dcu Groves or Ms. Shirley Hunter
Cincrgy
1441 S. Guilford Rd.
Carmel, IN 46032
From: Mr. Rich Kelly
Date: December 1,2005
Job no.: 2005-2281
Re: Arden
We are sending you herewith via:
o Courier [i] U.S. Mail 0 Fed. Ex. 0 UPS
The following Items:
[i] copies
Doriginals D [other]
Capl. Date Number of DescrIption
sheets
1 11-16-05 Development Plan I Primary Plat-
Plan Sheets C1.0. C2.0. C2.l & C2.2
These are transmitted as checked below:
Dforapproval o for your file GJasrequired Dforreview&comment
Dfor execution I signatures D [other]
Renwb:
The above referenced project is scheduled for the Cannel TAC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger
EMH&T File
Signed:
{J
If encIosUIW '" not as noted, IdndIy notify us lilt once.
MCMXXVI
6994 HllbdalII COUft.lndlanapolls.lN 46~. PllOne 317.'113.6930 · f<Dc 317.913.6'128
Cc*IMtu:. ~. ~. ChcIIotte
emht.com
u
u
EIMIH<~T
Evons. Mechwarf. Hambleton & 11Iton. Inc.
engineers. 5urveycn. P/annen, Sdenllsfs
Letter of Transmittal
To: Mr. Ron Farrand
Carmel Clay Schools
5201 E. 131st St.
Carmel,IN 46032
From: Mr. Rich Kelly
Date: December I, 2005
Job no.: 2005-2281
Re: Arden
The following Items:
o Courier [i] U.S. Mail 0 Fed. Ex. D UPS
[i] copies D originals 0 [other]
We are sending you herewith via:
Copies Date Number of Description
sheets
I 11-16-05 Development Plan! Primary Plat - Plan Sheets CI.O & C2.0
Theae are transmitted as checked below:
Dfor approval Dfor yom file [iJ as required 0 for review & comment
Dfor execution! signatures DCother]
R8marIcs:
The above referenced project is scheduled for the Cannel TAC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger
EMH&T File
Signed:
If encIo8tmJ8 8/'& not as noted, kindly notify us 81 once.
MCMXXVI
6994 HillscloIe court.1ndIonopo1s, IN -462S0 - ",on8317.913.693O -1'alc317.?13.6928
CcMnbuo . 01chlalI. -........ . 00lclIt.
emht.com
u
(.)
E M HefT
Evans. Mechwort. Hambleton & Won. Inc.
EnglnHl'S. SUlVeyors. Planners. Sdentlsts
Letter of Transmittal
To: Mr.lohn South
Hamilton County SWCD
1108S. 9th St.
Nob1esville.lN 46060
From: Mr. Rich Kelly
Date: December 1, 200S
Job no.: 2005-2281
Re: Arden
W. are sending you herewith via:
G] Courier D U.S. Mail D Fed. Ex. 0 UPS
[Xl copies 0 originals 0 [other]
The following Items:
Copies Date Number of Description
she.
I 11-16-05 9 Development Plan I Primary Plat
.,
:.
These are transmitted as checked below:
Dfor approval Ofor your file GJas required o for review & comment
Dfor execution I signatures 0 [other]
~
The above referenced project is scheduled for the Carmel TAC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
Copies To: Mr. Jim Shinaver. Nelson & Frankenberger
EMH&T File
Signed:
If enclosures 818 not as noted, Ic/ndIy notify us 81 once.
MCMXXVI
"'4 HlIIsdCle Court. Indianapolis, IN 46250. Phone 317.913.6930' Fax317.913.6928
Cobnbus ' CIncndI' hc:Ic:InapaIJ . 0at0IIe
emht.com
(j
u
E MIH'fT
Evans, Mechwart, Hambleton & TIlton. Inc.
