HomeMy WebLinkAboutP105A - ROOF PLUMBING PLAN - AREA ATALLCEILINGOVERFRAMINGROOF SLOPE
1/4" PER FT MIN
1
1
1
1
1
1
1
1
1
1
1
1 1
1
1
1
1
1 1
1
1
1 1
1
1
1
2
1
1
1
1
1
1
1
1
1
RH-1
1
1 ARCHITECTCLIENT CONSULTANT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONSKBSO Consulting1344 S Rangeline Rd. Suite 202CARMEL, INDIANA 46032P: 317-344-8044PERMIT SET
APRIL 28TH, 2021
20005THE AVANTPHASE IIP105AROOF PLUMBING PLAN- AREA ACARMEL,INN
1/8" = 1'-0"
ROOF PLUMBING PLAN -AREA A1
GENERAL NOTES
A REFER TO DRAWING P000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS,
LEGENDS, ABBREVIATIONS, ADDITIONAL GENERAL NOTES AND PLUMBING
NOTES.
B REFER TO P500 SERIES DRAWINGS FOR PLUMBING DETAILS.
C REFER TO P600 SERIES DRAWINGS FOR PLUMBING SCHEDULES.
D PROVIDE CEILING ACCESS PANELS AT SHUT-OFF VALVES, CONTROL VALVES,
DRAIN VALVES, ETC. THAT ARE LOCATED ABOVE A NON-LAY-IN OR
ACCESSIBLE CEILING.
E INSTALL ALL PIPING AS HIGH AS POSSIBLE.
F ALL PIPING, INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS, AND
ADHESIVES ARE TO BE PLENUM RATED WITHIN RETURN AIR PLENUMS,
HAVING A FLAME-SPREAD INDEX OF 25 OR LESS, AND A SMOKE-DEVELOPED
INDEX OF 50 OR LESS, AS REQUIRED BY CODE.
SHEET KEYNOTES
1 4" VENT THRU ROOF (VTR).
2 3/4" CW FROM BELOW ROOF TO ROOF HYDRANT (RH-1).
# DESCRIPTION DATE
1 ASI-01 12/14/2020
10/11/21