Loading...
HomeMy WebLinkAboutS0-3C-STANDARD WOOD FRAMING DETAILSTOP PLATE WINDOW HEADER - RE: PLANMIN. ENDLENGTH (L)MIN. ENDLENGTH (L)CSHP20 W/9" END LENGTHS + (7)0.131"X2 12" EA. END, OR RE:CHART BELOW FOR ALTERNATIVE OPTIONS. STRAP SIZEHEADER LENGTH END LENGTH (L) NAILING (EA.END) CS22≤ 6'-0" 11" (8) 10D NAILS CS20 16"6'-0" ≥11'-0" (15) 10D NAILS RE: TYPICAL HEADER CONSTRUCTION DETAIL FOR INFO. NOT SHOWNTOP OF PLATENAILING RE: CHART BELOW ROOF TRUSSES STRAPPING WHERE HEADER IS FLUSH TO TOP PLATEMIN. WORKLENGTH (L)FILL ALLNA I L H O L E S SIMPSON STRAP RE: CHART BELOW NAILING RE: CHART BELOW HEADER - RE: PLANCLIPPING PER UPLIFT CONNECTIONS DETAIL ROOF TRUSS CLIPPING PER UPLIFT CONNECTIONS DETAIL MATCH CLIPPING ABOVE USE LTP4 @ 24" O.C. FOR HEADER TO TOP PLATE 5 TYPICAL HEADER AND BEAM STRAPPING / CLIPPING AT TOP FLOOR CSHP20 W/9" END LENGTHS + (7)0.131"X2 12" EA. END, OR RE:CHART BELOW FOR ALTERNATIVE OPTIONS. 2 TYPICAL STANDALONE POST CONNECTION DETAILS WOOD BEAM RE: PLANS WOOD POST RE: PLANS SIMPSON H8 STRAP ON EACH SIDE OF BEAM (2-TOTAL PER BEAM) SIMPSON H8 STRAP ON EACH SIDE OF BEAM. (2-TOTAL) AT SOLID POSTS: SIMPSON STRONG-TIE ABU POST BASE. SOLID GROUT STANDOFF SPACE WHILE INSTALLING BASEPLATE. INSTALL WITH 58" X 6" TITEN HD ANCHORS. AT WOODTONE REALPOST: SIMPSON STRONG-TIE ECBQ-SDS POST BASE. INSTALL WITH 12" X 6" TITEN HD ANCHORS. WOOD BEAM RE: PLANS INTERSTITIAL OR CRIPPLES TO MATCH POST WIDTH AS REQUIRED CS22 EA. SIDE W/5 12 " END LENGTH (2-TOTAL) OR CSHP20 EA. SIDE W/5 1 2" END LENGTH W/(5)0.131"X2 12" EA. END WOOD POST OR WOODTONE REALPOST RE: PLANS 512" END LENGTH W/ (8)10D NAILS (TYP.)SIMPSON HANGER RE: PLANS (HUCQ U.N.O.) POST OR BEAM (BELOW) ECBQ-SDS POST BASE AT REALPOST. BC POST BASE AT SOLID POSTS, U.N.O. BEAM TO WOODTONE REAL POST - SIDE VIEW 112"MIN.1 12"MIN.C OF BEAM & MIDDLE ROW OF SCREWS L CENTER BEAM SPLICE ON POST POST BASE AND STRAP@ WOOD SINGLE BEAM TO WOOD POST DOUBLE BEAM TO WOOD POST POST BASE @ FOUNDATION PERPENDICULAR BEAMS TO POST WOOD BEAM RE: PLANS WOODTONE REALPOST - RE: PLANS (6) 0.22"Ø X 6" LONG SDWS TIMBER SCREWS. 