Loading...
HomeMy WebLinkAboutP102B - SECOND FLOOR PLUMBING PLAN - AREA BEW3UNIT B1 24 UNIT B1 25 UNIT A1 26 UNIT C2 28 UNIT A2 29 UNIT B1 30 UNIT A1 39 UNIT B1 95 UNIT A1 96 UNIT B1 97 UNIT A1 98 1 2 3 5 4 8 1 1 8 1 8 1 8 8 1 2 3 2 3 2 3 5 4 5 4 2 3 2 3 5 4 23 2 3 5 4 2 3 5 4 5 4 5 4 5 4 2 3 2 3 5 4 2 3 5 4 2 3 23 2 3 2 3 2 3 2 3 3/4" CW 1 1/2" CW 1 1/4" CW 4" CW 4" CW 1 1/2" CW 1 1/4" CW 4" CW 3" CW 1 1/2" CW 1 1/4" CW 3" CW 1 1/2" CW 2 1/2" CW 1 1/4" CW 1 1/2" CW 2 1/2" CW 2" CW 1 1/2" CW 7 6 1 1/4" CW 1 1/4" CW 1 1/4" CW ARCHITECTCLIENT CONSULTANT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONSKBSO Consulting1344 S Rangeline Rd. Suite 202CARMEL, INDIANA 46032P: 317-344-8044PERMIT SET APRIL 28TH, 2021 20005THE AVANTPHASE IIP102BSECOND FLOORPLUMBING PLAN -AREA BCARMEL,INSHEET KEYNOTES 1 3/4" COLD WATER DROP IN WALL. 1" COLD WATER UP IN WALL ABOVE. 2 4" WASTE STACK IN WALL. 3 4" VENT STACK IN WALL. 4 3" WASTE STACK IN WALL. 5 2" VENT STACK IN WALL. 6 3/4" COLD WATER DOWN IN WALL TO POINT BELOW FLOOR SLAB. 7 1-1/2" COLD WATER DOWN IN WALL TO POINT BELOW FLOOR SLAB. 8 1" COLD WATER DROP IN WALL. 3/4" COLD WATER DOWN TO POINT BELOW FLOOR SLAB. 1" COLD WATER UP IN WALL ABOVE. N 1/8" = 1'-0" SECOND FLOOR PLUMBING PLAN - AREA B 1 GENERAL NOTES A REFER TO DRAWING P000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS, LEGENDS, ABBREVIATIONS, ADDITIONAL GENERAL NOTES AND PLUMBING NOTES. B REFER TO P500 SERIES DRAWINGS FOR PLUMBING DETAILS. C REFER TO P600 SERIES DRAWINGS FOR PLUMBING SCHEDULES. D PROVIDE CEILING ACCESS PANELS AT SHUT-OFF VALVES, CONTROL VALVES, DRAIN VALVES, ETC. THAT ARE LOCATED ABOVE A NON-LAY-IN OR ACCESSIBLE CEILING. E INSTALL ALL PIPING AS HIGH AS POSSIBLE. F ALL PIPING, INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS, AND ADHESIVES ARE TO BE PLENUM RATED WITHIN RETURN AIR PLENUMS, HAVING A FLAME-SPREAD INDEX OF 25 OR LESS, AND A SMOKE-DEVELOPED INDEX OF 50 OR LESS, AS REQUIRED BY CODE. # DESCRIPTION DATE 10/11/21