Loading...
HomeMy WebLinkAboutCorrespondence \ .. ON-SITE ALUATION FOR EROSION AND SEDI T CONTROL Hamilton County Soil and Water Conservation District 1108 South 9th Street, Noblesville, IN 46060 Phone: 317-773-2181 or Email:john-south@iaswcd.org Date: June 24, 2003 ~~/o\ Sf Project Name: Brookstone Park Sec. 2 Present at Site: John South, Hamilton Co. SWCD, This report was provided to: SCM Development 90 Executive Drive, Suite H Carmel, IN 46032 Carmel DOCS Surveyor File TYPE OF EV ALU A TION: Initial X Routine 0 Follow-up 0 Complaint This evaluation is intended to assess the level of compliance with 327 lAC 15-5 (Rule 5). It is also intended to identify areas where additional measures may be required to control erosion and sedimentation. All practices recommended in this report should be evaluated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer. All erosion and sediment control measures shall meet the design criteria, standards, and specifications outlined in the "Indiana Handbook for Erosion Control in Developing Areas" or similar guidance documents. Current Site Information: Site development is completed. All disturbed areas are seeded except for 30' behind the curbs. Home construction has not started in this section. The Following Items Have Been Evaluated and Assigned a Designation of: S = Satisfactory M = Marginal U = Unsatisfactory NA = Not Applicable Construction Site Management for Erosion and Sediment Control S (1) Disturbed areas have been adequately protected through seeding or other appropriate erosion and sediment control measures. S (2) Appropriate perimeter sediment control measures have been implemented. S (3) Conveyance channels have been stabilized or protected with appropriate sediment control measures. S (4) Erosion & sediment control measures are installed properly. S (5) Storm drain inlets have been adequately protected. S (6) Outlets have been adequately stabilized. S (7) Existing erosion & sediment control measures are being maintained. M (8) Public & private roadways are being kept clear of accumulated sediment or tracked soil. na (9) Erosion & sediment control measures have been installed and maintained on individual building sites. Status of Sediment Retention On-Site o Site conditions present a high potential for off-site sedimentation. o There is evidence of off-site sedimentation. Describe: o Please Refer to the Comments Section of this Report Compiled By: _John South Satisfactory: Marginal: Unsatisfactory: Not Applicable: Definitions The item is currently in compliance with the Rule A concern has been identified; corrective action is strongly recommended to remain in compliance A violation has been identified and the site is not in compliance; corrective action is required Does not apply at this stage of construction Revised 4 /98 .. , ON-SI~V ALVA nON FOR EROSION AND SEDIM~T CONTROL COMMENTS PROJECT NAME: Brookstone Park Page 2 The items checked below must be corrected prior to _7/11/03 , unless otherwise noted. This site looks good. The disturbed land along the R/W needs to be seeded. Report Prepared By: John B. South P.E. CPESC Revised 4 /98 May 21,2003 W 350 E. New York St., Suite 300 Indianapolis, IN 46204 (317) 634-6434 Phone (317) 634-3576 FAX www.mid-stateseng.com Mr. Jon Dobosiewicz Planning Administrator Department of Community Services City of Carmel One Civic Square Carmel, IN 46032 tt .- ,\ Ir.'i\ o~C'r \ '! \.." ,\ ,..,' f\{\f\~ "\:I'J ?J L\J'v \. h\ DOCS RE: Brookstone Park of Carmel, Sec. II Secondary Plat Dear Mr. Dobosiewicz: In response to your comment letter dated May 1, 2002 concerning the above referenced project, the following is offered to your comments: "1. Change "Final Plat" to "Secondary Plat."" The change has been made. "2. Change note of "Prepared by" to "Surveyor."" The change has been made. "3. Change note of "Developed by" to "Subdivider"." The change has been made. "4. Change note of "owned by" to "Owner"." Complete. "5. Do pedestrian paths run through Blocks A & D? If so, please add pedestrian access easements." A 10 foot pedestrian access easement has been added. 6. Remove "When contracted by developer" from the Monumentation Legend. Has been removed from the Monumentation Legend. 