Loading...
HomeMy WebLinkAboutA453_ELEVATOR ENLARGED PLANS & SECTIONSARCHITECTCLIENT CONSTRUCTION MANAGER PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20011 APRIL 28, 2021AVANT PHASE IICARMEL, INEDWARD ROSEDEVELOPMENTCARMEL LLC.PERMIT SET No. AR12000062 STATE OF MDXELA ARS H T E C TCHI AR STGI R E E DER IANDI N A A453ELEVATORENLARGED PLANS& SECTIONSSCALE: 01 TYP. ENLARGED PLAN ELEVATOR HOISTWAY 3/4" = 1'-0" ELEVATOR --- 2 A453 SCALE: 02 SECTION ELEVATOR JOISTWAY 3/8" = 1'-0" FIRST FLOOR 0'-0" SECOND FLOOR 12'-0" THIRD FLOOR 22'-8" FOURTH FLOOR 33'-4" TRUSS BEARING 42'-8" 8" HOIST BEAM, PROVIDED BY ELEVATOR SUPPLIER, INSTALLED BY OTHERS 4'-0" TYP.FIRST FLOOR 0'-0"2'-6" 6'-0" 5'-4" 5'-4" 4'-8" 2'-758" 71116"B.O. HOISTBEAM 47'-11 1/4" B.O. JOIST 49'-2 5/8" ELEVATOR BASIS OF DESIGN KONE MONOSPACE 500 SERVICE SHAPE CAPACITY: 4,000 LBS SPEED: 200 FPM DOOR: LEFT OPENING TRAVEL: 33'-4" CONTROL LOCATION: INTEGRATED FFE REFER TO T.O. FLOOR DECK FRAMING. CONTRACTOR TO COORDINATE ADJUSTMENTS FOR TOPPING SLABS AND FINISHES NOTIFY G.C. / ARCHITECT WITH ANY DIMENSIONAL CONFLICTS BETWEEN DRAWINGS & ELEVATOR SUBMITTAL PRIOR TO INSTALLATION.W6aW3pW6aW1 W6a CONTINUE SOUND ATTENUATION BATTS THROUGH SHADED PORTION 8'-1114" CLR W6b W6a 4'-0" 2'-1158" 758" 4" 4"758" 9'-2" CLR 75 8"7'-8" CLR 758" 4" 6" 8'-1114" CLR LOCATION OF INTEGRATED CONTROLS F2 F2 F2 F1R1 F2 F2 F2 F1R1R2SCALE: 03 DETAIL SECTION 3" = 1'-0" SCALE: 04 DETAIL SECTION 3" = 1'-0" 03 A353 04 A353 2x_ TREATED NAILERS PRE-FINISHED COPING GRAVEL STOP & DRIP EDGE W/ CONTINUOUS CLEAT 1 1/2" RIGID INSULATION R2ROOFING MEMBRANE FLASHING 8" BOND BEAM FIBER CEMENT PANEL, SIMILAR TO EW4a CANT STRIP ROOFING MEMBRANE FLASHING TO EXTEND UP VERTICALLY AND UNDER KICK-OUT FLASHING, MIN 12" 8" BOND BEAM EXTEND WEATHER BARRIER DOWN TO MEET PLYWOOD DECKING4" BASE REVEAL TRIM, FRY REGLET OR EQUAL 12"FIBER CEMENT PANEL, SIMILAR TO EW4a 1 1/2" RIGID INSULATION 2x4 TREATED NAILER, INSTALLED VERTICALLY @ 24" O.C.3"838" 75 8" 4"W6a10'-514" CLR758" 4" 10/11/21