Loading...
HomeMy WebLinkAboutAvantPhase2_CFD_Response-Combined 2 West Main Street, Carmel, IN 46032 317.810.1502 www.studiomarchitecture.net City of Carmel CFD Plan Comments Avant Apartments Phase 2 Studio M Project No. #20011 Date Received: 09/08/2021 Date of Response: 09/21/2021 1. Please refer to revised Fire Protection Sheets (attached) showing locations of standpipes. 2. As discussed via email on 09/20/2021, we are seeking a variance for this Item to allow for the system to be installed as submitted. Appropriate documentation will be forwarded once available. 3. The elevator designed for this project can accommodate an ambulance stretcher. See attached confirmation from KONE. 4. The construction team at Edward Rose will accomplish this through proper construction sequencing. 5. The construction team at Edward Rose will accomplish this through proper construction sequencing. 6. The full scope of the Fire Protection system will be finalized during construction. They will be submitted to the State and City as soon as available. The project will satisfy the stipulations expressed on the Cover Sheet A000. 7. Please refer to revised Fire Protection Sheets (attached) showing locations of standpipes. At least one standpipe shall be made available for use during construction. Issued By Architect: _____________________________________________________________________________________ Signature Printed Name & Title Date Alex D Marsh- Architect Sept. 21, 2021 Max Travel (8) 150 ft. (45.7 m) Max Landings (8) 15 Speed (8) 150, 200, 350 fpm (.75, 1.0, 1.78 m/s) Car Height F 8, 9 or 10 ft. (2438, 2743 or 3048 mm) Entrance Height G 7, 8 or 9 ft. (2134, 2438 or 2743 mm)Front OpeningFront & Reverse OpeningKONE MONOSPACE ® 500 A A SEISMIC B B SEISMIC C D E CAPACITY LBS. (kg)OPENING TYPE (mm)HOISTWAY WIDTH (mm)HOISTWAY WIDTH (mm)HOISTWAY DEPTH (mm)HOISTWAY DEPTH (mm)INTERIOR WIDTH (mm)INTERIOR DEPTH (mm)DOOR WIDTH (mm)STRETCHER ACCOMMODATION(10) 2000 (907)SSP 7'-6" (2286)7'-11" (2413)5'-9" (1753)5'-9 1⁄2" (1766)5'-8 57⁄64" (1750)4'-4 27⁄64" (1332)3'-0" (914)No2500 (1134)SSP-CO 8'-6" (2591)8'-11" (2718)5'-9" (1753)5'-9 1⁄2" (1766)6'-8 29⁄32" (2055)4'-4 27⁄64" (1332)3'-6" (1067)No 2500 IBC (1134)(10)SSP 8'-11" (2718)9'-5" (2870)5'-9" (1753)5'-9 1⁄2" (1766)6'-11 47⁄64" (2127)4'-4 27⁄64" (1332)3'-6" (1067)Yes 3000 (1361)SSP-CO 8'-6" (2591)8'-9" (2667)6'-3" (1905)6'-3 1⁄2" (1918)6'-5 19⁄32" (1971)5'-0 29⁄64" (1536)3'-6" (1067)No 3500 (1588)SSP-CO 8'-6" (2591)8'-9" (2667)6'-11" (2108)6'-11" (2108)6'-5 19⁄32" (1971)5'-6 5⁄8" (1693)3'-6" (1067)Yes 4000 (1814)CO 9'-8" (2947)9'-8" (2947)6'-11" (2108)6'-11" (2108)7'-6 45⁄64" (2304)5'-6 5⁄8" (1693)4'-0" (1219)Yes 4000 (1814)2SP 7'-8" (2337)7'-8" (2337)9'-2" (2794)9'-2" (2794)5'-7 3⁄32" (1704)7'-7 29⁄32" (2335)4'-0" (1219)Yes 4500 (2041)2SP 7'-8" (2337)7'-8" (2337)9'-8" (2946)9'-8" (2946)5'-7 3⁄32" (1704)8'-1 13⁄16" (2485)4'-0" (1219)Yes5000 (2268)(9)2SP 7'-10" (2388)7’-10" (2388)10'-2 1⁄2" (3112)10'-2 1⁄2" (3112)5'-7 3⁄32" (1704)8'-9 21⁄32" (2684)4'-6" (1372)(9)Yes5000 AIA (2268)2SP 7'-10 5⁄16" (2396)7'-11 1⁄2" (2426)10'-5 1⁄16" (3177)10'-5 