HomeMy WebLinkAboutM101B - FIRST FLOOR MECHANICAL PLAN - AREA B4/A3021/A3022/A3023/A3021/A3032/A3033232ADD THIS SECTION EW34/A303
10/A440
11/A440
12/A440
01/A441
02/A441
03/A441
04/A441
CFB
LF3
LF3
631154
B1
LF1
LF1 LF1
LF1
LF1
LF1
LF1
LF1
LF4
LF4
LF4
LF1
LF1
LF1
LF1
LF1 LF5CFBA2LF1LF1LF1LF1 LF1LF1 LF1LF1LF1 LF1LF1LF4CFB
LF3
LF3
631154
B1
LF1
LF1 LF1
LF1
LF1
LF1
LF1
LF1
LF4
LF4
LF4
LF1
LF1
LF1
LF1
LF1
CFB
LF3
LF3
631154
B1
LF1
LF1 LF1
LF1
LF1
LF1
LF1
LF1
LF4
LF4
LF4
LF1
LF1
LF1
LF1
LF1 CFBLF4CFBC1LF5LF1 LF1LF4 LF4LF5LF5 LF1LF1 LF1LF1LF1LF1LF1 LF1LF1LF1 LF1LF1 LF1LF1A1a LF1LF1LF1LF1LF1LF1LF1LF1LF1LF3 CFB LF1LF1 LF4A1a
LF1
LF1
LF1
LF1
LF1LF1
LF1
LF1
LF1
LF3
CFB
LF1
LF1
LF4
T
UH-2
2
4
BIKE GARAGE
114
ELECTRICAL
115
1 / M402 1 / M402 1 / M401
1 / M402
1 / M401
4 / M401
5
UH-1
5
UH-1
5
UH-1
5
UH-1
5
UH-1
5
UH-1
5
UH-1
5
UH-1
SR-2SR -2 -200 SR-2SR -2 -200 SR-2SR -2 -200
12/10
1 1 1
FD 8ø16/12
SR-1SR -1 -100
1
SR-1SR -1 -100
1
UH-13
L-1
RG-2FD
FCU-4
120 CFM
7 6
8ø
6ø
6ø
CD
6
M404 ARCHITECTCLIENT CONSULTANT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONSKBSO Consulting1344 S Rangeline Rd. Suite 202CARMEL, INDIANA 46032P: 317-344-8044PERMIT SET
APRIL 28TH, 2021
20005THE AVANTPHASE IIM101BFIRST FLOORMECHANICAL PLAN -AREA BCARMEL,INGENERAL NOTES
A REFER TO SHEET P-000 FOR GENERAL PLUMBING NOTES, SYMBOLS AND
ABBREVIATIONS.
B REFER TO SHEET M500 SERIES DRAWINGS FOR MECHANICAL DETAILS.
C REFER TO SHEET M600 SERIES DRAWINGS FOR MECHANICAL SCHEDULES.
D COORDINATE WITH STRUCTURAL AND FRAMING PLANS PRIOR TO
COMMENCING WORK. COORDINATE ALL ROUTING WITH ALL TRADES PRIOR TO
FABRICATION.
E SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS AND TYPES OF RATED
CONSTRUCTION. CONSTRUCTION RATINGS ARE TO BE MAINTAINED.
F SEAL ALL FLOOR, CEILING, AND WALL PENETRATIONS. USE FIRE CAULK AT
RATED ASSEMBLIES AND GENERAL SEALANT ELSEWHERE. WHERE
NON-METALLIC COMPONENTS LARGER THAN 4" DIA.(I.E. PVC OR CONDUIT)
PENETRATES RATED ASSEMBLIES, INSTALL INTUMESCENT COLLAR. WHERE
DUCTWORK LARGER THAN 4" DIA. PENETRATES RATED ASSEMBLIES, INSTALL
FIRE DAMPER.
G SIZE AND INSTALL REFRIGERANT PIPING AND ACCESSORIES PER
MANUFACTURERS RECOMMENDATIONS.
H ALL EXTERIOR VENT CAP AND VENT HOOD COLLARS TO BE VERIFIED IN SHOP
DRAWINGS.
I ALL FAN COIL UNITS TO BE WALL MOUNTED UNLESS OTHERWISE INDICATED.
COORDINATE MOUNTING HEIGHT WITH OTHER DICIPLINES AND SPACE.
J THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING A SIGN
ATTACHED TO THE DRYER BOW IN EACH APARTMENT. THE TAG SHALL
DOCUMENT THE ASSOCIATED INSTALLED DRYER VENT AND READ AS
FOLLOWS: CONNECTED VENT DUCT: STRAIGHT DUCT: X FEET, 90 DEG. ELBOW:
COUNT=X, 45 DEG. ELBOW: COUNT=X.
K THERMOSTATS TO BE MOUNTED 48-INCHES A.F.F. TO TOP OF
SENSOR, OR ALIGNED WITH ADJACENT SWITCHES UNLESS
OTHERWISE NOTED.
L DRYER EXHAUST DUCTWORK TO BE MINIMUM 28 GAUGE.
M PROVIDE MECHANICAL SYSTEMS IN COMPLIANCE WITH STATE
AND LOCAL CODES.
N
1/8" = 1'-0"
FIRST FLOOR MECHANICAL PLAN - AREA B 1
SHEET KEYNOTES
1 PROVIDE CEILING RADIATION DAMPER.
2 ROUTE SUPPLY AIR DUCT MAIN BETWEEN TRUSSES.
3 UNIT HEATER TO BE MOUNTED 8" A.F.F.
4 UNIT HEATER TO BE MOUNTED ON BRACKET PER MANUFACTURERS
RECOMMENDATIONS.
5 UNIT HEATER TO BE MOUNTED 8" A.F.F.
6 ROUTE REFRIGERANT LINES THRU WALL FROM CONDENSING UNIT ON ROOF
TO FCU. COORDINATE EXACT ROUTE WITH PLUMBING LINES. ALL
PENETRATIONS THROUGH RATED ASSEMBLIES ARE TO BE FIRE SEALED.
7 FCU TO BE MOUNTED ON WALL PER MANUFACTURERS RECOMMENDATIONS
ABOVE WATER HEATER. SEE DETAIL ON SHEET M501. ROUTE CONDENSATE
LINE THROUGH WALL TO OUTSIDE. MAINTAIN 3' DISTANCE BETWEEN
MECHANICAL EQUIPMENT AND ELECTRICAL EQUIPMENT.
# DESCRIPTION DATE
10/11/21