fnglneers, Surveycn. Planners. ScIenllsh
Letter of Transmittal
To: Mr. Greg Hoyes
Hamilton CoWlty Surveyor's Office
One Hamilton Colmty Square, Suite 188
Nobesville. IN 46060
From: Mr. Rich Kelly
Date: December 1. 2005
Job no.: 2005-2281
Re: Arden
We are sending you herewith via:
The following Items:
[Xl Cowier D U.S. Mail D Fed. Ex. D UPS
IiJ copies
o originals 0 [other]
Copies Date Number of Description
sheets
1 11-16-05 9 Development Plan I Primary Plat
1 11-29-05 Initial Drainage Report
These are transmitted as checked below:
Dfor approval Dfor your file Iilas required D for review & comment
Of Of execution I signatures 0 [other]
R8nwIcs:
The above referenced project is scheduled for the Carmel TAC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
CopIes To: Mr. Jim Shinaver. Nelson & Frankenberger
EMH&T File
Signed:
I
i
I
i
i
i
i
.!
i
I.
I
i
~
If enc/osU/88 818 not 88 noted, lcfndJy notify us lit once.
MCMlCXVI
69904 H1l1sdole Court.lnclanapoDs.1N <46250. Phone 317.913.6930. Fox317.913.6928
CaMrtlus. Ch:hIaII. ~. ~
emhl.com
Q
o
E,MIHc(T
Evans. Mechwart. Hambleton & Tltoo. Inc.
engIneers, SUlVeyors. Planners, Sclenllsls
Letter of Transmittal
To: Mr.lasonKirkman
Briglrthouse Networks
3030 Roosevelt Ave.
Indianapolis, IN 46218
From: Mr. Rich Kelly
Date: December 1, 2005
Job no.: 2005-2281
Re: Arden
w. are sending you herewith via:
o Courier Ii} U.S. Mail 0 Fed. Ex. 0 UPS
The following Items:
[Xl copies
o originals D [other]
Copies Date Number of Description
sheets
1 11-16-05 Development Plan I Primary Plat-
Plan Sheets C1.0. C2.0 & C2.1
These are transmitted as checked below:
Dror approval OrOt your file [Xl as required D for review & comment
Dror execution I signatures 0 [other]
R8rnaIb:
The above referenced project is scheduled for the Carmel T AC meeting on December 21,
.2005. Please forward any review comments to my attention via fax or mail.
Thank you.
CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger
EMH&T File
Signed:
If encIosUf8S ate not lI$ noted, kindly notify us at once.
MCMXXVI
69P4 HlDsdale court, indianapolis. IN 462S0 . Phone 317.913.6930 . Fax 317.913.6928
CoI.rnbuo . ~. hdcI\apoIb . CIIarIoIIe
emht.com
u
Q
iii
M Hl~T
Evans, Mechwart. Hambleton & lUtoo, Inc.
EngIneers. Surveyors. Plann8ll. Sdenll5ls
Letter of Transmittal
To: Ms.lennifer Marlett
Indianapolis Water Company
1220 Waterway Blvd.
Indianapolis, IN 46206
From: Mr. Rich KeRy
Date: December I, 2005
Job no.: 2005-2281
Re: Arden
We are sending you herewith via:
o Courier [i]u.s. Mail D Fed. Ex. D UPS
GJcopies Doriginals D [other]
The following Items:
Copies Date Number of Description
sheets
1 11-16-05 Development Plan I Primary Plat-
Plan Sheets C1.0, C2.0 & C2.1
These are transmitted 8S checked below:
o for approval Dfor your file [i] as required 0 for review & comment
o for execution I sigoatures 0 [other]
RemiItc&;
The above referenced project is scheduled for the Carmel TAC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
CopIes To: Mr. 1im Shinaver, Nelson & Frankenberger
EMH&T File
Signed:
If encIosUI8S 8IV not as noted, kindly nalffy us at once.
MCMXXVI
6994 H/l1sd0le Court.lndlanapols.IN 46250. Phone 317.913.6930. faK317.913.6928
CoIunlbuJ . Ct1c:tncIII. ndlanqooIo . Qladotle
emhl.com
u
u
E MIH'rT
Evans. Mechwart, Hambleton & TDton, Inc.