1⁄16" (3177)5’-9 13⁄32" (1763)9'-0 7⁄16" (2755)4'-6" (1372)(9)Yes 2000 (907)SSP 7'-6" (2286)7'-11" (2413)6'-3 3⁄4" (1924)6'-3 3⁄4" (1924)5'-8 57⁄64" (1750)4'-4 27⁄64" (1332)3'-0" (914)No2500 (1134)SSP-CO 8'-6" (2591)8'-11" (2718)6'-3 3⁄4" (1924)6'-3 3⁄4" (1924)6'-8 29⁄32" (2055)4'-4 27⁄64" (1332)3'-6" (1067)No 2500 IBC (1134)(5)(10)SSP 8'-11" (2718)9'-5" (2870)6'-3 3⁄4" (1924)6'-3 3⁄4" (1924)6'-11 47⁄64" (2127)4'-4 27⁄64" (1332)3'-6" (1067)Yes 3000 (1361)SSP-CO 8'-6" (2591)8'-9" (2667)6'-11 3⁄4" (2127)6'-11 3⁄4" (2127)6'-5 19⁄32" (1971)5'-0 29⁄64" (1536)3'-6" (1067)No 3500 (1588)(10)SSP-CO 8'-6" (2591)8'-9" (2667)7'-6" (2286)7'-6" (2286)6'-5 19⁄32" (1971)5'-6 5⁄8" (1693)3'-6" (1067)Yes*4000 (1814)CO 9'-8" (2947)9'-8" (2947)7'-6" (2286)7'-6" (2286)7'-6 45⁄64" (2304)5'-6 5⁄8" (1693)4'-0" (1219)Yes 4000 (1814)2SP 7'-8" (2337)7'-8" (2337)10'-2 1⁄8" (3102)10'-2 1⁄8" (3102)5'-7 3⁄32" (1704)7'-7 29⁄32" (2335)4'-0" (1219)Yes4500 (2041)2SP 7'-8" (2337)7'-8" (2337)10'-8 1⁄16" (3252)10'-8 1⁄16" (3252)5'-7 3⁄32" (1704)8'-1 13⁄16" (2485)4'-0" (1219)Yes5000 (2268)(9)2SP 7'-10" (2388)7’-10" (2388)11'-3 7⁄8" (3451)11'-3 7⁄8" (3451)5'-7 3⁄32" (1704)8'-9 21⁄32" (2684)4'-6" (1372)(9)Yes 5000 AIA (2268) 2SP 7'-10 5⁄16" (2396)7'-11 1⁄2" (2426)11'-6 11⁄16" (3522)11'-6 11⁄16" (3522)5'-9 13⁄32" (1763)9'-0 7⁄16" (2755)4'-6" (1372)(9)YesPASSENGERPASSENGERSERVICESERVICE Visit kone.us for the latest project-specific details, CAD drawings, BIM models, CSI specifications, electrical data, reaction loads and building access requirements. CONFIGURATIONS & DIMENSIONS CONTROL SPACE (11)J K L CAPACITYLBS. (kg)CONTROLLER SPACE WIDTH(mm)DEPTH (mm)DOOR WIDTH (mm) 2000 to 5000 AIA (907 to 2268)remote closet 4'-0" (1219)(11)1'-8" (508)(11)3'-6" (1067)(11) 2000 to 5000 AIA (907 to 2268)adjacent or remote room 5'-0" (1524)dimension (B)3'-0" (914)(11) CLEAR OVERHEAD AND PIT DEPTH 150 FPM (0.75 M/S)200 FPM (1.00 M/S)350 FPM (1.78 M/S) CAPACITYLBS. (kg)PIT DEPTH(mm)CLEAROVERHD (mm)PIT DEPTH(mm)CLEAROVERHD (mm)PIT DEPTH(mm)CLEAROVERHD (mm) 2000 to 2500 (907 to 1134)5'-0" (1524)13'-0" (3962)5'-0" (1524)13'-4"(3988)5'-6" (1676)13'-6" (4115) 3000 to 3500 (1361 to 1588) 5'-0" (1524) 13'-0" (3962) 5'-0" (1524) 13'-4" (3988) 5'-6" (1676) 13'-6" (4115) 4000 to 5000 AIA (1814 to 2268) 5'-0" (1524) 13'-8" (4166) 5'-0" (1524) 13'-8" (4166) 5'-6" (1676) 13'-8" (4166) H I Notes (1) A hoist beam (by KONE) is required for installation (by others). Dimension H reflects clear under hoist beam. (2) If an Emergency Battery Device (EBD) is required, please contact your KONE Sales Professional for further detail regarding dimensions H , J , and L . (3) The published hoistway dimension represents the optimum clear inside requirements and maybe reduced by up to 2” (51mm). However, this may result in construction inefficiencies. (4) The published interior width C and depth D dimensions represent the minimum clear inside requirements without raised panels. For interior width C and depth D dimensions with raised panels please contact a KONE Sales Professional. (5) 2500 LB. IBC reverse opening must be diagonally opposed. For all other