7. Monuments must be concrete at all comers of proposed subdivision (sections included, not comer of quarter section, comer of block on perimeter). Legend has been updated. 8. Change "W 146th Street" to "West 146th Street." Street has been changed. Aviation Engineering Landscape Architecture Site Engineering Surveying Transportation Engineering w Q TRANSMITT AL 350 E. New York St., Suite 300 Indianapolis, IN 46204 317-634-6434 www.mid-stateseng.com EnGInEERinG Civil/Site Design. Surveying. Transportation Engineering. A viation Engineering To: Address: Attention: Re: o Mail Department of Community Services Date: OS/21/03 One Civic Square City, St, Zip: Carmel, IN 46032 Jon Dobosiewicz Project: Brookstone Park of Carmel, Sec. II Secondary Plat Job No.: 111-1342 PhasefTask F/6000 o Pick-Up o Messenger 0 1 Hour 0 2 Hour [gI Same Day o Express Check We are sending here within: Description Copies [gI [gI [gI o o o o o o o o Secondary Plat /, 2 ./ j:;"" j" ?f-Cr \\lED \ ':';""'1 ?N\~\ \. "" f'! \.\'1" Ii i\ \ {. .. DOCS Response Letter Approval Letters - HCHD, HCS, & SWCD 3(-01 sP Information per your Request [gI [gI See remarks below Please review & respond Remarks: Secondary Plat, for your review. From: Doug Corey CC: Duke Haley o Client w Q Page 2 of2 Brookstone Park of Cannel, Section 2 9. Check "See Sheet (number) for Continuation." Some are mislabeled. Continuation labels have been corrected on all sheets. 10. Note: Addresses are not required on a secondary plat. If ever a change were necessary it would require a secondary plat amendment, which is both costly and time consuming. As a matter of policy our Department recommends that addresses not be placed on the secondary plat (sheet 5 only). The addresses are not included on the Secondary Plat. 11. Label Block "A", sheet seven, what is designation of small block on sheet seven, southeast comer? Label this block separately. The southeast corner on sheet seven is included in Block "A" and has been labeled as such. 12. Add a marker between lots 80 & 81 on Sheet 7. Marker between lots 80 & 81 has been added on Sheet 7. 13. Have a Mylar signed by property owner and surveyor (with R.L.S. seal) prior to signature by director. The mylar will be signed once the plat is approved. 14. Forward a copy ofthe final review / approval letters from the following agencies: a. Hamilton County Highway b. Hamilton County Surveyor c. Soil and Water Conservation District The approvals are included.. 15. Update dates to 2002 for signature blocks. Dates have been updated on the signature blocks. 16. Add pond in Block "A" and identify bottom elevation, normal pool, and 100- YR flood elevation for pond(s) to plat. Added pond, normal pool and 100- YRflood elevation to plat. If additional information is needed, please do not hesitate to contact me. Sincerely, Mid-States Engineering -y-).. 1. c.., Douglas S. Corey Enclosures c. Duke Haley, SCM Development ~AMIL TON COUNTY HIGHWAY DEPARTMENT Mr. Douglas S. Corey Mid-States Engineering 350 East New York Street Indianapolis, Indiana 46204 f)\se ~~' ~' '.'0, ~ DC. f'r\\!t,.D \\L) 1'1'1 \! 'I,\f 21 2n\~;) .! \\ DOCS June 12,2002 RE: Brookstone Subdivision, Section 2 Secondary. Plat S of 146l!1 Street i E of Ditch Road Clay Township Dear Mr. Corey: This letter serves to acknowledge receipt of a transmittal received 5/24/02 containing the plans for the above-mentioned project. After reviewing the plans the Highway Department has the following comments: 1. Please remove the road and road dimensions, swale locations and asphalt path from the right of way on the plat. Only the dimensions and labels for the right of way need to be included. 2. The testing and inspection will need to be executed for Section 2 before any construction can begin. 3. Bonds/Letters of Credit will need to be submitted at the time of final plat approval. The bondslletters of credit should match the provided estimate for the work. 4. It appears that all comments have been satisfactorily addressed for the construction plans and secondary plat. Therefore, the Highway Department request seven sets of plans for final approval. The plans should not be submitted until all comments from the Hamilton County Surveyor's office have also been addressed. If you have any questions or comments concerning this letter, please feel free to contact me at anytime. Sincerely, .4:-/3~ .st:n I ~roermann Staff Engineer cc: Jon Dobosiewicz Steve Cash G:\USERS\SB\02T AC\06-12-02brookstone,doc 1700 South 10th Street NoblesvilIe, In. 46060 www.co.hamilton.in.us Office (317) 773-7770 Fax (317) 776-9814 RUG 28 '01 01:45PM P.1/1 :Kenton C. 