HomeMy WebLinkAboutA453_ELEVATOR ENLARGED PLANS & SECTIONSARCHITECTCLIENT CONSTRUCTION MANAGER PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20011
APRIL 28, 2021AVANT PHASE IICARMEL, INEDWARD ROSEDEVELOPMENTCARMEL LLC.PERMIT SET
No. AR12000062
STATE OF
MDXELA
ARS
H
T E C TCHI
AR
STGI
R E E
DER
IANDI N A
A453ELEVATORENLARGED PLANS& SECTIONSSCALE:
01 TYP. ENLARGED PLAN
ELEVATOR HOISTWAY
3/4" = 1'-0"
ELEVATOR
---
2
A453
SCALE:
02 SECTION
ELEVATOR JOISTWAY
3/8" = 1'-0"
FIRST FLOOR
0'-0"
SECOND FLOOR
12'-0"
THIRD FLOOR
22'-8"
FOURTH FLOOR
33'-4"
TRUSS BEARING
42'-8"
8" HOIST BEAM,
PROVIDED BY
ELEVATOR SUPPLIER,
INSTALLED BY
OTHERS
4'-0" TYP.FIRST FLOOR
0'-0"2'-6" 6'-0" 5'-4" 5'-4" 4'-8" 2'-758" 71116"B.O. HOISTBEAM
47'-11 1/4"
B.O. JOIST
49'-2 5/8"
ELEVATOR BASIS OF DESIGN
KONE MONOSPACE 500 SERVICE SHAPE
CAPACITY: 4,000 LBS
SPEED: 200 FPM
DOOR: LEFT OPENING
TRAVEL: 33'-4"
CONTROL LOCATION: INTEGRATED
FFE REFER TO T.O. FLOOR DECK FRAMING.
CONTRACTOR TO COORDINATE
ADJUSTMENTS FOR TOPPING SLABS AND
FINISHES
NOTIFY G.C. / ARCHITECT WITH ANY
DIMENSIONAL CONFLICTS BETWEEN
DRAWINGS & ELEVATOR SUBMITTAL PRIOR
TO INSTALLATION.W6aW3pW6aW1
W6a
CONTINUE SOUND
ATTENUATION BATTS
THROUGH SHADED
PORTION
8'-1114" CLR
W6b
W6a
4'-0" 2'-1158" 758" 4" 4"758" 9'-2" CLR 75 8"7'-8" CLR 758" 4" 6"
8'-1114" CLR
LOCATION OF
INTEGRATED
CONTROLS F2 F2 F2 F1R1 F2 F2 F2 F1R1R2SCALE:
03 DETAIL
SECTION
3" = 1'-0"
SCALE:
04 DETAIL
SECTION
3" = 1'-0"
03
A353
04
A353
2x_ TREATED NAILERS
PRE-FINISHED COPING
GRAVEL STOP & DRIP
EDGE W/ CONTINUOUS
CLEAT
1 1/2" RIGID
INSULATION R2ROOFING MEMBRANE
FLASHING
8" BOND BEAM
FIBER CEMENT PANEL,
SIMILAR TO EW4a
CANT STRIP
ROOFING MEMBRANE FLASHING TO
EXTEND UP VERTICALLY AND UNDER
KICK-OUT FLASHING, MIN 12"
8" BOND BEAM
EXTEND WEATHER
BARRIER DOWN TO
MEET PLYWOOD
DECKING4" BASE REVEAL TRIM,
FRY REGLET OR
EQUAL
12"FIBER CEMENT PANEL,
SIMILAR TO EW4a
1 1/2" RIGID
INSULATION
2x4 TREATED NAILER,
INSTALLED VERTICALLY
@ 24" O.C.3"838" 75 8" 4"W6a10'-514" CLR758" 4" 10/11/21