front and reverse opening configurations, hoistway width A is valid for directly opposed openings only. If diagonally opposed openings are required, please contact your KONE Sales Professional. (6) The published minimum pit depth I dimension is based upon slide guides. For minimum pit depth I with roller guides please contact a KONE Sales Professional. (7) All dimensions are based on an 8'-0" (2438 mm) cab with a 7'-0" (2134 mm) door. Alternate car and door heights are available, but will affect dimension H. (8) 150 fpm (.75 m/s) only available up to 85 ft. (25 m) of travel and 10 landings. 200 fpm (1.00 m/s) available up to 100 ft. (30.5 m) of travel and 12 landings. (9) 4'-0" (1219 mm) door width also available. (10) Stretcher accessibility based on international building code (IBC) and California Building Code specified, 24 inch by 84 inch stretcher — with 5-inch radius corners. Elevator car must utilize a side slide door with the exception of the 4000 LB. passenger shaped car. In Canada (NBCC) 2500 LB. and larger elevators with single slide doors meet Canadian stretcher rule of 2010mm x 610mm. (11) If IBC 2018 or ASME A17.1-2019/CSA B44-19 code is applicable, contact your local sales professional for controller space configurations. A *3,500 LB. Front / reverse elevators needs to have diagonal opposed doors and a wider hoistway width of 8’-9” (8’-11” if seismic) to accommodate a stretcher. Please contact a KONE Sales Professional for more information. Plan views Section view Adjacent or Remote Control Room (option 2) B L J (2) Remote Control Closet (option 1) K L J (2) Integral Control Solution (standard) A C D B E E (1) (6) (11) H F G G I (12) (2) (7) TRAVEL SF2982 Rev 1119 This publication is for general informational purposes only. KONE Inc. reserves the right to alter the product design and specifications without prior notice. Minor differences between printed and actual colors may exist. KONE MonoSpace® is a registered trademark of KONE Corporation. Copyright © 2019 KONE Inc. (4) (4) Notes, continued: Please consult a KONE Sales Professional regarding: (11) Pit depths less than 5'-0" (1524 mm). (12) Occupied space beneath the hoistway. (13) Local code variations when utilizing the integrated, integral and remote closet options. KONE kone.us EW3EW3EW3EW2bEW3EW3EW3UPMDBP-1 RPBP-1A RPBP-1B ET DCVA-1 WATER METERS WHA-B WC-2 WC-2 L-2L-2 2" FD-1 2" FD-1 SK-2 WD-1 WSB-1 2" OSD-1 WH-1 WH-1 WH-1 FCO UNIT C2 2 UNIT C1 3 UNIT A1 4 UNIT A1 5 UNIT A1 6 UNIT B1 7 UNIT A1 8SOCIAL HUB 101 FOCUS BOOTH 104 FOCUS BOOTH 105 FOCUS BOOTH 106FOCUS BOOTH 107 CONFERENCE ROOM 103 CONFERENCE ROOM 102 RESTROOM 108 RESTROOM 109 MAIL CENTER 111 DEMARC 116 WATER 117 UNIT A1 71 1 1 1 1 1 1 1 1 1313 2 3 2 3 2 3 13 13 13 13 13 13 2 3 2 3 2 3 13 13 2 3 23 23 2 3 2 3 4 5 4 5 4 5 12 13 4 5 12 5 4 12 5 4 12 12 12 5 4 12 5 4 12 FCO DWH-3 TET-3 4" W4" W 4" W W14 4" W4" W 4" W W14 4" W 4" W4" W CO 4" W WW 14 4" W 4" W WW4" W 4" W W 4" W 14 1/2" HW 1/2" CW 1/2" CW 1/2" CW 1/2" CW 3" FD-2 3" FD-2 2" V 1 1/2" V 1/2" HW 2" V 2" V 15 15 16 11 11 4" W4" W 4" W W W14 2" V 4" W W 14 4" W 14 4" W 4" WW 