3~EA. SIDE. CENTER BEAM SPLICE ON POST SINGLE BEAM TO WOODTONE REALPOST DOUBLE BEAM TO WOODTONE REALPOST FRAMING - SIDE VIEW INSTALL SCREWS FROM BACK WHEN BEAM WIDTH IS GREATER THAN HALF THE POST WIDTH. POST WIDTH BEAM WIDTH FLOOR DECKING 4 TYPICAL GIRDER TRUSS LOAD PATH DETAIL 3/4"=1'-0" PLYWOOD FLOOR SHEATHING FRAMING ANCHOR, RE: ROOF TRUSS UPLIFT HARDWARE SCHEDULE GIRDER TRUSS RE: PLAN RE: PLAN@ FLOORSTOP OF PLATERE: STD DETAILS FOR INTERSTITIAL FRAMING REQUIREMENTS. STRAP ALIGNED W/ROOF GIRDER TRUSS. RE:ROOF TRUSS UPLIFT HARDWARE SCHEDULE (2)2X MIN. STUD PACK BENEATH GIRDER TRUSS U.N.O. PROVIDE MATCHING STUD PACK BENEATH GIRDER TRUSS COLUMN AT ALL WALLS BELOW. HOLD DOWN (WHERE REQUIRED) ALIGNED WITH ROOF GIRDER TRUSS. RE:ROOF TRUSS UPLIFT HARDWARE SCHEDULE AND MANUF.RE: PLAN@ FLOORSTOP OF PLATERE: SILL PLATE ANCHORAGE SCHEDULE 3 TYPICAL DOUBLE CLIP INSTALLATION (TOP VIEW) OPTION 1 OPTION 2 IDENTICAL CONNECTORS PLACED DIAGONALLY FROM EA. OTHER. IDENTICAL CONNECTORS PLACED ON SAME SIDE OF WALL. CONFIGURED AS SHOWN. WALL TOP PLATE WALL TOP PLATE MIN. 2X TRUSS MIN. 2X TRUSS IDENTICAL CONNECTORS PLACED ON AS SHOWN ON SINGLE PLY 2X MAY CAUSE THE WOOD TO SPLIT. NOTES: 1. CLIPPED CHORD OF TRUSS MUST EXTEND 3 12 " PAST WALL ON CLIPPED SIDE OF WALL. 2. BOTH CLIPS MUST BE ON THE EXTERIOR OF THE WALL WHEN USING THE PLYWOOD AS EXTERIOR UPLIFT HARDWARE ALTERNATIVE DETAILS. 3. USE 2 12" MIN. NAILS WHEN INSTALLING THROUGH PLYWOOD/OSB SHEATHING. ROOF TRUSS CLIPPING PER THE ROOF FRAMING NOTES IS STILL REQUIRED WHEN USING THIS DETAIL BUT MUST BE INSTALLED ON THE EXTERIOR OF THE WALL. NAILING ATTACHED TO TOP PLY ONLY. SEE SCHEDULE FOR SPACING. NAILING ATTACHED TO SPLICE PLATE. SEE CHART FOR SPACING.NO HORIZONTALJOINTS PERMITTED ROOF TRUSS 12"GAPFULL SIZED PLYWOOD/OSB SHIM. MUST BE OF THE SAME THICKNESS, GRADE AND STRENGTH AXIS ORIENTATION AS THE WALL SHEATHING 2X4 SYP/DFL #2 BLOCKING 34"3 8" 38 " S PANEL EDGE BOUNDARY NAILING REF WALL SHEATHING SCHEDULE FIELD NAILING, REF WALL SHEATHING SCHEDULE STUDS RE: WALL SCHEDULE FOR SPACING 12"38" 3 8" TOP OF PLYWOOD FLUSH W/ TOP OF PLATE PANEL EDGE BOUNDARY NAILING REF WALL SHEATHING SCHEDULE FIELD NAILING, REF WALL SHEATHING SCHEDULE STUDS RE: WALL SCHEDULE FOR SPACING REF UPLIFT NAILING SCHEDULE FOR