Loading...
HomeMy WebLinkAboutM101B - FIRST FLOOR MECHANICAL PLAN - AREA B4/A3021/A3022/A3023/A3021/A3032/A3033232ADD THIS SECTION EW34/A303 10/A440 11/A440 12/A440 01/A441 02/A441 03/A441 04/A441 CFB LF3 LF3 631154 B1 LF1 LF1 LF1 LF1 LF1 LF1 LF1 LF1 LF4 LF4 LF4 LF1 LF1 LF1 LF1 LF1 LF5CFBA2LF1LF1LF1LF1 LF1LF1 LF1LF1LF1 LF1LF1LF4CFB LF3 LF3 631154 B1 LF1 LF1 LF1 LF1 LF1 LF1 LF1 LF1 LF4 LF4 LF4 LF1 LF1 LF1 LF1 LF1 CFB LF3 LF3 631154 B1 LF1 LF1 LF1 LF1 LF1 LF1 LF1 LF1 LF4 LF4 LF4 LF1 LF1 LF1 LF1 LF1 CFBLF4CFBC1LF5LF1 LF1LF4 LF4LF5LF5 LF1LF1 LF1LF1LF1LF1LF1 LF1LF1LF1 LF1LF1 LF1LF1A1a LF1LF1LF1LF1LF1LF1LF1LF1LF1LF3 CFB LF1LF1 LF4A1a LF1 LF1 LF1 LF1 LF1LF1 LF1 LF1 LF1 LF3 CFB LF1 LF1 LF4 T UH-2 2 4 BIKE GARAGE 114 ELECTRICAL 115 1 / M402 1 / M402 1 / M401 1 / M402 1 / M401 4 / M401 5 UH-1 5 UH-1 5 UH-1 5 UH-1 5 UH-1 5 UH-1 5 UH-1 5 UH-1 SR-2SR -2 -200 SR-2SR -2 -200 SR-2SR -2 -200 12/10 1 1 1 FD 8ø16/12 SR-1SR -1 -100 1 SR-1SR -1 -100 1 UH-13 L-1 RG-2FD FCU-4 120 CFM 7 6 8ø 6ø 6ø CD 6 M404 ARCHITECTCLIENT CONSULTANT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONSKBSO Consulting1344 S Rangeline Rd. Suite 202CARMEL, INDIANA 46032P: 317-344-8044PERMIT SET APRIL 28TH, 2021 20005THE AVANTPHASE IIM101BFIRST FLOORMECHANICAL PLAN -AREA BCARMEL,INGENERAL NOTES A REFER TO SHEET P-000 FOR GENERAL PLUMBING NOTES, SYMBOLS AND ABBREVIATIONS. B REFER TO SHEET M500 SERIES DRAWINGS FOR MECHANICAL DETAILS. C REFER TO SHEET M600 SERIES DRAWINGS FOR MECHANICAL SCHEDULES. D COORDINATE WITH STRUCTURAL AND FRAMING PLANS PRIOR TO COMMENCING WORK. COORDINATE ALL ROUTING WITH ALL TRADES PRIOR TO FABRICATION. E SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS AND TYPES OF RATED CONSTRUCTION. CONSTRUCTION RATINGS ARE TO BE MAINTAINED. F SEAL ALL FLOOR, CEILING, AND WALL PENETRATIONS. USE FIRE CAULK AT RATED ASSEMBLIES AND GENERAL SEALANT ELSEWHERE. WHERE NON-METALLIC COMPONENTS LARGER THAN 4" DIA.(I.E. PVC OR CONDUIT) PENETRATES RATED ASSEMBLIES, INSTALL INTUMESCENT COLLAR. WHERE DUCTWORK LARGER THAN 4" DIA. PENETRATES RATED ASSEMBLIES, INSTALL FIRE DAMPER. G SIZE AND INSTALL REFRIGERANT PIPING AND ACCESSORIES PER MANUFACTURERS RECOMMENDATIONS. H ALL EXTERIOR VENT CAP AND VENT HOOD COLLARS TO BE VERIFIED IN SHOP DRAWINGS. I ALL FAN COIL UNITS TO BE WALL MOUNTED UNLESS OTHERWISE INDICATED. COORDINATE MOUNTING HEIGHT WITH OTHER DICIPLINES AND SPACE. J THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING A SIGN ATTACHED TO THE DRYER BOW IN EACH APARTMENT. THE TAG SHALL DOCUMENT THE ASSOCIATED INSTALLED DRYER VENT AND READ AS FOLLOWS: CONNECTED VENT DUCT: STRAIGHT DUCT: X FEET, 90 DEG. ELBOW: COUNT=X, 45 DEG. ELBOW: COUNT=X. K THERMOSTATS TO BE MOUNTED 48-INCHES A.F.F. TO TOP OF SENSOR, OR ALIGNED WITH ADJACENT SWITCHES UNLESS OTHERWISE NOTED. L DRYER EXHAUST DUCTWORK TO BE MINIMUM 28 GAUGE. M PROVIDE MECHANICAL SYSTEMS IN COMPLIANCE WITH STATE AND LOCAL CODES. N 1/8" = 1'-0" FIRST FLOOR MECHANICAL PLAN - AREA B 1 SHEET KEYNOTES 1 PROVIDE CEILING RADIATION DAMPER. 2 ROUTE SUPPLY AIR DUCT MAIN BETWEEN TRUSSES. 3 UNIT HEATER TO BE MOUNTED 8" A.F.F. 4 UNIT HEATER TO BE MOUNTED ON BRACKET PER MANUFACTURERS RECOMMENDATIONS. 5 UNIT HEATER TO BE MOUNTED 8" A.F.F. 6 ROUTE REFRIGERANT LINES THRU WALL FROM CONDENSING UNIT ON ROOF TO FCU. COORDINATE EXACT ROUTE WITH PLUMBING LINES. ALL PENETRATIONS THROUGH RATED ASSEMBLIES ARE TO BE FIRE SEALED. 7 FCU TO BE MOUNTED ON WALL PER MANUFACTURERS RECOMMENDATIONS ABOVE WATER HEATER. SEE DETAIL ON SHEET M501. ROUTE CONDENSATE LINE THROUGH WALL TO OUTSIDE. MAINTAIN 3' DISTANCE BETWEEN MECHANICAL EQUIPMENT AND ELECTRICAL EQUIPMENT. # DESCRIPTION DATE 10/11/21