14 14 10 6 9 7 8 4" FD-2 12 3" W 12 3" W 3" W 4" W 3" W 4" WW 1/2" CW 3/4" CW 2" CW 2" CW 1/2" CW 17 1 1/2" V 2" V 18 F FFFFF F ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONSKBSO Consulting1344 S Rangeline Rd. Suite 202CARMEL, INDIANA 46032P: 317-344-8044PERMIT SET APRIL 28TH, 2021 20005THE AVANT PHASE IIP101AFIRST FLOORPLUMBING PLAN -AREA ACARMEL,INSHEET KEYNOTES 1 3/4" COLD WATER FROM ABOVE IN WALL. 2 4" WASTE STACK IN WALL. 3 4" VENT STACK IN WALL. 4 3" WASTE STACK IN WALL. 5 2" VENT STACK IN WALL. 6 WET-PIPE FIRE SUPPRESSION SYSTEM. FIRE PROTECTION CONTRACTOR TO DESIGN, FURNISH AND INSTALL A COMPLETE FIRE SUPPRESSION SYSTEM FOR ENTIRE BUILDING PER NFPA 13. 7 6" INCOMING FIRE SERVICE WATER LINE. 8 6" INCOMING DOMESTIC WATER SERVICE LINE. 9 4" FIRE LINE DOWN TO POINT BELOW FLOOR TO FIRE DEPARTMENT CONNECTION (FDC). SEE SITE/CIVIL DRAWINGS FOR EXACT LOCATION. 10 4" COLD WATER UP IN CORNER INTO CHASE ABOVE. 11 3/4" COLD WATER FROM ABOVE IN WALL. 12 3" WASTE FROM ABOVE. 13 4" WASTE FROM ABOVE. 14 4" WASTE DOWN IN WALL TO POINT BELOW FLOOR SLAB. 15 1/2" COLD WATER AND 1/2" HOT WATER DROP IN WALL. 1-1/2"V RISE. 2"W DOWN. 16 2"CW DROP IN WALL. 2"V RISE IN WALL. 4"W DOWN. 17 1/2"CW DROP IN WALL. 1-1/2"V RISE IN WALL. 2"W DOWN. 18 FIRE PROTECTION STANDPIPE IN CORNER OF STAIRWELL WITH FIRE HOSE CONNECTIONS AT EACH INTERMITTENT LANDING IN STAIRWELL. N 1/8" = 1'-0" FIRST FLOOR PLUMBING PLAN - AREA A1 GENERAL NOTES A REFER TO DRAWING P000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS, LEGENDS, ABBREVIATIONS, ADDITIONAL GENERAL NOTES AND PLUMBING NOTES. B REFER TO P500 SERIES DRAWINGS FOR PLUMBING DETAILS. C REFER TO P600 SERIES DRAWINGS FOR PLUMBING SCHEDULES. D PROVIDE CEILING ACCESS PANELS AT SHUT-OFF VALVES, CONTROL VALVES, DRAIN VALVES, ETC. THAT ARE LOCATED ABOVE A NON-LAY-IN OR ACCESSIBLE CEILING. E INSTALL ALL PIPING AS HIGH AS POSSIBLE. F ALL PIPING, INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS, AND ADHESIVES ARE TO BE PLENUM RATED WITHIN RETURN AIR PLENUMS, HAVING A FLAME-SPREAD INDEX OF 25 OR LESS, AND A SMOKE-DEVELOPED INDEX OF 50 OR LESS, AS REQUIRED BY CODE. #DESCRIPTION DATE 1 ASI-01 8/24/2021 2 CITY REVIEW COMMENTS 9/17/2021 EWC/BF-1 2 2 EW3UPWH-1 UNIT B1 9 UNIT B1 10 UNIT B1 12 UNIT A1 13 BIKE GARAGE 114 ELECTRICAL 115 UNIT A1 91 1 1 11 1 2 3 2 3 10 5 4 2 35 4 23 2 3 5 4 2 3 999 5 4 10 10 9 10 5 4 2323 10 10 10 2 3 ECO 3/4" CW 7 4" W W11 4" W 4" W 4" W W1111W4" W 4" W 4" W 4" W W 4" W 11W11 6 8 4" W 4" W 4" W W11 WH-1 4" W 5 4 2 3 2 3 5 4 WH-1 7 1 4" W F F FF F12 ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONSKBSO Consulting1344 S Rangeline Rd. Suite 202CARMEL, INDIANA 46032P: 317-344-8044PERMIT SET APRIL 28TH, 2021 20005THE AVANT PHASE IIP101BFIRST FLOORPLUMBING PLAN -AREA BCARMEL,INN 1/8" = 1'-0" FIRST FLOOR PLUMBING PLAN - AREA B1 SHEET KEYNOTES 1 3/4" COLD WATER FROM ABOVE IN WALL. 2 4" WASTE STACK IN WALL. 3 4" VENT STACK IN WALL. 4 3" WASTE STACK IN WALL. 5 2" VENT STACK IN WALL. 6 1-1/2" COLD WATER FROM ABOVE IN WALL. 7 3/4" COLD WATER DROP IN WALL. 8 3/4" COLD WATER FROM ABOVE IN WALL. 9 3" WASTE FROM ABOVE. 