HomeMy WebLinkAboutEP101B - FIRST FLOOR ELECTRICAL PLAN - AREA B4/A302 1/A3022/A3023/A3021/A3032/A3033232ADD THIS SECTION EW34/A303
CFB
LF3
LF3
631154
LF1
LF1 LF1
LF1
LF1
LF1
LF1
LF1
LF4
LF4
LF4
LF1
LF1
LF1
LF1
LF1 LF5CFBLF1LF1LF1LF1 LF1LF1 LF1LF1LF1 LF1LF1LF4CFB
LF3
LF3
631154
LF1
LF1 LF1
LF1
LF1
LF1
LF1
LF1
LF4
LF4
LF4
LF1
LF1
LF1
LF1
LF1
CFB
LF3
LF3
631154
LF1
LF1 LF1
LF1
LF1
LF1
LF1
LF1
LF4
LF4
LF4
LF1
LF1
LF1
LF1
LF1
CFBLF4CFBC1LF5LF1 LF1LF4 LF4LF5LF5 LF1LF1 LF1LF1LF1LF1 LF1 LF1LF1LF1 LF1LF1 LF1LF1UPLF1LF1LF1LF1LF1LF1LF1LF1LF1LF3 CFB LF1LF1 LF4LF1
LF1
LF1
LF1
LF1LF1
LF1
LF1
LF1
LF3
CFB
LF1
LF1
LF4
T
T FACPS S FFS
S
S
F
F
S
S
S
F FJ
J
J
J
J J J J
J
J
UNIT B1
9
UNIT B1
10
UNIT B1
12
UNIT A1
13
2 / E402
2 / E402 1 / E401
1 / E401
UH-2
1
2
4
5
7
7
6
6 6 6
6
6
6
6
WP
WP
HP1A
UNIT A1
91
1 / E401
HP1A-35
HP1A-35
HP1A-35
HP1A-35
HP1A-35
HP1A-35
HP1A-39
HP1A-19,21
HP1A-15
HP1A-15
HP1A-15
HP1A-28 HP1A-28HP1A-29 HP1A-29 HP1A-29 HP1A-29 HP1A-10 HP1A-10
HP1A-30
HP1A-4
5
5 5 5
5
5
5
5
HP1A-47
HP1A-48
HP1A-49
HP1A-50
HP1A-52 HP1A-51
HP1A-54
HP1A-53
HP1A -44
HP1A-57
HP1A-58
HP1A-59
HP1A-60
HP1A-61HP1A-62 HP1A-63
HP1A-64
UH-1
UH-1
UH-1
UH-1
UH-1
UH-1 UH-1
MDP
GEB
UH-1
UH-1 ARCHITECTCLIENT CONSULTANT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONSKBSO Consulting1344 S Rangeline Rd. Suite 202CARMEL, INDIANA 46032P: 317-344-8044PERMIT SET
APRIL 28TH, 2021
20005THE AVANTPHASE IIEP101BFIRST FLOORELECTRICAL PLAN -AREA BCARMEL,INGENERAL NOTES
A REFER TO SHEET E-000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND
ABBREVIATIONS.
B REFER TO E-600 SERIES SHEETS FOR LOAD CENTER CIRCUIT SCHEDULES
FOR EACH DWELLNG UNIT TYPE.
C ALL RECEPTACLES SHOWN LOCATED ON BUILDING EXTERIOR OR ROOF
SHOULD BE PROVIDED WITH IN-USE WEATHERPROOF ENCLOSURE.
D ROOF TOP CONDENSING UNITS SERVING RESIDENT UNITS FED FROM
ASSOCIATED APARTMENT LOAD CENTER. SEE ENLARGE UNIT PLANS IN E400
SERIES DRAWINGS FROM CIRCUIT INFORMATION.
E CONTRACTOR TO PROVIDE (2) 1-1/2" MICRODUCTS (1) 3/8" SMOOTHBORE
INNER DUCT WITH PULL STRINGS.
F ALL DATA RECEPTACLES LOCATIONS SHOWN TO RECEIVE (2) RJ45 JACKS
WITH CAT 6 CABLING UNLESS NOTED OTHERWISE.
G ALL COMMUNICATION CABLE TO BE INSTALLED AND TESTED ACCORDING TO
BICSI STANDARDS. REPLACE ANY CABLING THAT DOES NOT PASS TESTING
PRIOR TO FINAL TERMINATIONS.
H ALL FIRE STROBES TO BE 75cd UNLES NOTED OTHERWISE.
I PROVIDE FLOW AND TAMPER SWITCHES FOR ALL FIRE RISERS AND STAND
PIPES. COORDINATE LOCATIONS WITH FIRE SUPPRESSION SYSTEM
DESIGNER.
J ALL ELECTRICAL BRANCH CIRCUITS LOCATED IN EXPOSED CEILING SHALL BE
INSTALLED IN EMT CONDUIT.
SHEET KEYNOTES
1 PROVIDE COPPER GROUND BUS. SEE GROUND SYSTEM DETAIL ON E-501 FOR
CONNECTION DETAILS.
2 PROVIDE 120V POWER CONNECTION TO FIRE ALARM CONTROL PANEL.
4 PROVIDE NON-FUSED EQUIPMENT DISCONNECT SWTICH AND 208V/1PH
CIRCUIT FOR ELECTRIC UNIT HEATER. USE (2) #10 AND #10 GND.
5 PROVIDE 120V, 20A CIRCUIT FOR ELECTRIC UNIT HEATER.
6 PROVIDE 120V, 20A CIRCUIT FOR OVERHEAD DOOR OPERATOR. COODINATE
WITH DOOR PROVIDER FOR EXACT LOCATION PRIOR TO ROUGH-IN..
7 PROVIDE 120V, 20A CIRCUIT FOR SMOKE DOOR HOLD OPENS.
1/8" = 1'-0"
FIRST FLOOR ELECTRICAL PLAN - AREA B 1
# DESCRIPTION DATE
10/11/21