SPACING 12"12" STAGGER12"REF UPLIFT NAILING SCHEDULE FOR SPACING 12" 12"34"REF UPLIFT NAILING SCHEDULE FOR SPACING REF UPLIFT NAILING SCHEDULE FOR SPACING 34 "34 "REF UPLIFT NAILING SCHEDULE FOR SPACING 12"12" STAGGERREF UPLIFT NAILING SCHEDULE FOR SPACING REF UPLIFT NAILING SCHEDULE FOR SPACING 2X4 #2 SYP/DFL BLOCKING W/ PLYWOOD SHIM, REF SIDE VIEW DETAIL 2X4 #2 SYP/DFL BLOCKING W/ PLYWOOD SHIM, REF SIDE VIEW DETAIL UPLIFT SHEATHING NAILING SCHEDULE 3" W3 SHEARWALL CONDITIONS REQUIRED NAIL SPACING AT HORIZONTAL PLYWOOD PANEL JOINTS/EDGES & ALL SOLE PLATES 4" 3" 3" NOTES 1. NAILING AT 2" O.C. AND CLOSER MUST BE INSTALLED IN TWO STAGGERED ROWS WITH A 1/2" OFFSET, REFERENCE ASSOCIATED DETAILS. 2. NAILING SHOWN IS FOR 8D OR 0.131"X3" NAILS AND IS TO BE USED IN LIEU OF THE SCHEDULED SHEARWALL NAILING AT ALL HORIZONTAL PANEL JOINTS. STAPLES OR OTHER SIZE NAILS MAY NOT BE SUBSTITUTED. 3. W5, W7, AND DOUBLE PLYWOOD SHEATHED SHEARWALL LOCATIONS, AS WELL AS "N/A" CONDITIONS IN THE CHART ABOVE, MAY NOT USE PLYWOOD FOR UPLIFT AND MUST HAVE CONVENTIONAL HARDWARE INSTALLED AS DETAILED. 4. LAPPING PLYWOOD ACROSS THE FLOOR CAVITY CARRIES WITH IT AN INHERENT RISK OF BUCKLING OF THE SHEATHING DUE TO WOOD SHRINKAGE SINCE GAPPING AT JOINTS CANNOT BE PROVIDED. FRAMER SHOULD TAKE JOB SITE AND MATERIAL CONDITIONS INTO ACCOUNT PRIOR TO CHOOSING THIS OPTION. CONTACT THE AMERICAN PLYWOOD ASSOCIATION FOR GUIDANCE ON HOW TO LOWER THIS RISK. SINGLE ROW NAILING SCHEMATIC STAGGERED ROW NAILING SCHEMATIC NON-SHEARWALL CONDITIONS 1 OSB AS EXTERIOR UPLIFT HARDWARE ALTERNATIVE DETAILS UPLIFT NAILING SPACING REQUIRED PER UPLIFT DETAILS W1 SHEARWALL CONDITIONS 6" 4" 2", STAG 1.5", STAG UNS1 UNS2 UNS3 UNS4 UNS5 UNS6 2", STAG 2", STAG 2", STAG 1.5", STAG 1.5", STAG 2", STAG 2", STAG 1.5", STAG 1.5", STAG N/A 3 12" MIN. EXTENSION REQUIRED ON CLIPPED CHORD FLUSH PANELS TO TOP OF TOP PLATE SYP/DFL TOP PLATES REQUIRED ROOF TRUSS NO HORIZONTALJOINTS PERMITTED12 "GAP2X4 #2 SYP/DFL BLOCKING FLOORFRAMINGCAVITY, TYP.NO HORIZONTALJOINTS PERMITTED @ ROOF @ FLOORS @ CONCRETE FLUSH PANELS TO BOTTOM OF SILL PLATE FOUNDATION OR PODIUM SYP/DFL SILL PLATE REQUIRED, REF SILL AND SOLE PLATE ANCHORAGE