'Ward, Sur/.leyor 'T'/iOllt (J J.;') 7'1D-'~4~."i 'tax (;17 J 776-;'';:1.8 Suite r 88 0111' ,1 ulmil'lJlI Ccl/lnty Square .."'1\'IlMII,C!'iltc, Il/dluRlI -Il:io6o-j.7.J" \ ~~ ';~ ; 1) August 28, 20<l} ?-fCr\\!tDf\/\ ~' ~ \1 l') 1 ';~\\J\l \'\1\ \ l. -. DOCS Jonathan Moen Mid States Engineering Re: Brooks1one Park. Sec. 2 I have reviewed the plans for this project and have the following comments. Procedural Items: 1. Please provide the signed form to make the stonn sewers regulated. 2. Provide the signed Non-enforcement Permit form. with the appropriate check, 3. Please forward an engineers estimate or oOPY of the contract for 100% of the constmction costs for storm sewers (including SSD), erosion control, and monuments and markers, 4. Submit original letters of credit or bonds for the above amounts. Construction PIaIl,: S. A 6" field tile has been located south of the intersection of Towne Road and 146111. This field tile crosses Town Road and comes onto this site 3 t north of the existing culvert There may be further discussions regarding this tile, 6. The other construction plan items previously discussed have been satisfactorily addressed. If you have any questions or if the plans change please contact this office at 776-8495. -~Y' . ~.~ ~ Steven T, Cash Plan Reviewer Cc: Cannel DOCS SCS Co. Hwy AUG-28-2001 01:30PM TEl) ID)MID STATE ENGIN. PAGE: 001 R=99" 'J\ 1fb\ 'l.j " 925 Division Street Noblesville, IN 46060-2744 Ph. (317) 773-1432 Fax (317) 776-1101 l>- i;' DCf'F\\fE \\L.~J 0,'1 " '.... 22 1) ,'H, ,..')l I. ,'A I" " -'. O(\ns' ,-II..; CONSERVATION DISTRICT Drainage, Erosion and Sediment Control P~ Technical Review and Comment Project Name: Submitted By: 82tck:ST6.NE PAIZ.J<. of C4/ZIfEL '.5;i!.1I OBJeLOPttB./T fib EIE."t:.tJ-nVE ~IUE SUITE. ~ C-A.tz.HE.L.. XIo./ 4/'O~L. ~ec 'I-Z a2.~~ 'S.NELL/~f. 1"1 '0 STLJ. T1='"S e rJ ~ 35"0 E. NEI.t.J )'D/ZJc. sr. 5"1I'~ 300' .:I::;J DI .&.N4J1OLJ I, . '7":./ 6./ ~.z.o4.j Reviewed By; .46"'" 6. Sto-n-l. Plan Review Procedure: Site VISit Date: Location: Legal Desc#ption: SEC. z. z.. Township: .) &V Plan Review Date: I-?- Z. DOb Range: 3 e Civil Township: ~L.A)" The technical review and com:ments are intended to evaluOte the completeness of the erosion and sedbnen/ control plan for the prpjecL The erosion and sediment control plan submitted was not reviewed for the ~ of the engineering design. .All practices incl~ in the Plan. as well as those recommended in the' comments should be evaluated as to their feasibility by a qua/!fied individual with structural practices desigTl!!d by a qualified engineer. The plan has not been reviewedfor local. state or federal permits that may be required to proceed with this project Additional information. including design calculations may be requested to further.~ the erosion sediment control plan. The erosion and sediment control plan has been reviewed and it has .been determined that the PIam . " SatisfieS the mbiimum requirements and intent of327IAC. 15-5 (Rule 5). Notification will be forwarded to the Indiana pepartment ofED.vironmentaI Management. o Refer to the comments section for additional.information. o Does not satisfy the minimum requirements and intent of 327IAC 15-5 (Rule 5); deficiencies are noted in the checldist and in the comments section. Deficiencies constitute potential violation of the role and must be adequately addressed for compliance. The information necessary to satisfy the deficiencies must be . . submitted: . . Please address revisiori:; to the rev.iewer: NO -re - . '" 'Il C "A.eTE. ~L 'E ~ :ZAN S l!ro~. implementation of the erosion and $ediment control pll1!l and inspections of the constructio,n.site by die :~oper or Q. i:q1resentative are ~ary.to. minimize off-sue s~imenlat'im. The cievelojer s~ ~ aware . .diii! rmforeseen constniciion tictivities and weather conditions may effect the peifoririance of a pract~ or the 'erosiOn and seiiimenl control plan. The plan must be aflexible document, with provisions to modify or sUhstihtte . 