10 4" WASTE FROM ABOVE. 11 4" WASTE DOWN IN WALL TO POINT BELOW FLOOR SLAB. 12 FIRE PROTECTION STANDPIPE IN CORNER OF STAIRWELL WITH FIRE HOSE CONNECTIONS AT EACH INTERMITTENT LANDING IN STAIRWELL. GENERAL NOTES A REFER TO DRAWING P000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS, LEGENDS, ABBREVIATIONS, ADDITIONAL GENERAL NOTES AND PLUMBING NOTES. B REFER TO P500 SERIES DRAWINGS FOR PLUMBING DETAILS. C REFER TO P600 SERIES DRAWINGS FOR PLUMBING SCHEDULES. D PROVIDE CEILING ACCESS PANELS AT SHUT-OFF VALVES, CONTROL VALVES, DRAIN VALVES, ETC. THAT ARE LOCATED ABOVE A NON-LAY-IN OR ACCESSIBLE CEILING. E INSTALL ALL PIPING AS HIGH AS POSSIBLE. F ALL PIPING, INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS, AND ADHESIVES ARE TO BE PLENUM RATED WITHIN RETURN AIR PLENUMS, HAVING A FLAME-SPREAD INDEX OF 25 OR LESS, AND A SMOKE-DEVELOPED INDEX OF 50 OR LESS, AS REQUIRED BY CODE. #DESCRIPTION DATE 1 CITY REVIEW COMMENTS 9/17/2021 1 1 EW3EW3EW3EW3EW2bEW3EW3EW3EW3EW3UNIT C2 14 UNIT C1 16 UNIT A1 17 UNIT A1 18 UNIT A1 19 UNIT B3 20 UNIT A1 21 UNIT B1 22 UNIT A1 23 UNIT B1 34 UNIT B1 35 UNIT B2 36 DATA 201 DATA 202 ELECTRICAL 203 MECH 406 MECH 407 UNIT A1 92 UNIT A1 93 UNIT A1 94 8 8 1 8 8 8 8 1 8 1 1 1 1 8 1 1 2 323 2 3 2 3 2 3 2 3 2 3 2 3 2 32 3 23 2 3 2 3 2 3 2 3 2 3 2 3 23 23 2 3 2 3 4 5 4 5 4 5 45 2 3 4 5 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 1 1/2" CW 6 4" CW 1 1/2" CW 4" CW 7 3/4" CW 1 1/2" CW 1 1/4" CW 4" CW 4" CW 1 1/2" CW 1 1/2" CW4" CW 1 1/2" CW 4" CW 3/4" CW 1 1/2" CW 2" CW 4" CW 1 1/4" CW 4" CW 4" CW1 1/4" CW 9 7 1 1/4" CW 1 1/2" CW4" CW 4" CW 1 1/4" CW 1 1/4" CW 4" CW 4" CW 4" CW 1 1/4" CW 1 1/4" CW 4" CW 4" CW 4" CW 3" FD-2 3" FD-2 3" W 10 3" W10 5 4 11 ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONSKBSO Consulting1344 S Rangeline Rd. Suite 202CARMEL, INDIANA 46032P: 317-344-8044PERMIT SET APRIL 28TH, 2021 20005THE AVANT PHASE IIP102ASECOND FLOORPLUMBING PLAN -AREA ACARMEL,INSHEET KEYNOTES 1 1-1/4" COLD WATER FROM BELOW FLOOR IN WALL. 1" COLD WATER UP IN WALL ABOVE. 2 4" WASTE STACK IN WALL. 3 4" VENT STACK IN WALL. 4 3" WASTE STACK IN WALL. 5 2" VENT STACK IN WALL. 6 4" COLD WATER FROM BELOW IN CORNER CHASE. 7 3/4" COLD WATER DOWN IN WALL TO POINT BELOW FLOOR SLAB. 8 1" COLD WATER DROP IN WALL. 3/4" COLD WATER DOWN TO POINT BELOW FLOOR SLAB. 1" COLD WATER UP IN WALL ABOVE. 9 2" COLD WATER DOWN IN WALL TO POINT BELOW FLOOR SLAB. 10 3" WASTE UP. 11 FIRE PROTECTION STANDPIPE IN CORNER OF STAIRWELL WITH FIRE HOSE CONNECTIONS AT EACH INTERMITTENT LANDING IN STAIRWELL. N 1/8" = 1'-0" SECOND FLOOR PLUMBING PLAN - AREA A1 GENERAL NOTES A REFER TO DRAWING P000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS, LEGENDS, ABBREVIATIONS, ADDITIONAL GENERAL NOTES AND PLUMBING NOTES. B REFER TO P500 SERIES DRAWINGS FOR PLUMBING DETAILS. C REFER TO P600 SERIES DRAWINGS FOR PLUMBING SCHEDULES. D PROVIDE CEILING ACCESS PANELS AT SHUT-OFF VALVES, CONTROL VALVES, DRAIN VALVES, ETC. THAT ARE LOCATED ABOVE A NON-LAY-IN OR ACCESSIBLE CEILING. E INSTALL ALL PIPING AS HIGH AS POSSIBLE. F ALL PIPING, INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS, AND