SCHEDULE (6", 4" & 3" NAILING ONLY) (REQUIRED AT 2" & 1 1/2" NAILING)12"12" STAGGER(2) 2X SYP/DFL TOP PLATE OPTIONAL SPLICE AT HORIZONTAL JOINTS NOT SHOWN, MATCH BLOCKING & NAILING REQUIREMENTS AT WALL CONDITIONS ALTERNATE AT PARAPET CONDITIONS TO REPLACE TOP PLATE TO STUD CLIP ALTERNATE @ PARAPET OR HIGH HEEL TRUSSNO HORIZONTAL PANEL JOINTSEXCEPT AT BLOCKEDWALL CONDITIONSNAILING ATTACHED TO TOP PLY ONLY. SEE SCHEDULE FOR SPACING. ROOF TRUSS CLIPPING PER THE ROOF FRAMING NOTES IS STILL REQUIRED WHEN USING THIS DETAIL BUT MUST BE INSTALLED ON THE EXTERIOR OF THE WALL. NAILING ATTACHED TO SILL PLATE. SEE CHART FOR SPACING. (DOES NOT REPLACE HEADER STRAPPING, SHEARWALL HARDWARE, OR TRUSS CLIPPING) FULL SIZED PLYWOOD/OSB SHIM. MUST BE OF THE SAME THICKNESS, GRADE AND STRENGTH AXIS ORIENTATION AS THE WALL SHEATHING NAILING ATTACHED TO SILL PLATE. SEE CHART FOR SPACING. CONCRETE SUPPORT PER NON-UPLIFT CONDITION ANCHORAGE REQUIRED, RE: SILL+SOLE PLATE ANCHORAGE SCHED. PER NON-UPLIFT CONDITION ANCHORAGE REQUIRED, RE: SILL+SOLE PLATE ANCHORAGE SCHED. ROOF FRAMING (HEIGHT AND ORIENTATION VARIES)UNS1 PLATE CLIPPING & STUD STRAPPING SHOWN MAY POTENTIALLY BE OMITTED PER THE OSB AS EXTERIOR UPLIFT HARDWARE ALTERNATIVE DETAILS USING THE UPLIFT NAILING SHOWN HERE FOR EACH WALL AREA. REF THE DETAIL FOR REQUIREMENTS & LIMITATIONS. SIMPSON CLIP @ EACH TRUSS END. RE: ROOF FRAMING NOTES FLOOR FRAMING (ORIENTATION MAY VARY) FLOOR FRAMING (ORIENTATION MAY VARY) FLOOR FRAMING (ORIENTATION MAY VARY)UNS1 CLIP OPTIONS SP-2 DFL/SYP TSP SPACING (IN.) SPF/HF 48 48 48 48 CLIP OPTIONS SP-2 DFL/SYP TSP SPACING (IN.) SPF/HF 48 48 48 48 48 48 STRAP OPTIONS SPACING (IN.) CS20 CSHP20 48 48 STRAP OPTIONS SPACING (IN.) CS20 CSHP20 FOUR STORY AREAS EXTERIOR CONDITION FOUR STORY AREAS INTERIOR CONDITION NOTES: 1. SP2 CLIP MUST BE INSTALLED ON A SINGLE STUD. WHERE DOUBLE STUDS ARE PRESENT USE SIMPSON TSP OPTION ONLY. 2. INSTALL ALL CLIPS & STRAPS WITH CONFIGURATION, FASTENERS, & CUT LENGTHS AS REQUIRED BY SIMPSON TO ACHIEVE MAX. CATALOG LOADS. 3.FLOOR CAVITY STRAPPING CARRIES WITH IT AN INHERENT RISK OF BUCKLING OF THE STRAPS DUE TO WOOD SHRINKAGE. CONTACT SIMPSON STRONG-TIE FOR GUIDANCE ON HOW TO LOWER THIS RISK. 4. TSP CLIPS MAY BE REPLACED W/ (2) SIMPSON SDWC 15600 SCREWS AT SAME SPACING. 