HomeMy WebLinkAboutEP105B - ROOF ELECTRICAL PLAN - AREA BROOF SLOPE1/4" PER FT MINTALLCEILINGOVERFRAMINGCU-2 CU-2
CU-2 CU-2
CU-1 CU-1
CU-1
CU-2 CU-2
CU-2 CU-2
CU-2 CU-2
CU-2
CU-1 CU-1
CU-1 CU-1
CU-1 CU-1
CU-1
CU-2 CU-2
CU-2 CU-2
CU-2 CU-2
CU-2
CU-3
CU-3 CU-3
CU-4
CU-1 CU-1
CU-1 CU-1
CU-1 CU-1
CU-1
WP
WP
WP
HP4- 6
HP4-6
HP4- 6
WP
HP4-13
WP
HP4-13
WP
HP4-13 ARCHITECTCLIENT CONSULTANT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONSKBSO Consulting1344 S Rangeline Rd. Suite 202CARMEL, INDIANA 46032P: 317-344-8044PERMIT SET
APRIL 28TH, 2021
20005THE AVANTPHASE IIEP105BROOF ELECTRICALPLAN - AREA BCARMEL,IN1/8" = 1'-0"
ROOF ELECTRICA PLAN -AREA B1
GENERAL NOTES
A REFER TO SHEET E-000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND
ABBREVIATIONS.
B REFER TO E-600 SERIES SHEETS FOR LOAD CENTER CIRCUIT SCHEDULES
FOR EACH DWELLNG UNIT TYPE.
C ALL RECEPTACLES SHOWN LOCATED ON BUILDING EXTERIOR OR ROOF
SHOULD BE PROVIDED WITH IN-USE WEATHERPROOF ENCLOSURE.
D ROOF TOP CONDENSING UNITS SERVING RESIDENT UNITS FED FROM
ASSOCIATED APARTMENT LOAD CENTER. SEE ENLARGE UNIT PLANS IN E400
SERIES DRAWINGS FROM CIRCUIT INFORMATION.
E CONTRACTOR TO PROVIDE (2) 1-1/2" MICRODUCTS (1) 3/8" SMOOTHBORE
INNER DUCT WITH PULL STRINGS.
F ALL DATA RECEPTACLES LOCATIONS SHOWN TO RECEIVE (2) RJ45 JACKS
WITH CAT 6 CABLING UNLESS NOTED OTHERWISE.
G ALL COMMUNICATION CABLE TO BE INSTALLED AND TESTED ACCORDING TO
BICSI STANDARDS. REPLACE ANY CABLING THAT DOES NOT PASS TESTING
PRIOR TO FINAL TERMINATIONS.
H ALL FIRE STROBES TO BE 75cd UNLES NOTED OTHERWISE.
I PROVIDE FLOW AND TAMPER SWITCHES FOR ALL FIRE RISERS AND STAND
PIPES. COORDINATE LOCATIONS WITH FIRE SUPPRESSION SYSTEM
DESIGNER.
J ALL ELECTRICAL BRANCH CIRCUITS LOCATED IN EXPOSED CEILING SHALL BE
INSTALLED IN EMT CONDUIT.
# DESCRIPTION DATE
10/11/21