ADHESIVES ARE TO BE PLENUM RATED WITHIN RETURN AIR PLENUMS, HAVING A FLAME-SPREAD INDEX OF 25 OR LESS, AND A SMOKE-DEVELOPED INDEX OF 50 OR LESS, AS REQUIRED BY CODE. #DESCRIPTION DATE 1 CITY REVIEW COMMENTS 9/17/2021 1 1 EW3UNIT B1 24 UNIT B1 25 UNIT A1 26 UNIT C2 28 UNIT A2 29 UNIT B1 30 UNIT A1 39 UNIT B1 95 UNIT A1 96 UNIT B1 97 UNIT A1 98 1 2 3 5 4 8 1 1 8 1 8 1 8 8 1 2 3 2 3 2 3 5 4 5 4 2 3 2 3 5 4 23 2 3 5 4 2 3 5 4 5 4 5 4 5 4 2 3 23 5 4 2 3 5 4 2323 2 3 2 3 2 3 2 3 3/4" CW 1 1/2" CW 1 1/4" CW 4" CW 4" CW 1 1/2" CW 1 1/4" CW 4" CW 3" CW 1 1/2" CW 1 1/4" CW 3" CW 1 1/2" CW 2 1/2" CW 1 1/4" CW 1 1/2" CW 2 1/2" CW 2" CW 1 1/2" CW 7 6 1 1/4" CW 1 1/4" CW 1 1/4" CW 9 ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONSKBSO Consulting1344 S Rangeline Rd. Suite 202CARMEL, INDIANA 46032P: 317-344-8044PERMIT SET APRIL 28TH, 2021 20005THE AVANT PHASE IIP102BSECOND FLOORPLUMBING PLAN -AREA BCARMEL,INSHEET KEYNOTES 1 3/4" COLD WATER DROP IN WALL. 1" COLD WATER UP IN WALL ABOVE. 2 4" WASTE STACK IN WALL. 3 4" VENT STACK IN WALL. 4 3" WASTE STACK IN WALL. 5 2" VENT STACK IN WALL. 6 3/4" COLD WATER DOWN IN WALL TO POINT BELOW FLOOR SLAB. 7 1-1/2" COLD WATER DOWN IN WALL TO POINT BELOW FLOOR SLAB. 8 1" COLD WATER DROP IN WALL. 3/4" COLD WATER DOWN TO POINT BELOW FLOOR SLAB. 1" COLD WATER UP IN WALL ABOVE. 9 FIRE PROTECTION STANDPIPE IN CORNER OF STAIRWELL WITH FIRE HOSE CONNECTIONS AT EACH INTERMITTENT LANDING IN STAIRWELL. N 1/8" = 1'-0" SECOND FLOOR PLUMBING PLAN - AREA B1 GENERAL NOTES A REFER TO DRAWING P000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS, LEGENDS, ABBREVIATIONS, ADDITIONAL GENERAL NOTES AND PLUMBING NOTES. B REFER TO P500 SERIES DRAWINGS FOR PLUMBING DETAILS. C REFER TO P600 SERIES DRAWINGS FOR PLUMBING SCHEDULES. D PROVIDE CEILING ACCESS PANELS AT SHUT-OFF VALVES, CONTROL VALVES, DRAIN VALVES, ETC. THAT ARE LOCATED ABOVE A NON-LAY-IN OR ACCESSIBLE CEILING. E INSTALL ALL PIPING AS HIGH AS POSSIBLE. F ALL PIPING, INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS, AND ADHESIVES ARE TO BE PLENUM RATED WITHIN RETURN AIR PLENUMS, HAVING A FLAME-SPREAD INDEX OF 25 OR LESS, AND A SMOKE-DEVELOPED INDEX OF 50 OR LESS, AS REQUIRED BY CODE. #DESCRIPTION DATE 1 CITY REVIEW COMMENTS 9/17/2021 1 1 EW3EW3EW3EW3EW2bEW3EW3EW3EW3EW3DNUPUNIT C2 99 UNIT A1 100 UNIT B3 118 UNIT A1 119 UNIT A1 120 UNIT A1 121 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 323 2 3 2 3 2 3 2 3 2 3 2 3 2 32 3 23 2 3 2 3 2 3 2 3 2 3 2 3 23 23 2 3 2 3 4 5 4 5 4 5 45 2 3 4 5 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 3" FD-2 3" FD-2 3" W 6 6 3" W UNIT B1 146 UNIT B2 154 UNIT A1 144 UNIT B1 153 UNIT C1 142 UNIT B1 152 5 4 5 4 7 ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONSKBSO Consulting1344 S Rangeline Rd. Suite 202CARMEL, INDIANA 46032P: 317-344-8044PERMIT SET APRIL 28TH, 2021 20005THE AVANT PHASE IIP103ATHIRD FLOORPLUMBING PLAN -AREAACARMEL,INSHEET KEYNOTES 1 1" COLD WATER FROM BELOW FLOOR IN WALL. 3/4" COLD WATER UP IN WALL ABOVE. 