HomeMy WebLinkAboutAvantPhase2_ComCheck-AddendumProject Title: Avant Phase 2 Report date: 06/25/21
Data filename: Page 1 of 7
Generated by COMcheck-Web Software
Envelope Compliance Certificate
Section 1: Project Information
Energy Code: 2009 IECC
Project Title: Avant Phase 2
Project Type: New Construction
Construction Site:Owner/Agent:Designer/Contractor:
12890 Old Meridian Street
Carmel, Indiana 46032
Edward Rose Development Carmel,
LLC
11611 North Meridian Street, Suite 800
Carmel, Indiana 46032
317-297-3060
Studio M Architecture & Planning
6311 Westfield Blvd, Suite 100
Indianapolis, Indiana 46220
5749936261
jmazur@studiomarchitcture.net
Building Location (for weather data):Carmel, Indiana
Climate Zone:5a
Vertical Glazing / Wall Area Pct.:26%
Building Use: Activity Type(s)Floor Area
1-Multifamily : Nonresidential 129904
Section 2: Envelope Assemblies and Requirements Checklist
Envelope PASSES: Design 1% better than code.
Envelope Assemblies:
Component Name/Description Gross
Area or
Perimeter
Cavity
R-Value
Cont. R-
Value
Proposed
U-Factor
Budget U-
Factor(a)
Floor: Unheated Slab-On-Grade, Horizontal with vertical 4 ft., [Bldg.
Use 1 - Multifamily]
1485 ---10.0 ------
Ext. Wall Masonry Veneer: Wood-Framed, 16in. o.c., [Bldg. Use 1 -
Multifamily]
20123 21.0 0.0 0.062 0.064
Window: Vinyl Frame, Perf. Specs.: Product ID VinylWindow, SHGC
0.39, [Bldg. Use 1 - Multifamily] (c)
3689 ------0.240 0.350
Window: Metal Frame, Thermal Break, Perf. Type: Energy code
default, Double Pane with Low-E, Clear , SHGC 0.70, [Bldg. Use
1 - Multifamily]
90 ------0.650 0.550
Door: , Perf. Type: Energy code default, Double Pane with Low-E,
Clear , SHGC 0.70, [Bldg. Use 1 - Multifamily]
119 ------0.800 0.800
Door: Other (U-Factor option), Non-Swinging, [Bldg. Use 1 -
Multifamily]
1340 ------0.100 0.500
Door: Insulated Metal, Swinging, [Bldg. Use 1 - Multifamily]21 ------0.500 0.700
Ext. Wall Fiber Cement: Wood-Framed, 16in. o.c., [Bldg. Use 1 -
Multifamily]
44989 21.0 0.0 0.062 0.064
Window: Vinyl Frame, Perf. Specs.: Product ID VinylWindow, SHGC
0.39, [Bldg. Use 1 - Multifamily] (c)
7128 ------0.240 0.350
Window: Metal Frame, Thermal Break, Perf. Type: Energy code
default, Double Pane with Low-E, Clear , SHGC 0.70, [Bldg. Use
1 - Multifamily]
2759 ------0.650 0.550
Door: , Perf. Specs.: Product ID Masonite Vistagrande, SHGC 0.28,
[Bldg. Use 1 - Multifamily] (c)
2268 ------0.300 0.350
Ext. Wall ACM Panel: Wood-Framed, 16in. o.c., [Bldg. Use 1 -
Multifamily]
8101 21.0 0.0 0.062 0.064
Window: Metal Frame, Thermal Break, Perf. Type: Energy code
default, Double Pane with Low-E, Clear , SHGC 0.70, [Bldg. Use
1 - Multifamily]
1589 ------0.650 0.550
Door: , Perf. Type: Energy code default, Double Pane with Low-E,
Clear , SHGC 0.70, [Bldg. Use 1 - Multifamily]
105 ------0.800 0.800
Project Title: Avant Phase 2 Report date: 06/25/21
Data filename: Page 2 of 7
Roof: Insulation Entirely Above Deck, [Bldg. Use 1 - Multifamily]32364 ---20.0 0.048 0.048
(a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(b) 'Other' components require supporting documentation for proposed U-factors.