'aCtices as necessory. " cc: r OEM . L L . &..L.;, G S.CA5H S. 81!DU-1fA"'''' .... ..' f~.' ON-SIT( jv ALU A nON FOR EROSION AND SEDt - ')NT CONTROL ~amilton County Soil and Water ConservatiOlMstrict 1108 South 9th Street, Noblesville, IN 46060 Ph: 317-773-2181 Fax; 317-776-1101 Date: i w.1./- 03 Project Name: (3iDDl $1017 e.. . '3 t-Ol Sf Present at Site: John South, Hamilton Co. SWCD, This Report Provided To: fft:trfh ,ee '$Oi.)I'e.e EKCAt)A;:7/Alc; VI. AJJ~.S) SCH o el1dOfAed- '0 E k IS' U TuJE. Dl2we... 51.) rrE. II CAIZ Ifl!/..,:J:"" t/I.aO:JZ- C' tWWt~ Sv,.",e~~ , r;/t:.... TYPE OF EVALUATION: ~ Initial o Routine o Follow-up o Complaint This evaluation is intended to assess the level of compliance with 327 lAC 15-5 (Rule 5). It is also intended to identify areas where additional measures may be required to control erosion and sedimentation. All practices recommended in this report should be evaluated as to their feasibility by a qualified individual with structural praciices designed by a qualified engineer. All erosion and sediment control measures shall meet the design criteria, standards, and specifications outlined in the "Indiana Handbookfor Erosion Control in Developing Areas" or similar guidance documents. Current Site Information: RC'Jh qrtlcIJj,\~. /Jec-i"/'" (-t~iJ/~t/ ..j " U/-,lle$ 5';/111 (){ s!"we/' IUt,J(' 1(6/ ~.M~ :ion/t::. sloml ~~6Jer )'1.~/k,/' The Following Items Have Been Evaluated and Assigned a Designa!uvlI VI. S = Satisfactory M = Marginal U = Unsatisfactory NA = Not Applicable Construction Site Management for Erosion and Sediment Control S M @ NA (1) Disturbed areas have been adequately protected through seeding or other appropriate erosion and sediment control measures. S M @ NA (2) Appropriate perimeter sediment control measures have been implemented. S M U <W (3) Conveyance channels have been stabilized or protected with appropriate sediment control measures. S M 4:D NA (4) Erosion & sediment control measures are installed properly. S M (jj;) NA (5) Storm drain inlets have been adequately protected. ~ M U NA (6) Outlets have been adequately stabilized. , S M U <JSE:)(7) Existing erosion & sediment control measures are being maintained. 6? M U NA (8) Public & private roadways are being kept clear of accumulated sediment or tracked soil. S M U LEE> (9) Erosion & sediment control measures have been installed and maintained on individual building sites. Status of Sediment Retention On-Site o Site conditions present a high potential for off-site sedimentation. o There is evidence of off-site sedimentation. Describe: Satisfactory: Marginal: Unsatisfactory: Not Applicable: 4' Please Refer to the Comments Section of this Report Definitions The item is currently in compliance with the Rule A concern has been identified; corrective action is strongly recommended to remain in compliance A violation has been identified and the site is not in compliance; corrective action is required Does not apply at this stage of construction Revised 4/98 -, ~ ,,, ~v ALVA nON FOR EROSION AND SED(.;.NT CONTROL COMMENTS PROJECT NAME: Brooks fOiA€- Page 2 The items checked below must be corrected prior to z- 7-()~ , unless otherwise noted. o Install an appropriate sediment control practice between construction areas and lower lying areas. o Replace/Repair silt fence and/or straw bale barriers. o Entrench silt fence (6-8 in.) and/or straw bale barriers (4 -6 in.) and stake straw bales. o Remove accumulated sediment from: 0 sediment traps/basins, 0 behind silt fence/straw bales, 0 around storm drain inlet protection devices, 0 streets and gutters (Do not flush with water) 9' Temporary seed, fertilize, and/or mulch: Ret:.onl/11' -. As' .:J,'e~.J;/.. ttt- ~ " CJ.- o Pennanent seed, fertilize, and mulch areas t at are at final grade: fi Protect storm drain inlets:... curb inlets)fdrop inlets o Reshape and stabilize sideslopes of: 0 sediment traps/basins, 0 detention/retention basins ~ Install/Maintain construction entrance(s): 4i;b>4 t c.~~r.