HomeMy WebLinkAboutP103B - THIRD FLOOR PLUMBING PLAN - AREA BEW3DNUPUNIT A1 122 UNIT B1 123 UNIT A1 124 UNIT B1 125 UNIT A1 126 UNIT A1 127 UNIT B1 128 1 2 3 5 4 1 1 1 1 1 1 1 1 1 1 23 2 3 2 3 5 4 5 4 2 3 2 3 5 4 23 2 3 5 4 2 3 5 4 5 4 5 4 5 4 2 3 23 5 4 2 3 5 4 2 3 2 3 2 3 2 3 23 2 3 UNIT A2 151 UNIT C2 150 UNIT B1 149 UNIT B1 148 ARCHITECTCLIENT CONSULTANT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONSKBSO Consulting1344 S Rangeline Rd. Suite 202CARMEL, INDIANA 46032P: 317-344-8044PERMIT SET APRIL 28TH, 2021 20005THE AVANTPHASE IIP103BTHIRD FLOORPLUMBING PLAN -AREA BCARMEL,INSHEET KEYNOTES 1 1" COLD WATER FROM BELOW FLOOR IN WALL.3/4" COLD WATER UP IN WALL ABOVE. 2 4" WASTE STACK IN WALL. 3 4" VENT STACK IN WALL. 4 3" WASTE STACK IN WALL. 5 2" VENT STACK IN WALL. N 1/8" = 1'-0" THIRD FLOOR PLUMBING PLAN -AREA B 1 GENERAL NOTES A REFER TO DRAWING P000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS, LEGENDS, ABBREVIATIONS, ADDITIONAL GENERAL NOTES AND PLUMBING NOTES. B REFER TO P500 SERIES DRAWINGS FOR PLUMBING DETAILS. C REFER TO P600 SERIES DRAWINGS FOR PLUMBING SCHEDULES. D PROVIDE CEILING ACCESS PANELS AT SHUT-OFF VALVES, CONTROL VALVES, DRAIN VALVES, ETC. THAT ARE LOCATED ABOVE A NON-LAY-IN OR ACCESSIBLE CEILING. E INSTALL ALL PIPING AS HIGH AS POSSIBLE. F ALL PIPING, INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS, AND ADHESIVES ARE TO BE PLENUM RATED WITHIN RETURN AIR PLENUMS, HAVING A FLAME-SPREAD INDEX OF 25 OR LESS, AND A SMOKE-DEVELOPED INDEX OF 50 OR LESS, AS REQUIRED BY CODE. # DESCRIPTION DATE 10/11/21