(c) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
Air Leakage, Component Certification, and Vapor Retarder Requirements:
❑1.All joints and penetrations are caulked, gasketed or covered with a moisture vapor-permeable wrapping material installed in accordance
with the manufacturer's installation instructions.
❑2.Windows, doors, and skylights certified as meeting leakage requirements.
❑3.Component R-values & U-factors labeled as certified.
❑4.No roof insulation is installed on a suspended ceiling with removable ceiling panels.
❑5.'Other' components have supporting documentation for proposed U-Factors.
❑6.Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that
achieves the rated R-value without compressing the insulation.
❑7.Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized
dampers.
❑8.Cargo doors and loading dock doors are weather sealed.
❑9.Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283, are sealed with gasket or caulk.
❑10.Building entrance doors have a vestibule equipped with self-closing devices.
Exceptions:
❑Building entrances with revolving doors.
❑Doors not intended to be used as a building entrance.
❑Doors that open directly from a space less than 3000 sq. ft. in area.
❑Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors.
❑Doors opening directly from a sleeping/dwelling unit.
Section 3: Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications
and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 2009 IECC
requirements in COMcheck-Web and to comply with the mandatory requirements in the Requirements Checklist.
Name - Title Signature Date
MDA RXSEHLATSEIRGEEDR
STATE OF
No. AR12000062
Alex D Marsh, Project Architect June 25, 2021
COMcheck Software Version 4.1.5.3
Interior Lighting Compliance Certificate
Project Title:
90.1 (2007) Standard
Project Type:New Construction
Construction Site:
12890 Old Meridian Street
Carmel, Indiana 46032
Owner/Agent:
Edward Rose Development Carmel,
LLC
11611 North Meridian Street, Suite
800
Carmel, Indiana 46032
317-297-3060
Designer/Contractor:
Studio M Architecture & Planning
6311 Westfield Blvd, Suite 100
Indianapolis, Indiana 46220
5749936261
jmazur@studiomarchitcture.net
Project Information
Energy Code:
Avant Phase 2
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
(B X C)
1-Multifamily 129904 0.70 90933
90933Total Allowed Watts =
Proposed Interior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
1-Multifamily
LF2: LF2: SQUARE PENDANT: Other:1 2 74 148
LF3: LF3: 4' DIRECT LINEAR: Other:1 12 27 324
LF4: LF4: LED CHANDELIER: Other:1 2 66 132
LF5: LF5: 20" PENDANT: Other:1 7 35 245
LF7: LF7: 5" ROUND DOWNLIGHT: Other:1 54 15 810
LF9: LF9: WALL SCONCE: Other:1 2 17 34
LF10: LF10: 28" VANITY: Other:1 2 30 60
LF11: LF11: 4" SQUARE DOWNLIGHT: Other:1 213 10 2130
LF12: LF12: 4' MULTIPURPOSE LINEAR: Other:1 65 50 3218
LF13: LF13: 6" ROUND DOWNLIGHT: Other:1 23 10 230
LF14: LF14: 4' WALL BRACKET: Other:1 16 51 816
LF15: LF15: GARAGE FIXTURE: Other:1 4 51 204
LF16: LF16: 6" CYLINDER: Other:1 4 20 80
LF17: LF17: SCONCE: Other:1 96 10 960
9390Total Proposed Watts =
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been
designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.1.5.3 and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Interior Lighting PASSES: Design 90% better than code
Project Title:
Data filename:
Avant Phase 2
P:\20005 Avant 2\Bidding & Approvals\Comcheck\Old\Avant_Phase_2.cxl
07/09/21Report date:
71 ofPage
Name - Title Signature Date
Project Title:
Data filename:
Avant Phase 2
P:\20005 Avant 2\Bidding & Approvals\Comcheck\Old\Avant_Phase_2.cxl
07/09/21Report date:
72 ofPage
SEUN ODUKOMAIYA, P.E.07/09/2021
COMcheck Software Version 4.1.5.3
Exterior Lighting Compliance Certificate
Project Title:
90.1 (2007) Standard
Project Type:New Construction
Construction Site:
12890 Old Meridian Street
Carmel, Indiana 46032
Owner/Agent:
Edward Rose Development Carmel,
LLC
11611 North Meridian Street, Suite
800
Carmel, Indiana 46032
317-297-3060
Designer/Contractor:
Studio M Architecture & Planning
6311 Westfield Blvd, Suite 100
Indianapolis, Indiana 46220