~e.... o Reshape and stabilize conveyance channels: o Place greater emphasis on erosion and sediment control on building sites; contractors, subcontractors, material vendors, and others should be made aware of erosion and sediment control requirements. Appropriate perimeter sediment controls (e.g. silt fence) and stable construction entrances shall be utilized on all sites. Sediment tracked into the street shall be removed (do not flush with water) at the end of each work day. o Other Requirements: I. 2.. This report submitted by: ala. ~ / Revised 4 / 98 06/12/02 08:11 FAX HAMILTON CO HWY. ~~~ Carmel DOCD 141 001/001 u RE: Brookstone Subdivision, Section 2 Secondary Plat S of 146th Street / E of Ditch Road Clay Township u HAMILTON COUNTY HIGHWA y DEPARTMEN~J1J:z/:;" /. .Ii '< >\ ! . ' 4' '\ <'~\ I~( RECEIVED \f2\ (~i JUN JI 2002 rt~ \ .~~ DOCS t~:- . /\ ...., / ~'c"> m#Al~ ? r::.:/~_._ -\,.i,(, J~~1 1\\1' t!:~1 ~ ') ~,O\ June 12. 2002 Mr. Douglas S. Corey Mid-States Engineering 350 East New York Street Indianapolis. Indiana 46204 Dear Mr. Corey: This letter serves to acknowledge receipt of a transmittal received 5/24/02 containing the plans for the above-mentioned project. After reviewing the plans the Highway Department has the following comments: 1. Please remove the road and road dimensions. swale locations and asphalt path from the right of way on the plat. Only the dimensions and labels for the right of way need to be included. 2. The testing and inspection will need to be executed for Section 2 before any construction can begin. 3. Bonds/Letters of Credit will need to be submitted at the time of final plat approval. The bonds/letters of credit should match the provided estimate for the work. 4. It appears that all comments have been satisfactorily addressed for the construction plans and secondary plat. Therefore, the Highway Department request seven sets of plans for final approval. The plans should not be submitted until all comments from the Hamilton County Surveyor's office have also been addressed. If you have any questions or comments concerning this letter. please feel free to contact me at anytime. Sincerely. it 18~~ .s1e:n I~roermann Staff Engineer cc: Jon Dobosiewicz Steve Cash G:\USERS\S8\02T AC\06-12..o2brookslone.doc 1700 South 10lh Street Noblesville, In. 46060 www.co.hamilton.in.us Office (317) 773-7770 Fax (317) 776-9814 u u City of Carmel VIA FAX: 634-3576 Original by mail May 1, 2002 L1 COpy Mr. JonathanP. Moen Mid-States Engineering, LLC 350 E. New York St., Suite 300 Indianapolis, In 46204 RE: Brookstone Park of Carmel, Section 2, Secondary Plat Dear Mr. Moen: This letter is in response to your Secondary Plat filing for Brookstone Park of Carmel, Section 2. The following issues must be resolved prior to signature of the plat by the director: 1. Change "Final Plat" to "Secondary Plat." 2. Change note of "Prepared by" to "Surveyor." 3. Change note of "Developed by" to "Subdivider". 4. Change note of "Owned by" to "Owner." 5. Do pedestrian paths run through Blocks A & D? If so, please add pedestrian access easements. 6. Remove "When contracted by developer" from the Monumentation Legend. 7. Monuments must be concrete at all comers of proposed subdivision (sections included, not comer of quarter section, comer of block on perimeter). 8. Change "W l46th Street" to "West l46th Street." 9. Check "See Sheet (number) for Continuation." Some are mislabeled. 10. Note: Addresses are not required on a secondary plat. If ever a change were necessary it would require a secondary plat amendment, which is both costly and time consuming. As a matter of policy our Department recommends that addresses not be placed on the secondary plat (sheet 5 only). 11. Label Block "A", sheet seven, what is designation of small block on sheet seven, southeast comer? Label this block separately. 12. Add a marker between lots 80 & 81 on Sheet 7. 13. Have a Mylar signed by property owner and surveyor (with R.L.S. seal) prior to signature by director. 14. Forward a copy of the final review / approval letters from the following agencies: a. Hamilton County Highway b. Hamilton County Surveyor c. Soil and Water Conservation District Page 1 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 u u 15. Update dates to 2002 for signature blocks. 