Loading...
HomeMy WebLinkAboutP103A - THIRD FLOOR PLUMBING PLAN - AREA AEW3EW3EW3EW3EW2bEW3EW3EW3EW3EW3DNUPUNIT C2 99 UNIT A1 100 UNIT B3 118 UNIT A1 119 UNIT A1 120 UNIT A1 121 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 32 3 2 3 2 3 2 3 2 3 2 3 2 3 2 32 3 23 2 3 2 3 2 3 2 3 2 3 2 3 23 23 2 3 2 3 4 5 4 5 4 5 45 2 3 4 5 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 3" FD-2 3" FD-2 3" W 6 6 3" W UNIT B1 146 UNIT B2 154 UNIT A1 144 UNIT B1 153 UNIT C1 142 UNIT B1 152 5 4 5 4 ARCHITECTCLIENT CONSULTANT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONSKBSO Consulting1344 S Rangeline Rd. Suite 202CARMEL, INDIANA 46032P: 317-344-8044PERMIT SET APRIL 28TH, 2021 20005THE AVANTPHASE IIP103ATHIRD FLOORPLUMBING PLAN -AREAACARMEL,INSHEET KEYNOTES 1 1" COLD WATER FROM BELOW FLOOR IN WALL. 3/4" COLD WATER UP IN WALL ABOVE. 2 4" WASTE STACK IN WALL. 3 4" VENT STACK IN WALL. 4 3" WASTE STACK IN WALL. 5 2" VENT STACK IN WALL. 6 3" WASTE UP. N 1/8" = 1'-0" THIRD FLOOR PLUMBING PLAN -AREA A 1 GENERAL NOTES A REFER TO DRAWING P000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS, LEGENDS, ABBREVIATIONS, ADDITIONAL GENERAL NOTES AND PLUMBING NOTES. B REFER TO P500 SERIES DRAWINGS FOR PLUMBING DETAILS. C REFER TO P600 SERIES DRAWINGS FOR PLUMBING SCHEDULES. D PROVIDE CEILING ACCESS PANELS AT SHUT-OFF VALVES, CONTROL VALVES, DRAIN VALVES, ETC. THAT ARE LOCATED ABOVE A NON-LAY-IN OR ACCESSIBLE CEILING. E INSTALL ALL PIPING AS HIGH AS POSSIBLE. F ALL PIPING, INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS, AND ADHESIVES ARE TO BE PLENUM RATED WITHIN RETURN AIR PLENUMS, HAVING A FLAME-SPREAD INDEX OF 25 OR LESS, AND A SMOKE-DEVELOPED INDEX OF 50 OR LESS, AS REQUIRED BY CODE. # DESCRIPTION DATE 1 ASI-01 12/14/2020 10/11/21