En~8B. SulveyOl$. Plannen. Sdenllsts
Letter of Transmittal
To: Ms. 1ennifer BJUIler
Clay Township Regional Waste District
10701 N. College Ave.
Indianapolis, IN 46280-1098
From: Mr. Rich Kelly
Date: December 1, 2005
Job no.: 2005-2281
Re: Arden
We are sending you herewith via:
D Courier [Xl U.S. Mail D Fed. Ex. 0 UPS
[XJ copies 0 originals 0 [other]
The following Items:
Copies Date Number of Description
sheets
1 11.16-05 Development Plan! Primary Plat - Plan Sheets Cl.O & C2.0
These are transmitted as checked below:
Dforapproval Dforyourfile G]asrequired o for review & comment
Dfor execution! signatures o [other]
Ren&1c&;
The above referenced project is scheduled for the Carmel TAC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger
EMH&T File
Signed:
tI~
Richard Kelly, PE
Branc Manager
If 9Ilc/osu19S are not as noted. Idndfy notify us at once.
M C M )( )( V I
69'" tilllsdale Court.lndlanQj:)oIis.1N <46250' Phone 317.913.6930' Fax317.913.6928
c:..t..mtM . ClncIMOIl . hfanapcIs . ~
emht.com
u
u
E MiH'iT
Evans, Mechwcrt, Hambleton & 11Iton, Inc.
Englne<<s, Surveyors. Planners. Sc/entlsls
Letter of Transmittal
To: Ms. Teresa Magee or Mr. Mark Wood
Panhandle Eastern Pipeline
9371 Zionsville Rd.
Indianapolis, IN 46268
From: Mr. Rich Kelly
Date: December I, 2005
Job no.: 2005-2281
Re: Arden
The following Items:
o Courier [i] U.S. Mail 0 Fed. Ex. 0 UPS
[i] copies 0 originals 0 [other]
We are sending you herewith via:
Copies Date Number of Description
sheets
1 11-16-05 Development Plan I Primaly Plat - Plan Sheets Cl.O & C2.0
These are transmitted as checked below:
Dfor approval Of Of your file @as requinxl 0 for ~view & comment
o lor execution I signatures 0 [other]
RsmmIcs:
The above referenced project is scheduled for the Cannel TAC meeting on December 21,
2OOS. Please forward any review comments to my attention via fax. or mail.
Thank you.
CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger
EMH&T File
Signed:
If enclosures 81'8 not /IS noted, klndJy notffy us at 0IlCle.
MCMXXVI
6994 HllIsdale Court. Indianapolis. IN 46250 . Phone 317.913.6930 . Fax 317.913.6928
C<*Imbut. QICtnalI. ~. ~
emht.com
u
u
II
I
MIH&T
Evans. MechWOff. Hambleton & lUton, Inc.
engineers. Surveyors, Planners, Sdentlsts
Letter of Transmittal
To: Mr. Greg Dko, PE
CrossRoads Engineering
3417 S. Sherman Dr.
Beech Grove, IN 46107
From: Mr. Rich Kelly
Date: December I, 2005
Job no.: 2005-2281
Re: Arden
The following Items:
o Courier Ii] U.S. Mail 0 Fed. Ex. 0 UPS
lil copies 0 originals D [other]
We are sending you herewith via:
Copies Date Number of Description
sheets
1 11-16-05 9 Development Plan I Ptimary Plat
1 11-29-05 Initial Drainage Report
These are transmitted as checked below:
Dfot approval Dfor your file lil as required D for review &. comment
Dror execution I signatures D [other]
RenwIcs:
The above referenced project is scheduled for the Cannel TAC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
Copies To: Mr. Jim Shinaver, Nelson & Frankenberger
EMH&T File
Signed:
If encIosUf8$ '" not as natJJd, kInd/y notify us at once.