16. Add pond in Block "A" and identify bottom elevation, normal pool, and 100- YR flood elevation for pond(s) to plat. Please submit a revised Secondary Plat with the above-mentioned changes. Once these changes have been made and comments addressed, please produce a mylar copy for signature by this Department. Two paper copies of the plat must be filed with the mylar prior to recording. I will return the signed mylar to you for signature by the County Commissioners. Once recorded, our Department needs three paper copies and a mylar of the recorded plat. Our approval of the secondary plat ( signature) will be forthcoming upon revision of the plans according to the items listed above. Sincerely, /:c~ Planning Administrator BrookstoneParkofCarmelSec2-SP2 Page 2 ONE CMC SQUARE CARMEL, INDIANA 46032 317/571-2417 u u Dobosiewicz, Jon C From: Sent: To: Subject: Dobosiewicz, Jon C Friday, April 26, 200211 :47 AM 'Moen, Jonathan' RE: Brookstone Section II Jonathan, The application will not require Plan Commission approval. I will have an opportunity to look at the plans today and get you a comment letter out. For our approval we will need final review letters from Highway, Surveyor, etc. prior to signature of the secondary plat. Thanks, Jon -----Original Message----- From: Moen, Jonathan [mailto:jmoen@mid-stateseng.com] Sent: Friday, April 26, 2002 11:17 AM To: 'jdobosiewicz@ci.carmel.in.us' Subject: Brookstone Section II Jon: Our office re-submiited the Secondary Plat for the asbove referenced project to Lawrence Lillig on March 22, 2002. What is the status of the review and has the project been placed on a Planning Commission agenda? Thanks for your assistance. Jonathan P. Moen, P.E. Director of Site Engineering Mid-States Engineering, LLC 350 E. New York St., Suite 300 Indianapolis, IN 46204 Tel: (317) 616-2068 Fax: (317) 634-3576 jmoen@mid-stateseng.com 1 04/12/02 10:40 FAX April 12,2002 HAMILTON CO HWY. ~~~_Carmel pO~D (...) U HAMILTON COUNTY HIGHWAY DEPARTMENT ~ 001/001 ~ Mr. Douglas S. Corey Mid-States Engineering 350 East New York Street Indianapolis, Indiana 46204 ;[Y;."" -11 ',~',;0~ .-' ("~ ~ 1L,';~ft,17 '.r /?'~~~ ~bC8 <?:i? RE: Brookstone Subdivision, Section 2 Construction Plans S of 146th Street / E of Ditch Road Clay Township -~ ' :' \ ;; / -.: I i <?/ ---:..... _ -1_-."- ., .I Dear Mr. Moen: This letter serves to acknowledge receipt of a transmittal received 4/25/02 containing the plans for the above-mentioned project. After reviewing the plans the Highway Department has the following comments: 1. Please note that decorative signs, sprinkler systems, trees, landscaping mounds, light poles or other such amenities are not permitted in the right of way. 2. the secondary plat for Section 2 will need to be submitted for review and approval. 3. a testing and Inspection will need to be executed for Section 2. the necessary documents will be forwarded to SCM Development for execution. 4. Before any approvals are granted for the Secondary Plat, an Engineers Estimate broken into the following categories will need to be submitted, along with a Performance Bond or Letter of Credit in the amount of 100% of the estimate: * Stone Base * HAC Binder * HAC Surface * Concrete Curbs * Street Name and Regulatory Signs If you have any questions or comments concerning this letter, please feel free to contact me at anytime. Sincerely, ~/7--- Steven J. Broermann Staff Engineer cc: Jon Dobosiewicz /' Steve Cash G:\USERS\SB\02TAC\03-28-02keywest.doc 1700 South 10tb Street Noblesvlll~ In. 46060 www.co.hamilton.in.us Office (317) 773-7770 Fax (317) 776-9814 MriI-!itatl!! ----- EnGInEERinG 350 E. New York Uite 300 Indianapolis, IN 46204 (317) 634-6434 Phone (317) 634-3576 FAX www.mid-stateseng.com March 22, 2002 "=~~:EZ"tt'" v~ 4ft'~ '(~.'.' If <'il7~~ !<3) '. bOC&, <'4J<'AfJS \"\ ~ { ~. " ~';'^',,;- " " ~\'?:rr ~--4' \ ..z i ('51\' \ 'c, ~~ Mr. Laurence Lillig City of Carmel DOCS One Civic Square Carmel, IN 46032 Re: Brookstone Park of Carmel, Sec. II Dear Mr. Lillig: Enclosed please find two (2) sets of the Final Plat for the subject project. This project was reviewed at the March 21,2001 Technical Advisory Committee and the Construction Documents and the Final Plat have been revised accordingly. Please review the Final Plat and contact me 616-2051 if you have any questions or comments. Sincerely, VERY TRULY YOURS Y+2.~ Douglas S. Corey, P.E. Mid-States Engineering Enclosures cc: Bruce Fagan, SCM Development AUG 28 '01 01:46PM U P.U1 Xe"ton C. 