2 4" WASTE STACK IN WALL. 3 4" VENT STACK IN WALL. 4 3" WASTE STACK IN WALL. 5 2" VENT STACK IN WALL. 6 3" WASTE UP. 7 FIRE PROTECTION STANDPIPE IN CORNER OF STAIRWELL WITH FIRE HOSE CONNECTIONS AT EACH INTERMITTENT LANDING IN STAIRWELL. N 1/8" = 1'-0" THIRD FLOOR PLUMBING PLAN - AREA A1 GENERAL NOTES A REFER TO DRAWING P000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS, LEGENDS, ABBREVIATIONS, ADDITIONAL GENERAL NOTES AND PLUMBING NOTES. B REFER TO P500 SERIES DRAWINGS FOR PLUMBING DETAILS. C REFER TO P600 SERIES DRAWINGS FOR PLUMBING SCHEDULES. D PROVIDE CEILING ACCESS PANELS AT SHUT-OFF VALVES, CONTROL VALVES, DRAIN VALVES, ETC. THAT ARE LOCATED ABOVE A NON-LAY-IN OR ACCESSIBLE CEILING. E INSTALL ALL PIPING AS HIGH AS POSSIBLE. F ALL PIPING, INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS, AND ADHESIVES ARE TO BE PLENUM RATED WITHIN RETURN AIR PLENUMS, HAVING A FLAME-SPREAD INDEX OF 25 OR LESS, AND A SMOKE-DEVELOPED INDEX OF 50 OR LESS, AS REQUIRED BY CODE. #DESCRIPTION DATE 1 CITY REVIEW COMMENTS 9/17/2021 1 1 EW3DNUPUNIT A1 122 UNIT B1 123 UNIT A1 124 UNIT B1 125 UNIT A1 126 UNIT A1 127 UNIT B1 128 1 2 3 5 4 1 1 1 1 1 1 1 1 1 1 23 2 3 2 3 5 4 5 4 2 3 2 3 5 4 23 2 3 5 4 2 3 5 4 5 4 5 4 5 4 2 3 23 5 4 2 3 5 4 2323 2 3 2 3 23 2 3 UNIT A2 151 UNIT C2 150 UNIT B1 149 UNIT B1 148 6 ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONSKBSO Consulting1344 S Rangeline Rd. Suite 202CARMEL, INDIANA 46032P: 317-344-8044PERMIT SET APRIL 28TH, 2021 20005THE AVANT PHASE IIP103BTHIRD FLOORPLUMBING PLAN -AREA BCARMEL,INSHEET KEYNOTES 1 1" COLD WATER FROM BELOW FLOOR IN WALL.3/4" COLD WATER UP IN WALL ABOVE. 2 4" WASTE STACK IN WALL. 3 4" VENT STACK IN WALL. 4 3" WASTE STACK IN WALL. 5 2" VENT STACK IN WALL. 6 FIRE PROTECTION STANDPIPE IN CORNER OF STAIRWELL WITH FIRE HOSE CONNECTIONS AT EACH INTERMITTENT LANDING IN STAIRWELL. N 1/8" = 1'-0" THIRD FLOOR PLUMBING PLAN - AREA B1 GENERAL NOTES A REFER TO DRAWING P000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS, LEGENDS, ABBREVIATIONS, ADDITIONAL GENERAL NOTES AND PLUMBING NOTES. B REFER TO P500 SERIES DRAWINGS FOR PLUMBING DETAILS. C REFER TO P600 SERIES DRAWINGS FOR PLUMBING SCHEDULES. D PROVIDE CEILING ACCESS PANELS AT SHUT-OFF VALVES, CONTROL VALVES, DRAIN VALVES, ETC. THAT ARE LOCATED ABOVE A NON-LAY-IN OR ACCESSIBLE CEILING. E INSTALL ALL PIPING AS HIGH AS POSSIBLE. F ALL PIPING, INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS, AND ADHESIVES ARE TO BE PLENUM RATED WITHIN RETURN AIR PLENUMS, HAVING A FLAME-SPREAD INDEX OF 25 OR LESS, AND A SMOKE-DEVELOPED INDEX OF 50 OR LESS, AS REQUIRED BY CODE. #DESCRIPTION DATE 1 CITY REVIEW COMMENTS 9/17/2021 1 1 EW3EW3EW3EW3EW2bEW3EW3EW3EW3631154B1B3 631154B1B2A1A1A1A1A1 631154 B1DN A1aA1aA1aA1a11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 323 2 3 2 3 2 3 2 3 2 3 2 3 2 32 3 23 2 3 2 3 2 3 2 3 2 3 2 3 23 23 2 3 2 3 4 5 4 5 4 5 45 2 3 4 5 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 6 3" FD-2 3" FD-2 UNIT C2 129 UNIT A1 130 UNIT A1 131 UNIT A1 132 UNIT A1 133 UNIT A1 134 UNIT C1 158 UNIT A1 159 UNIT A1 160 UNIT B3 161 UNIT B1 162 UNIT B1 163 UNIT B1 164 UNIT B2 165 DATA 170 DATA 171 5 4 7 ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONSKBSO Consulting1344 S Rangeline Rd. Suite 202CARMEL, INDIANA 46032P: 317-344-8044PERMIT SET APRIL 28TH, 2021 20005THE AVANT PHASE IIP104AFOURTH FLOORPLUMBING PLAN -AREA ACARMEL,INN 1/8" = 1'-0" FOURTH FLOOR PLUMBING PLAN - AREA A1 SHEET KEYNOTES 1 3/4" COLD WATER FROM BELOW FLOOR IN WALL. 2 4" WASTE STACK IN WALL. 3 4" VENT STACK IN WALL. 4" VENT THRU ROOF. 4 3" WASTE STACK IN WALL. 5 2" VENT STACK IN WALL. 4" VENT THRU ROOF. 6 3/4"CW UP TO ROOF HYDRANT (RH-1) ON ROOF. 7 FIRE PROTECTION STANDPIPE IN CORNER OF STAIRWELL WITH FIRE HOSE CONNECTIONS AT EACH INTERMITTENT LANDING IN STAIRWELL. GENERAL NOTES A REFER TO DRAWING P000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS, LEGENDS, ABBREVIATIONS, ADDITIONAL GENERAL NOTES AND PLUMBING NOTES. B REFER TO P500 SERIES DRAWINGS FOR PLUMBING DETAILS. C REFER TO P600 SERIES DRAWINGS FOR PLUMBING SCHEDULES. D PROVIDE CEILING ACCESS PANELS AT SHUT-OFF VALVES, CONTROL VALVES, DRAIN VALVES, ETC. THAT ARE LOCATED ABOVE A NON-LAY-IN OR ACCESSIBLE CEILING. E INSTALL ALL PIPING AS HIGH AS POSSIBLE. F ALL PIPING, INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS, AND ADHESIVES ARE TO BE PLENUM RATED WITHIN RETURN AIR PLENUMS, HAVING A FLAME-SPREAD INDEX OF 25 OR LESS, AND A SMOKE-DEVELOPED INDEX OF 50 OR LESS, AS REQUIRED BY CODE. #DESCRIPTION DATE 1 CITY REVIEW COMMENTS 9/17/2021 1 1 EW3EW2bA2A1A1A1631154 B1 631154 B1 631154B1631154 B1 631154B1DNA1aA1a 1 2 3 5 4 1 1 1 1 1 1 1 1 1 1 23 2 3 2 3 5 4 5 4 2 3 2 3 5 4 23 2 3 5 4 2 3 5 4 5 4 5 4 5 4 2 3 23 5 4 2 3 5 4 2323 2 3 2 3 23 2 3 3/4" CW 6 UNIT A1 135 UNIT A1 136 UNIT B1 137 UNIT A1 138 UNIT B1 139 UNIT A1 140 UNIT B1 141 UNIT B1 166 UNIT B1 167 UNIT C2 168 UNIT A2 169 7 ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONSKBSO Consulting1344 S Rangeline Rd. Suite 202CARMEL, INDIANA 46032P: 317-344-8044PERMIT SET APRIL 28TH, 2021 20005THE AVANT PHASE IIP104BFOURTH FLOORPLUMBING PLAN -AREA BCARMEL,INN 1/8" = 1'-0" FOURTH FLOOR PLUMBING PLAN - AREA B1 SHEET KEYNOTES 1 3/4" COLD WATER FROM BELOW FLOOR IN WALL. 2 4" WASTE STACK IN WALL. 3 4" VENT STACK IN WALL. 4" VENT THRU ROOF. 4 3" WASTE STACK IN WALL. 5 2" VENT STACK IN WALL. 4" VENT THRU ROOF. 6 3/4"CW UP TO ROOF HYDRANT (RH-1) ON ROOF. 7 FIRE PROTECTION STANDPIPE IN CORNER OF STAIRWELL WITH FIRE HOSE CONNECTIONS AT EACH INTERMITTENT LANDING IN STAIRWELL. GENERAL NOTES A REFER TO DRAWING P000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS, LEGENDS, ABBREVIATIONS, ADDITIONAL GENERAL NOTES AND PLUMBING NOTES. B REFER TO P500 SERIES DRAWINGS FOR PLUMBING DETAILS. C REFER TO P600 SERIES DRAWINGS FOR PLUMBING SCHEDULES. D PROVIDE CEILING ACCESS PANELS AT SHUT-OFF VALVES, CONTROL VALVES, DRAIN VALVES, ETC. THAT ARE LOCATED ABOVE A NON-LAY-IN OR ACCESSIBLE CEILING. E INSTALL ALL PIPING AS HIGH AS POSSIBLE. F ALL PIPING, INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS, AND ADHESIVES ARE TO BE PLENUM RATED WITHIN RETURN AIR PLENUMS, HAVING A FLAME-SPREAD INDEX OF 25 OR LESS, AND A SMOKE-DEVELOPED INDEX OF 50 OR LESS, AS REQUIRED BY CODE. #DESCRIPTION DATE 1 CITY REVIEW COMMENTS 9/17/2021 1 1