5749936261
jmazur@studiomarchitcture.net
Project Information
Energy Code:
Avant Phase 2
Allowed Exterior Lighting Power
A
Area/Surface Category
B
Quantity
C
Allowed
Watts / Unit
D
Tradable
Wattage
E
Allowed Watts
(B X C)
Parking area(s)66580 ft2 0.15 Yes 9987
Total Tradable Watts (a) =
Total Allowed Watts =
Total Allowed Supplemental Watts (b) =
9987
9987
499
(a)Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b)A supplemental allowance equal to 499 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
Parking area(s) (66580 ft2): Tradable Wattage
S1: S1: TYPE V POLE FIXTURE: Other:1 9 129 1161
S2: S2: TYPE II POLE FIXTURE: Other:1 2 129 258
1419Total Tradable Proposed Watts =
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been
designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.1.5.3 and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Exterior Lighting PASSES: Design 86% better than code
Project Title:
Data filename:
Avant Phase 2
P:\20005 Avant 2\Bidding & Approvals\Comcheck\Old\Avant_Phase_2.cxl
07/09/21Report date:
73 ofPage
SEUN ODUKOMAIYA, P.E.07/09/2021
Inspection Checklist
Requirements: 100.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.5.3
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 90.1 (2007) Standard
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
4.2.2
[PR4]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the lighting and
electrical systems and equipment and
document where exceptions to the
standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
8.4.1.1,
8.4.1.2
[PR6]2
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the electrical systems
and equipment and document where
exceptions are claimed. Feeder
connectors sized in accordance with
approved plans and branch circuits
sized for maximum drop of 3%.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Avant Phase 2
P:\20005 Avant 2\Bidding & Approvals\Comcheck\Old\Avant_Phase_2.cxl
07/09/21Report date:
74 ofPage
Section
#
& Req.ID
Rough-In Electrical Inspection Complies?Comments/Assumptions
9.4.1.1
[EL1]2
Automatic controls to shut off all
building lighting installed in buildings
>5,000 ft2.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.4.1.2
[EL2]2
Independent lighting controls installed
per approved lighting plans and all
manual controls readily accessible and
visible to occupants.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.4.1.3
[EL3]2
Automatic lighting controls for exterior
lighting installed.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.4.1.4
[EL4]1
Separate lighting control devices for
specific uses installed per approved
lighting plans.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.4.2
[EL5]3
Ballasted one and three lamp fixtures
with >30 W/lamp have two lamp
tandem wired ballasts when >=2
fixtures in same space on same
control.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.4.3
[EL6]1
Exit signs do not exceed 5 watts per
face.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.4.4
[EL7]1
Exterior grounds lighting over 100 W
provides >60 lm/W unless on motion
sensor or fixture is exempt from scope
of code or from external LPD.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.6.2
[EL8]1
Additional interior lighting power
allowed for special functions per the
approved lighting plans and is
automatically controlled and
separated from general lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Avant Phase 2
P:\20005 Avant 2\Bidding & Approvals\Comcheck\Old\Avant_Phase_2.cxl
07/09/21Report date:
75 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
8.7.1
[FI16]3
Furnished as-built drawings for
electric power systems within 30 days
of system acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
8.7.2
[FI17]3
Furnished O&M instructions for
systems and equipment to the
building owner or designated
representative.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.2.2.3
[FI18]1
Interior installed lamp and fixture
lighting power is consistent with what
is shown on the approved lighting
plans, demonstrating proposed watts
are less than or equal to allowed
watts.