MCMXXVI
6994 tllUsc:klle Court. Indlcnapoll$, IN 46250 · Phone 317.~13.6930 . Fox 317.913.6928
CGb'nbuII ChcImoII. ~. ChcIIIotII
emht.com
u
u
ElM H,~T
Evans, Mechwart, Hambleton & TIlton, Inc.
engineers. SUlVeycn Planners. SCIentists
Letter of Transmittal
To: Poasbnaster c/o Cindy KW'ber
Cannel Post Office
275 Medical Dr.
Carmel. IN 46032-9998
From: Mr. Rich Kelly
Date: December 1.2005
Job no.: 2005-2281
Re: Arden
The following Items:
o Courier [i) U.S. Mail 0 Fed. Ex. 0 UPS
[i) copies 0 originals 0 [other]
We are sending you herewith via:
Copies Date Number of Description
sheets
1 11-16-05 Development Plan / Primary Plat - Plan Sheets Cl.O &. C2.0
These are transmlUed.as checked below:
Dfor approval Deor your file @as required 0 for review &. comment
Dfor execution I signatures 0 [other]
Rerr&Ics:
The above referenced project is scheduled for the Carmel T AC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
CopIes To: Mr. Jim Sbinaver, Nelson & Frankenberger
EMH&T File
Signed:
wPu.{j{;
Branch Manager
If encIosUl8a 818 not 81 noted, kindly notify us at once.
MCMXXVI
6994 Hllsdale CoUll. Indlalapolls, IN 46250. Phone 317.913.6930. Fax317.913.6?28
CaU'nIM' Qoolnnalf. ~. ~
emhl.com
u
u
H'rT
Evans, Mechwart. Hambleton & TDton, Inc.
fn~ Surveyors. Planners. Sdentlsls
Letter of Transmittal
To: Mr. Dave Klingensmith
Carmel Street Deparbnent
3400 W. 13Ist St.
Westfield.lN 46074
From: Mr. Rich Kelly
Date: December 1. 2005
Job no.: 2005-2281
Re: Arden
We are sending you herewith via:
o Courier [Xl U.S. Mail 0 Fed. Ex. 0 UPS
The following Items:
GJ copies
o originals 0 [other]
CopIes Date Number of Descrfptlon
sheets
1 11-16-05 Development Plan / Primary Plat -
Plan Sheets C1.0, C2.0, C2.l & C2.2
These are transmitted as checked below:
Dror approval o for your file [i]as required 0 for review & comment
Dfor execution I signatures 0 [other]
Rsmark8:
"
The above referenced project is scheduled for the Carmel TAC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
CopIes To: Mr. Jim Shinaver, Nelson & Frankenberger
EMH&T File
Signed:
If enclo6U188 618 not 88 noted, kindly notify us It once.
MCMXXVI
699-4 Hill$dOle Court.lncllonopolb.IN ~ . Phone 317.913.6930. I'CIlc 317.913.6928
Cc*Jmbus . CIIlcIMaIl. IncIIanapoIo . ~
emht.com
u
II
Evans. MechWOlf, Hambleton & TOton. Inc.
Engineers. Suv8ycB. Planners. Sdenlllts
u
MIHL~T
i
Letter of Transmittal
To: Mr. Chuck Shupperd
Vectren Energy
P,Q.Box 1700
Noblesville, IN 46061-1700
From: Mr. Rich Kelly
Date: December 1, 2005
Job no.: 2005-2281
Re: Arden
We are sending you herewith via:
o Courier GJ u.s. Mail 0 Fed. Ex. 0 UPS
The following items:
IiJ copies
o originals D [other]
Copies Date Number of Descrlptfon
sheets
1 11-16-05 9 Development Plan! Primary Plat-
Plan Sheets C1.0, C2.0 & C2.1
These are transmitted as checked below:
Dfor approval Ofor your tile lilas required 0 for review & comment
Dfor execution! signatures o [other]
R8markB:
The above referenced project is scheduled for the Carmel TAC meeting on December 21,
2005. Please forward any review comments to my attention via fax or mail.
Thank you.
Cqlies To: Mr. Jim Sbinaver, Nelson & Frankenberger
EMH&T File
Signed:
If encIosu1e8 aJ9 not ss noted, Idnd/y notify us 81 once.
