Loading...
HomeMy WebLinkAboutEP105B - ROOF ELECTRICAL PLAN - AREA BROOF SLOPE1/4" PER FT MINTALLCEILINGOVERFRAMINGCU-2 CU-2 CU-2 CU-2 CU-1 CU-1 CU-1 CU-2 CU-2 CU-2 CU-2 CU-2 CU-2 CU-2 CU-1 CU-1 CU-1 CU-1 CU-1 CU-1 CU-1 CU-2 CU-2 CU-2 CU-2 CU-2 CU-2 CU-2 CU-3 CU-3 CU-3 CU-4 CU-1 CU-1 CU-1 CU-1 CU-1 CU-1 CU-1 WP WP WP HP4- 6 HP4-6 HP4- 6 WP HP4-13 WP HP4-13 WP HP4-13 ARCHITECTCLIENT CONSULTANT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONSKBSO Consulting1344 S Rangeline Rd. Suite 202CARMEL, INDIANA 46032P: 317-344-8044PERMIT SET APRIL 28TH, 2021 20005THE AVANTPHASE IIEP105BROOF ELECTRICALPLAN - AREA BCARMEL,IN1/8" = 1'-0" ROOF ELECTRICA PLAN -AREA B1 GENERAL NOTES A REFER TO SHEET E-000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND ABBREVIATIONS. B REFER TO E-600 SERIES SHEETS FOR LOAD CENTER CIRCUIT SCHEDULES FOR EACH DWELLNG UNIT TYPE. C ALL RECEPTACLES SHOWN LOCATED ON BUILDING EXTERIOR OR ROOF SHOULD BE PROVIDED WITH IN-USE WEATHERPROOF ENCLOSURE. D ROOF TOP CONDENSING UNITS SERVING RESIDENT UNITS FED FROM ASSOCIATED APARTMENT LOAD CENTER. SEE ENLARGE UNIT PLANS IN E400 SERIES DRAWINGS FROM CIRCUIT INFORMATION. E CONTRACTOR TO PROVIDE (2) 1-1/2" MICRODUCTS (1) 3/8" SMOOTHBORE INNER DUCT WITH PULL STRINGS. F ALL DATA RECEPTACLES LOCATIONS SHOWN TO RECEIVE (2) RJ45 JACKS WITH CAT 6 CABLING UNLESS NOTED OTHERWISE. G ALL COMMUNICATION CABLE TO BE INSTALLED AND TESTED ACCORDING TO BICSI STANDARDS. REPLACE ANY CABLING THAT DOES NOT PASS TESTING PRIOR TO FINAL TERMINATIONS. H ALL FIRE STROBES TO BE 75cd UNLES NOTED OTHERWISE. I PROVIDE FLOW AND TAMPER SWITCHES FOR ALL FIRE RISERS AND STAND PIPES. COORDINATE LOCATIONS WITH FIRE SUPPRESSION SYSTEM DESIGNER. J ALL ELECTRICAL BRANCH CIRCUITS LOCATED IN EXPOSED CEILING SHALL BE INSTALLED IN EMT CONDUIT. # DESCRIPTION DATE 10/11/21