HomeMy WebLinkAbout05110041-Receipt/Permit
-i
"
""l"
"
Item
1 of
1
CITY OF CARMEL
PERMIT RECEIPT
OPERATOR: vdolan
COPY # 1
~l~:
V--~ /' ~-:C-V
lOAll'W' r ~ CAf't
V' \ Zl-~~
A^L f\ t~~
1 QJLP" L 5 /"pVt?J ~\ JIt
1~7
See: Twp: Rng: Sub: Blk: Lot:
PARCEL ID ........: SEWER
DATE ISSUED.......: 10/24/2005
RECEIPT #. . . . . . . . .: 20218
REFERENCE ID # ...: 05100150
SITE ADDRESS. .....
SUBDIVISION...... :
CITY .............: CARMEL
IMPACT AREA ......:
OWNER ............:
ADDRESS ..........:
CITY/STATE/ZIP ...:
RECEIVED FROM ....:
CONTRACTOR .......:
COMPANY ..........:
ADDRESS ..........:
CITY/STATE/ZIP ...:
TELEPHONE .........
FEE ID UNIT QUANTITY
UWATAVAIL FLAT RATE 1.00
TOTAL PERMIT :
METHOD OF PAYMENT
AMOUNT
CHECK
TOTAL RECEIPT :
5934.00
------------
------~-----
5934.00
PLATINUM PROPERTIES
9551 DELEGATES ROW
INDIANAPOLIS, IN 46240
PLATINUM PROPERTIES
LIC # XALLSTAR
ALL STAR EXCAVATING
CICERO, IN
(317) 223-4818
AMOUNT PD-TO-DT THIS REC NEW BAL
---------- ---------- ---------- -~--------
5934 00 O. 00 5934 .00 0.00
---------- -------~-- ---------- -----~----
5934 00 0.00 5934 .00 0.00
NUMBER
8817
CIJ)' OF CARMEL / CLAY TOWNSHIP
w'A TER / SEWER PERMIT / RECEIPT
Permit #: 05100150
Date: 10/24/2005
PARCEL 10 #: SEWER
LOT & SUBDIVISION:
ADDRESS OF CONSTRUCTION: CARMEL, IN
PAYMENT RECEIVED FROM:
Name: PLATINUM PROPERTIES
CHECK #: 8817
EXCAVATOR INFORMATION:
Name: ALL STAR EXCAVATING
Ph. #: (317) 223-4818 Fax #:
Street Address: CICERO, IN
Bond Expiration:
Email:
PERMIT TYPE: USEWRWATR
SEWERlWATER PERMIT
Special Notes/Conditions:
LONG RIDGE ESTATES, SECTION 1, WATER AVAILABILITY
APPROVED BY BPWS 10/19/2005
. NO NOTES'
The building & Sewer Shall be pve sewer pipe meeting ASTM specifications 3034 SDR 35 of latest revision; or vitrified clay pipe, meeting
ASTM specifications C-700 for extra strength clay pipe of latest revision unless other materials are hereby permitted in writing. The sewer
shall be installed in accordance with ASTM 2321 for pve pipe and the Uniform Plumbing Code for the State of Indiana. All installations shall be
in strict compliance with pertinent City of Carmel ordinances. Back Water check valves shall be installed in accordance with City Code Section
9-122(a), and sections P3008.l and.2 of the International Residential Code. All building sewers shall be 6" diameter.
All installations shaH be "ooen trench" inspected and approved bv the Carmel Sewer Department before any backfillinll is done. Non-
compliance may result in digging up the sewer installation and/or denial of future sewer permits and/or denial of water connections.
No footing or foundation drains or other sources of ground water or stann water shall be pennitted to enter the public sewer.
Sewer insoections should be reauested at (317) 571-2648 one to four hours in advance.
No inspections or installations will be made on Saturday or Sunday or holidays unless arrangements are made at least 24 hours in advance. All
plumbers or contractors installing sewer (or water) lines shall have a plumbers bond posted with the CITY ENGINEER'S OFFICE. If any street
must he cuL a senarate street cut nermit shall he ohtainccl
APPLICANT NAME: DENNIS
VORE
PAYMENT RECEIVED BY:
FEES:
$5,934.00
..~"'"
Form B~~i R~v!sed 10-20-82 ~
Name ~f pro~ct.' ~~J-_~ag_fmmJ__thtwICi____________' S/OO!)O
Locat~on: ___~JL~~~~~-L~~~l_______________
Name of APPli~t~?!::M~_~J;.~______________
Address: q~ ____ ~ ~~~b{_~~j2__________ Phone: ___________________
Date Figured: L~~~Q~___ By: ~__ Applicable Ordinance(s) _~j~1~_________
CONNECTION
----------
SEWER
-----
TOTALS
------
(a) Total User Units:
(b) User Multiplier:
c-:rflw b
--------~---
(d)
Connection Charge per
1 E.D.U.
Total Con;ectlo;-Charge
(c x d) ___~~~______
(c) Total E.D.U.'s (a x b)
(e)
WATER
(f) Total User Units: ~"
(g) User Multiplier: =~~=
(h) Total E.D.U.'s (f x g) ~~~____
( i )
Connection Charge per
1 E.D.U. jJ~/O~~____
Total Connection Charge ,f ~
(h xi) !. S-2il______
(j)
---------------~---------------------------~-------------------------------------
AVAILABILITY
-----------
SEWER
-----
(k) Number of Acres CI~~,-td 0_,-_
(1) Cost per Acre
-------------
WATER
----- ;J .11--.
(n) Number of Acres
----(J;i---'-----
(0 ) Cost per Acre 2m (L!J1L~t:fIlJI}L
(m) Availability Charges(k x 1)
rJ,~
(p) Availability Charges(n x o)__jV.~____
__~-,13~____
__~J~g;i(l ~ __
(q)
Meter Installation Fee
Total Charges
----7e-+-Y-+ m + p + q)
Date Paid: ~LZ~~~__ By: ~_____ Received by: ~_______
* Remarks: ____W~&J.tS1ffi~fLQ:LfhuJ.i2:<.2tj..lc(Lil.tf..-~-~C----------------
____________.J.~f:! c _rMt1J!:L&J1__f ~_~r{'pqj)P!!:...L't2~-(}, ~-------------
------------------------------------------------------------------
(Over for further remarks)
,