M C M lC lC V I
699-4 Hillsdale COUlt.lndlanopols.lN 46250 . PhOfle 317.913.6930 . Fax 317.913.69.28
COIumtaw . ~ . hcIIn:IpoII- OIadofte
emht.com
u'
NELSON
&
FRANKENBERGER
A PROFESSIONAL CORPORATION
ATTORNEYS-AT-LAW
\j
JAMES J. NELSON
CHARLES D. FRANKENBERGER
JAMES E. SHlNAVER
LAWRENCE J. KEMPER
JOHN B. FLATI'
FREDRIC LAWRENCE
DAVID J. LIClITENBERGER
of counsel
JANE B. MERRD..L
3105 EAST 98TH STREET
SUITE 170
INDIANAPOLIS, INDIANA 46280
317-844-0106
FAX: 317-846-8782
www.nf-law.com
November 18,2005
/:(/~/--(
I"-.Y
,'>,;/
/j'
1 --I
" -~
'~~-;
.\
-..... :'
'","
VIA HAND DELIVERY
r(~-~'~~- 1~
,~: ')f..,:;
l:~. _.:~ ,_~';I
" I
- .....~:", I'
, - -- --'. / \~ ';,..
\-- ,
\-
Matt Griffin
City of Carmel
Department of Community Services
RE: Arden Townhomes - ADLS, Development Plan and Plat Applications
Dear Matt,
Enclosed please find the following:
1. An original and one (1) copy of an ADLS Application;
2. An original and one (1) copy of a Development Plan Application;
3. An original and one (1) copy of a Plat Application;
4. Petitioner and Owner Consents;
5. Legal Description;
6. Last Deed of Record;
7. Proposed Zoning Schedule; .
8. . Sample Declaration of Covenants, Conditions and Restrictions; and
9. Associated Plans and Drawings for the ADLS, DP and Plat approval
Applications.
As you know, the Arden Rezone Pending under Docket Number 0505004Z and
Ordinance Number Z482-05 is currently before the Common Council for final review and
approval. In anticipation of a possible approval of the rezone, we are filing the enclosed
applications for ADLS, Development Plan, Plat Approval. If the rezone is approved, you can
obtain from the Clerk-Treasurer's Office the final and approved PUD ordinance which will
govern the development of this project.
The engineers will mail directly to the T AC agencies in your office, the plans required for
the tax submittal. Please be sure that this matter is placed on the T AC Agenda and provide me a
Nelson & Frankenberger U.
November 18, 2005 .
Page 2
\j
copy of that agenda prior to the meeting. Also, please review the zoning schedule and advise me
if I have provided the. correct chronology of deadlines and hearing dates. Finally, after you have
reviewed the enclosed applications, please assign the appropriate docket numbers and advise me
of the filing fee so that I can have my client pay the same. As usual, thank you for your
cooperation and assistance in this matter.
Very truly yours,
NELSON & FRANKENBERGER, P.c.
JES/kat
Enclosure
H:\brad\buckingham\arden\griffin Itr 111705.doc
11/18/05
12/06/05
12/21/05
12/21/05
12/23/05
01/06/06
01/11/06
01/17/06
01/27/06
02/07/06
02/24/06
03/07/06
03/1 0/06
03/15/06
03/21/06
. . -~-.
w
~
ARDEN ADLS
Deadline to file
Engineer mail T AC submittal
T AC meeting during business hours
Noon deadline e-mail notice to Indianapolis Star
Deadline mail c/m to publish notice
Noon deadline file brochures/proofs Notice with Staff / C-e.-e..
Staff Reports issued
6:00 p.m. PC meeting (151 meeting)
Noon deadline file revised PC Committee brochures (if needed)
6:00 p.m. 15t Committee meeting'
,
Noon deadline file revised PC Committee brochures
6:00 p.m. 2nd PC Committee meeting.
Noon deadline final PC brochures due Staff
Staff Reports issued
6:00 p.m. PC meeting (2nd meeting/fmal vote)*
*The above schedule contemplates 2 PC Committee meetings. If only 1 PC Committee meeting
is required, the final full PC meeting will occur on 02/21/06 for a final vote.
H:\brad\Buckingham\Arden\PC Schedule.doc