Loading...
HomeMy WebLinkAboutA383_SECTION DETAILSARCHITECTCLIENT CONSTRUCTION MANAGER PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20011 OCT. 06, 2021AVANT PHASE IICARMEL, INEDWARD ROSEDEVELOPMENTCARMEL LLC.FOR CONSTRUCTION No. AR12000062 STATE OF MDXELA ARS H T E C TCHI AR STGI R E E DER IANDI N A A383SECTION DETAILSSCALE: 01 DETAILS SECTION 3" = 1'-0"F1SCALE: 02 DETAILS SECTION 3" = 1'-0" SCALE: 03 DETAILS SECTION 3" = 1'-0"F1 1"BASE REVEAL TRIM, FRY REGLET OR EQUAL. KICK-OUT FLASHING EW1 CELL VENTS & WEEPS, INSTALLED @ 24" O.C. HORIZONTALLY 4"1"3"MORTAR NET THRU-WALL FLASHING CAST STONE STRING COURSING W/ DRIP CELL VENTS & WEEPS, INSTALLED @ 24" O.C. HORIZONTALLY CELL VENTS & WEEPS, INSTALLED @ 24" O.C. HORIZONTALLY THRU-WALL FLASHING MORTAR NET GROUT SOLID TO FOOTING BASE TRIM, PER SCHEDULE FORMED METAL SCUPPER BOX SET ON FULL BED OF SEALANT 2x_ TREATED WOOD NAILERS EXTEND BUILDING WRAP AROUND SCUPPER METAL CONDUCTOR HEAD W/ INTEGRATED SCUPPER- REFER TO OVERALL ROOF PLAN FOR LOCATION FLASH AROUND ALL SCUPPER BOX TERMINATION EXTEND ROOFING MEMBRANE BEHIND SCUPPER BOX- ROOF FLASHING @ OVERLAP 4"34" EXTERIOR SHEATHING MISCELLANEOUS 2x_ FRAMING BETWEEN ROOF TRUSSES @ ALL SCUPPER LOCATIONS 2" RIGID INSULATION W/ VAPOR BARRIER BELOW GRADE- EXTEND TO BOTTOM OF FOOTINGR1SIMEW2 PRE-FINISHED METAL COPING W/ DRIP EDGE & CONTINUOUS CLEAT34"SEALANT SEALANT 2x_ TREATED WOOD NAILERS 3/4" EXTERIOR SHEATHING SCALE: 04 DETAILS SECTION 3" = 1'-0" 14" PER 12"MIN. 14" PER 12" MIN. SCALE: 05 DETAILS SECTION 3" = 1'-0" BALCONY FRAMING- REFER TO STRUCTURAL DRAWINGS OUTSIDE CORNER W/ VARIABLE ANGLE TRIM, FRY REGLET OR EQUAL FIBER CEMENT FASCIA, SIMILAR TO EW2 716" SHEATHING & BUILDING WRAP 2x_ TREATED BLOCKING @ 16" O.C. 14" PER 12" MIN. OUTSIDE CORNER TRIM, FRY REGLET OR EQUAL SCALE: 06 DETAILS SECTION 3" = 1'-0"F2INTERIOR CORNER TRIM, FRY REGLET OR EQUAL TERMINATION TRIM, BY PANEL MANUFACTURER- CAULK BALCONY FRAMING- REFER TO STRUCTURAL DRAWINGS TREATED 2x_ BLOCKING FOR SLOPE 14" SHIM & SEALANT 38"STOREFRONT ASSEMBLY, PER SCHEDULE FIBER CEMENT PANEL, SIMILAR TO EW2 716" SHEATHING W/ BUILDING WRAP 14" PER 12" MIN. WRAP BUILDING WRAP AROUND SCUPPER AND EXTEND UP PARAPET 1'-0"CELL VENTS & WEEPS, INSTALLED @ 24" O.C. HORIZONTALLY338"SCALE: 07 DETAILS SECTION 3" = 1'-0" EW1 EW3 METAL FLASHING W/ DRIP EDGE, SET IN SEALANT SCORE MASONRY FOR 4" ROWLOCK LEDGE12"1 ASI 02 10.06.2021 158"4"4"1" METAL FLASHING W. BACKER ROD & SEALANT 12"10/11/21