Complies
Does Not
Not Observable
Not Applicable
See the Interior Lighting fixture schedule for values.
9.4.5
[FI19]1
Exterior lighting power is consistent
with what is shown on the approved
lighting plans, demonstrating
proposed watts are less than or equal
to allowed watts.
Complies
Does Not
Not Observable
Not Applicable
See the Exterior Lighting fixture schedule for values.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Avant Phase 2
P:\20005 Avant 2\Bidding & Approvals\Comcheck\Old\Avant_Phase_2.cxl
07/09/21Report date:
76 ofPage
Project Title:
Data filename:
Avant Phase 2
P:\20005 Avant 2\Bidding & Approvals\Comcheck\Old\Avant_Phase_2.cxl
07/09/21Report date:
77 ofPage
COMcheck Software Version 4.1.5.1
Mechanical Compliance Certificate
Project Title:
90.1 (2007) Standard
Project Type:New Construction
Location:Carmel, Indiana
Climate Zone:5a
Construction Site:
12890 Old Meridian Street
Carmel, Indiana 46032
Owner/Agent:
Edward Rose Development Carmel,
LLC
11611 North Meridian Street, Suite
800
Carmel, Indiana 46032
317-297-3060
Designer/Contractor:
Studio M Architecture & Planning
6311 Westfield Blvd, Suite 100
Indianapolis, Indiana 46220
5749936261
jmazur@studiomarchitcture.net
Project Information
Energy Code:
Avant Phase 2
Mechanical Systems List
Quantity System Type & Description
Heating: 1 each - Central Furnace, Electric, Capacity = 26 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Split System, Capacity = 22 kBtu/h, Air-Cooled Condenser
Proposed Efficiency = 13.00 SEER, Required Efficiency: 13.00 SEER
Fan System: None
9 FCU-4 (Single Zone):
Heating: 1 each - Central Furnace, Electric, Capacity = 38 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Split System, Capacity = 25 kBtu/h, Air-Cooled Condenser
Proposed Efficiency = 13.00 SEER, Required Efficiency: 13.00 SEER
Fan System: None
1 FCU-5 (Single Zone):
Heating: 1 each - Unit Heater, Electric, Capacity = 5 kBtu/h
No minimum efficiency requirement applies
Fan System: None
26 UH-1 (Single Zone):
Heating: 1 each - Unit Heater, Electric, Capacity = 17 kBtu/h
No minimum efficiency requirement applies
Fan System: None
1 UH-2 (Single Zone):
Split System Heat Pump
Heating Mode: Capacity = 14 kBtu/h,
Proposed Efficiency = 11.40 HSPF, Required Efficiency = 7.70 HSPF
Cooling Mode: Capacity = 12 kBtu/h,
Proposed Efficiency = 22.70 SEER, Required Efficiency: 13.00 SEER
Fan System: None
1 DS-1 / HP-1 (Single Zone):
Electric Storage Water Heater, Capacity: 19 gallons
No minimum efficiency requirement applies
2 DWH-3:
Project Title:
Data filename:
Avant Phase 2
P:\20005 Avant 2\Bidding & Approvals\Comcheck\Old\Avant_Phase_2.cxl
07/08/21Report date:
111 ofPage
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.1.5.1 and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Project Title:
Data filename:
Avant Phase 2
P:\20005 Avant 2\Bidding & Approvals\Comcheck\Old\Avant_Phase_2.cxl
07/08/21Report date:
112 ofPage
SEUN ODUKOMAIYA, P.E.07/08/2021
Inspection Checklist
Requirements: 100.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.5.1
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 90.1 (2007) Standard
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
4.2.2,
6.4.2
[PR2]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the mechanical
systems and equipment and
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
4.2.2,
7.4.1
[PR3]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the service water
heating systems and equipment and
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.4
[PR5]1
Detailed instructions for HVAC
systems commissioning included on
the plans or specifications for projects
>=50,000 ft2.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Avant Phase 2
P:\20005 Avant 2\Bidding & Approvals\Comcheck\Old\Avant_Phase_2.cxl
07/08/21Report date:
113 ofPage
Section
#
& Req.ID
Footing / Foundation
Inspection
Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
6.4.3.8
[FO9]3