'Ward, Sllrt1eyar "Pliolle (JI7) 7'7D'S4~S 'rl/X (F7' 77fi'~'b:!.S Suite r88 Ollr ;)(III11II,rm County Square )\'"Me$l'l/(r, IlllliuRn 4';0';0.;12JC' August 28, 2001 38 - c:::5 L \SP Re: Brookstone Park. Sec. 2 I have reviewed the plans for this project and have the following comments. Procedunlltems: 1. Please provide the signed fonn to make the stonn sewers regulated. 2. Provide the signed Non-enforcement Permit fonn with the appropriate check. 3. Please forward an engineers estimate or copy of the contract for 100% of the construction COsts for storm sewers (including SSD), erosion control, and monuments and markers. 4. Submit original letters of credit or bonds for the above amounts. ConstruettoD Plus: S. A 6" field tile has been located south of the intersection of Towne Road and 146\11. This field tile crosses Town Road and comes onto this site 3' north of the existing culvert. There may be further discussions regarding this tile. 6. The other construction plan items previously discussed have been satisfactorily addressed. If you have any questions or if the plans change please contact this office at 776-8495. --~ .. '" c::lz ~ Steven T. Cash . Plan Reviewer Cc: Cannel DOCS SCS Co. Hwy u (,) City of Carmel Fire Department Headquarters 2 CIVIC SQUARE CARMEL, INDIANA 46032 317/571.2600 ,"-; ;' RE: Brookstone Park of Carmel; Section 2 !fiJ~(;tn~ NAN >';i}iJI~7PJ 22 2001 Docs Jonathan Moen Mid-States Engineering 350 East New York St. Indianapolis, IN 46206 LETTER OF APPROVAL & The undersigned has reviewed the proposed plans for Brookstone Park of Carmel; Section 2 and has approved the plans subject to the following: 1. After review of this project, I have no further conditions or comments at this time. 2. 3. 4. 5. 6. Please respond to the above noted condition(s) in writing and submit to our office prior to the scheduled Technical Advisory Meeting for this project. Date: March 6. 2001 By: Gary Hoyt. Fire Marshal Carmel Fire Department Fire Prevention Saves Lives and Property u u LiIIig, Laurence M From: Sent: To: Cc: Subject: Jay Alley [Jay@ctrwd.org] Tuesday, March 20, 2001 9:55 AM LLillig@cLcarmel.in.us JKendall@cLcarmel.in.us; Candy Feltner; rlauritsen@slmaco.com . Re: Carmel/Clay Revised TAC Agenda - March 21, 2001 H4~~!:ifI~1tJ 20 2(}O/ DocS \. Hello Laurence: Following are CTRWD comments on the agenda items in our service area for tomorrow's meeting. Please feel free to copy and distribute this email and attach it to your meeting minutes. Parkwood West ADLS We have no comments relative to ADLS approval but there remain a number of issues to work out with the developer regarding sanitary sewer service. A lift station is required to service this property; the force main must go under 1465 to tie into gravity sewers to the north so a lengthy State approval process can be anticipated. Building permits should NOT be issued without the District's connection permit. Brookstone Park of Carmel, Section 2 The plans are being reviewed by the District's consulting engineers, Samuel L. Moore & Associates, and will be submitted to IDEM for State permit approval when that review is completed. Building permits should NOT be issued without the District's connection permit. Pahud Residential Subdivision We have no comments about the Primary Plat but the developer needs to contact the District to discuss how this parcel will receive sanitary sewer service since no construction drawings have been provided for review by the District. Building permits should NOT be issued without the District's connection permit. East 96th Street Office Campus The plans have been reviewed by the District's consulting engineers, Samuel L. Moore & Associates, and they have requested additional revisions before the District can submit them to IDEM for State permit approval. The developer's engineer has been advised of the plan deficiencies. Building permits should NOT be issued without the District's connection permit. Woods of Williams Creek subdivision (Primary Plat) We have no comments about the Primary Plat but the developer needs to contact the District to discuss how this parcel will receive sanitary sewer service since construction drawings have not been provided for review by the District. Building permits should NOT be issued without the District's connection permit. We are a member of the IUPPS underground locate network so call1-80Q-382-5544 before you dig! Please feel