Loading...
HomeMy WebLinkAboutEP103B - THIRD FLOOR ELECTRICAL PLAN - AREA BS S FFFSSS S S J J EW3LF5CFBA2LF1LF1LF1LF1 LF1LF1 LF1LF1LF1 LF1LF1LF4LF3A1LF1LF1LF1LF1LF1LF4LF3 A1 LF1LF1 LF1LF1LF1LF1LF1LF1LF1CFBLF4LF1LF1631154 B1 631154 B1 631154B1LF3 A1 LF1LF1 LF1LF1LF1LF1LF1LF1LF1 CFB LF4LF1LF1631154 B1 631154B1 CFBLF4CFBC2 LF5LF1 LF1LF4 LF4LF5LF5LF1LF1LF1LF1LF1LF1 LF1 LF1LF1LF1 LF1LF1 LF1LF1DNUPA1a LF1LF1LF1LF1LF1LF1LF1LF1LF1LF3 CFB LF1LF1 LF4A1a LF1 LF1 LF1 LF1 LF1LF1 LF1 LF1 LF1 LF3 CFB LF1 LF1 LF4 1 / E401 1 / E401 1 1 2 UNIT A1 122 UNIT B1 123 UNIT A1 124 UNIT B1 125 UNIT A1 127 UNIT B1 128 UNIT A1 126 1 / E402 1 / E402 1 / E402 1 / E402 1 / E401 1 / E402 3 / E403 1 / E401 3 / E401 HP2-8 HP2-18 HP2-18 HP2-18 HP2-18 HP2-10 HP2-18 UNIT B1 149UNIT B1 148 UNIT C2 150 UNIT A2 151 HP2 -24 UH-1 HP2-18 ARCHITECTCLIENT CONSULTANT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONSKBSO Consulting1344 S Rangeline Rd. Suite 202CARMEL, INDIANA 46032P: 317-344-8044PERMIT SET APRIL 28TH, 2021 20005THE AVANTPHASE IIEP103BTHIRD FLOORELECTRICAL PLAN -AREA BCARMEL,INGENERAL NOTES A REFER TO SHEET E-000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND ABBREVIATIONS. B REFER TO E-600 SERIES SHEETS FOR LOAD CENTER CIRCUIT SCHEDULES FOR EACH DWELLNG UNIT TYPE. C ALL RECEPTACLES SHOWN LOCATED ON BUILDING EXTERIOR OR ROOF SHOULD BE PROVIDED WITH IN-USE WEATHERPROOF ENCLOSURE. D ROOF TOP CONDENSING UNITS SERVING RESIDENT UNITS FED FROM ASSOCIATED APARTMENT LOAD CENTER. SEE ENLARGE UNIT PLANS IN E400 SERIES DRAWINGS FROM CIRCUIT INFORMATION. E CONTRACTOR TO PROVIDE (2) 1-1/2" MICRODUCTS (1) 3/8" SMOOTHBORE INNER DUCT WITH PULL STRINGS. F ALL DATA RECEPTACLES LOCATIONS SHOWN TO RECEIVE (2) RJ45 JACKS WITH CAT 6 CABLING UNLESS NOTED OTHERWISE. G ALL COMMUNICATION CABLE TO BE INSTALLED AND TESTED ACCORDING TO BICSI STANDARDS. REPLACE ANY CABLING THAT DOES NOT PASS TESTING PRIOR TO FINAL TERMINATIONS. H ALL FIRE STROBES TO BE 75cd UNLES NOTED OTHERWISE. I PROVIDE FLOW AND TAMPER SWITCHES FOR ALL FIRE RISERS AND STAND PIPES. COORDINATE LOCATIONS WITH FIRE SUPPRESSION SYSTEM DESIGNER. J ALL ELECTRICAL BRANCH CIRCUITS LOCATED IN EXPOSED CEILING SHALL BE INSTALLED IN EMT CONDUIT. SHEET KEYNOTES 1 PROVIDE 120V, 20A CIRCUIT FOR SMOKE DOOR HOLD OPENS. 2 PROVIDE 120V, 20A CIRCUIT FOR ELECTRIC UNIT HEATER. 1/8" = 1'-0" THIRD FLOOR ELECTRICAL PLAN -AREA B1 # DESCRIPTION DATE 10/11/21