Freeze protection and snow/ice
melting system sensors for future
connection to controls.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Avant Phase 2
P:\20005 Avant 2\Bidding & Approvals\Comcheck\Old\Avant_Phase_2.cxl
07/08/21Report date:
114 ofPage
Section
#
& Req.ID
Plumbing Rough-In Inspection Complies?Comments/Assumptions
7.4.3
[PL1]2
Service hot-water piping systems
insulated. Where piping is installed in
or under a slab, verification may need
to occur during Foundation Inspection.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
7.4.4.1
[PL2]3
Temperature controls installed on
service water heating systems
(<=120ºF to maximum temperature
for intended use).
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
7.4.6
[PL4]3
Heat traps installed on non-circulating
storage water tanks.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Avant Phase 2
P:\20005 Avant 2\Bidding & Approvals\Comcheck\Old\Avant_Phase_2.cxl
07/08/21Report date:
115 ofPage
Section
#
& Req.ID
Mechanical Rough-In
Inspection
Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
6.4.1.4,
6.4.1.5
[ME1]2
HVAC equipment efficiency
verified. Non-NAECA HVAC
equipment labeled as meeting
90.1.
Efficiency:_____Efficiency:_____Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list
for values.
6.4.3.4.1
[ME3]3
Stair and elevator shaft vents
have motorized dampers that
automatically close.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.4.3.4.2,
6.4.3.4.3,
6.4.3.4.4
[ME4]3
Outdoor air and exhaust systems
have motorized dampers that
automatically shut when not in
use and meet maximum leakage
rates. Check gravity dampers
where allowed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Gravity dampers
acceptable in systems with
outside or exhaust air flow
rates less than 300 cfm
where dampers are
interlocked with fan.
6.4.3.4.5
[ME5]3
Ventilation fans >0.75 hp have
automatic controls to shut off fan
when not required.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.9
[ME6]1
Demand control ventilation
provided for spaces >500 ft2 and
>40 people/1000 ft2 occupant
density and served by systems
with air side economizer, auto
modulating outside air damper
control, or design airflow >3,000
cfm.
Complies
Does Not
Not Observable
Not Applicable
Exception: Systems with a
design outdoor airflow less
than 1200 cfm.
6.4.4.1.1
[ME7]3
Insulation exposed to weather
protected from damage.
Insulation outside of the
conditioned space and associated
with cooling systems is vapor
retardant.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.4.1.2
[ME8]2
HVAC ducts and plenums
insulated.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.4.1.3
[ME9]2
HVAC piping insulation thickness._____ in._____ in.Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.4.2.1
[ME10]2
Ducts and plenums sealed based
on static pressure and location.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.4.2.2
[ME11]3
Ductwork operating >3 in. water
column requires air leakage
testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.4.4.2.2
[ME11]3
Ductwork operating >3 in. water
column requires air leakage
testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.4.4.2.2
[ME11]3
Ductwork operating >3 in. water
column requires air leakage
testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Avant Phase 2
P:\20005 Avant 2\Bidding & Approvals\Comcheck\Old\Avant_Phase_2.cxl
07/08/21Report date:
116 ofPage
Section
#
& Req.ID
Mechanical Rough-In
Inspection
Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
6.4.4.2.2
[ME11]3
Ductwork operating >3 in. water
column requires air leakage
testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.4.4.2.2
[ME11]3
Ductwork operating >3 in. water
column requires air leakage
testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.5.2.3
[ME19]3
Dehumidification controls
provided to prevent reheating,
recooling, mixing of hot and cold
airstreams or concurrent heating
and cooling of the same
airstream.