free to contact me if you have questions or need additional information. Please check our NEW website for construction specification and permit information and let us know if there is other information we can provide which would be useful. Thanks! Jay W. Alley, Utility Manager Clay Township Regional Waste District Hamilton County, IN, USA http://www.ctrwd.org/ 1 C arJrJrJi e I u u ~ ~ Ittl( ~~~!fh Ii' ~b oOccS' <'t'~ March 14,2001 Mr. Jim Drouin Mid-States Engineering 350 E. New York Street Indianapolis, IN 46204 RE: Bookstone Park of Carmel Section 2 Job No.: 111-1123 Dear Mr. Drouin: I have received and reviewed the plans of the above-mentioned project. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. Respectfully, ~)).~~ Michael D. Fogal . Chief of Police MDF:vb cc: Dept. of Community Services (317) 571-2500 A Nationally Accredit rcement Agency FAX (317) 571-2512 03/12/01 09:53 FAX HAMILTON CO BWY. ~~~ Carmel DOeD o ~ 0011001 ~~~, @~ 0~rc~ ~..--... ~\ ~ i -~ r"'~ \ \.:.::..-,: Iv"-'> J\l\jY- -.<~_'I ~>. - -,., -f / "- ~//~' ~ "'~" tJ ~ t~\ I ' , ,~ I--i' ,I 1,(;Xi\ 0.. -o,~~"1- I --~\ ",,-,, A ~" "(\~ '- \ /.'\ e~ \<:~" 0:::'<"'/ </r:;-;-____ ."\ i{j '/ ",/! i I Q,' \\ ,/Y ""...-L.. Jcj~)../' Match 12, 2001 Mr. Jonathan Moen Mid-States Engineering 350 East New York Street Indianapolis, Indiana 46204 RE: Broolcstone Park of Cannel, Section 2 Construction Plans and Secondary Plat S of 146111 Street I E of Ditch Road Clay Township Dear Mr. Moen: This letter selVes to acknowledge receipt of a transmittal containing the plans for BrookStone Park of Cannel, SeClllon 2. After reviewing the plans, the Highway Department has the following comments: SecondalY PI. 1. The sign of block for the Hamilton County Board of Commissioners needs to be revised to show that steve Dillinger is now the Board President. 2. Are the street names on the plat correct? 3. Before 'any approvals are granted for the Secondary Plat, an Engineers Estimate broken into the following categOries will need to be submitted, along with a Performance Bond or Letter of Credit In the amount of 100% of the estimate: Stone Base, HAC Binder, HAC Surface, Concrete Curbs and street Name! and Regulatory Signs. . Construction Plans 4. On sheet 3. please note that all right of way must be cleared. 5. Show the grading of the roadslde ditch along 146" street. 6. Show temporary gravel entrances on the Erosion Control Plan. 7. Please note that decorative signs, sprinkler systems, trees. landsaaplng mounds, light poles or Other such amenities are not pennltted In the right ofway. 8. Please Include a note stating that no water main valves are to placed within the streets. 9. Please provide a note stating that the pavement shall be saw cut to provide a smooth transition at all connedions to existing pavement. If you have any comments or questions regarding this letter or project, please teel free to contact me at any time. Thank YO" for your attention and cooperation. ~ince Iy, ,j':'~ .g~-- .... J~rmann Staff Engineer cc: l.8un!nce WlIIg, Jr. Steve Cash John South G:\USSU\Sa\2l101 TlI"m-l2-4\.... wpcI 1117 PLEASANT STREET NOBLESVILLE, INDIANA 48080 (317) 713-7170 Mid. tat !i ----- EnGinEERinG (..) u Transmittal City of Carmel De artment of Communi Services -l N:rc~#~rgfG 5 2001 Docs/ /r'I~: (\Q;Y'~ Mid-States Engineering 350 East New York Street Indianapolis. IN 46204 Phone: 317 634-6434 To: 3/5/2001 Address: One Civic Square City, ST, Zip: Carmel, IN 46032 Attention: Lawrence lillig Project: Brookstone Park of Carmel Section 2 Re: Secondary Plat Approval Job No.: 111-1123 Mail 0 Messenger ~ Express 0 Pick-Up 0 We are sending herewith: Check Description Copies ~ Application for Secondary Plat or Replat ~ 2 sets of construction plans ~ Brookstone Park of Carmel Section 2 Final Plat (1 mylar & 2 paper copies) o o o o o o o The information as per your request o Please review and respond ~ See remarks below Remarks: The final plats for Sections 1 & 2 were previously approved on 11/3/99. The approval for Section 2 has expired, therefore, a new application is hereby submitted for review. If you have questions, please contact me at 616-2065. Thank you. From: Jim Drouin, Permit Coordinator ~ Correspondence CC: Bruce fagan, SCM Development, Inc. Jonathan Moen, Site Manager Permit file