Complies
Does Not
Not Observable
Not Applicable
Exception: Cooling capacity
40 kBtu/h.
6.5.4.1
[ME25]3
HVAC pumping systems >10 hp
designed for variable fluid flow.
Complies
Does Not
Not Observable
Not Applicable
Exception: Systems with
three or fewer control valves.
6.5.6.1
[ME30]1
Exhaust air energy recovery on
systems >=5,000 cfm and 70%
of design supply air.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.5.7.1
[ME32]2
Kitchen hoods >5,000 cfm have
make up air >=50% of exhaust
air volume.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.5.7.2
[ME33]1
Fume hoods exhaust systems
>=15,000 cfm have VAV hood
exhaust and supply systems,
direct make-up air or heat
recovery.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.5.8.1
[ME34]3
Unenclosed spaces that are
heated use only radiant heat.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.5.9
[ME35]1
Hot gas bypass limited to: <=240
kBtu/h – 50% >240 kBtu/h – 25%
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.5.9
[ME35]1
Hot gas bypass limited to: <=240
kBtu/h – 50% >240 kBtu/h – 25%
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
7.4.2
[ME36]2
Service water heating equipment
meets efficiency requirements.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Avant Phase 2
P:\20005 Avant 2\Bidding & Approvals\Comcheck\Old\Avant_Phase_2.cxl
07/08/21Report date:
117 ofPage
Section
#
& Req.ID
Rough-In Electrical Inspection Complies?Comments/Assumptions
10.4.1
[EL9]2
Electric motors meet requirements
where applicable.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Avant Phase 2
P:\20005 Avant 2\Bidding & Approvals\Comcheck\Old\Avant_Phase_2.cxl
07/08/21Report date:
118 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
6.4.3.1.1
[FI2]2
Heating and cooling to each zone is
controlled by a thermostat control.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.1.2,
6.4.3.2,
6.4.3.3,
6.4.3.3.1,
6.4.3.3.2
[FI3]2
Thermostatic controls have a 5 °F
deadband.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.5
[FI5]3
Heat pump controls prevent
supplemental electric resistance heat
from coming on when not needed.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.7
[FI6]3
When humidification and
dehumidification are provided to a
zone, simultaneous operation is
prohibited.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.1
[FI7]3
Furnished HVAC as-built drawings
submitted within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.2
[FI8]3
Furnished O&M manuals for HVAC
systems within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.3
[FI9]1
An air and/or hydronic system
balancing report is provided for HVAC
systems serving zones >5,000 ft2 of
conditioned area.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
6.7.2.4
[FI10]1
HVAC control systems have been
tested to ensure proper operation,
calibration and adjustment of controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
7.4.4.3
[FI11]3
Public lavatory faucet water
temperature <=110°F.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.2
[FI20]1
Temperature controls have setpoint
overlap restrictions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.3.1
[FI21]1
HVAC systems equipped with at least
one automatic shutdown control.
Complies
Does Not
Not Observable
Not Applicable
Exception: null.
6.4.3.3.2
[FI22]1
Setback controls allow automatic
restart and temporary operation as
required for maintenance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Avant Phase 2
P:\20005 Avant 2\Bidding & Approvals\Comcheck\Old\Avant_Phase_2.cxl
07/08/21Report date:
119 ofPage
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Avant Phase 2
P:\20005 Avant 2\Bidding & Approvals\Comcheck\Old\Avant_Phase_2.cxl
07/08/21Report date:
1110 ofPage
Project Title:
Data filename:
Avant Phase 2
P:\20005 Avant 2\Bidding & Approvals\Comcheck\Old\Avant_Phase_2.cxl
07/08/21Report date:
1111 ofPage