5. SP-1 CLIPS MAY BE REPLACED W/ (2) SIMPSON SDWC 15450 SCREWS AT SAME SPACING. 6.WHERE INWARD OR OUTWARD CHANGES IN THE VERTICAL WALL PLANE OCCUR, WRAP FLOOR STRAPS AROUND SUPPORTING FRAMING AND CONTINUE STRAPPING PATH AT THE SUPPORTS OF THOSE FRAMING MEMBER(S), STARTING FROM THE MEMBER, AND CONTINUING DOWN PER THE DETAIL, U.N.O. IN PLAN OR FLOOR SECTIONS. 7. TOP PLATE CLIPS MUST BE ON THE SAME SIDE OF STUD AS ROOF FRAMING CLIPPING. 8 UPLIFT CONNECTION DETAIL (REQUIRED AT ALL ROOF FRAMING BEARING POINTS) 1/4 W8X18 HOIST BEAM (U.N.O. IN PLAN) BEAR 3-1/2" EA END ⅊ 1 2" X 6"X4" W/ (2) 1 2"Ø X4" H.S. BOND BEAM RE: SPECS. 8" CMU WALL RE: SPECS. FOR REINF. 2" SOAP GROUT SOLID AFTER BEAM INSERTION 6 HOIST BEAM DETAIL @ CMU WALLS TYPICAL ELEVATOR SHAFT 7 TYPICAL WOOD STAIR FRAMING DETAIL STAIR MIDSPAN SUPPORT WALL (OR BEAM, SIM.) WHERE REQ'D TO REDUCE STRINGER SPAN TO SCHEUDLED MAX RE: ARCHRE: ARCH 2x12 CUT STRINGERS @ 12" O.C. FOR TREAD AND RISER SUPPORT 51 2" MIN TH R O A T ON CUT STRI N G E R S 2x SILL PLATE RIPPED TO SIZE RE: SILL & SOLE PLATE ANCHORAGE SCHEDULE STAIR SUPPORT BEAM, RE: PLAN BLOCKING AS REQ'D STRINGER SPACING RE: SCHEDULE STAIR TREAD, RE: ARCH 2x12 CUT STRINGER CLIPPING, RE: SCHEDULE STAIR SUPPORT BEAM, RE: PLAN SCAB MEMBERS RE: SCHEDULE RE: ARCHRE: ARCH 2x SOLE PLATE RIPPED TO SIZE, RE: SILL & SOLE PLATE ANCHORAGE SCHEDULE RE: ARCHRE: ARCH STAIR SUPPORT BEAM, RE: PLAN 4x2 BLOCKING @ 12" O.C. W/ (2) 0.131" x 3" TOENAILS @ EACH END RE: DETAILS FOR ALTERNATE BEARING CONDITIONS FLOOR FRAMING, TYPE AND ORIENTATION MAY VARY, RE: ARCH CLOSED TOE BOARD PER ARCH CLIPPING, RE: SCHEDULE NOTES: 1. 10 PSF MAX DEAD LOAD ALLOWABLE (NO CONCRETE OR GYP TOPPING; 2 PSF MAX FLOORING). CONTACT ISC FOR MAXIMUM SPANS FOR HIGHER DEAD LOADS. 2. A34 CLIPS SCHEDULED ABOVE ARE TO BE INSTALLED USING #9 x 1 3 4" SD SCREWS PER SIMPSON REQUIREMENTS. 3. ALL SCABS SHOULD BE ATTACHED TO STRINGERS USING (2) ~ 0.131" x 3" NAILS @ 3" O.C. 4. ALL CONVENTIONAL LUMBER TO BE #2 SYP. LVL SCABS SHOULD BE 2.0E AND 2,600 Fb, MIN. 5. MULTIPLE MIDSPAN SUPPORT WALLS OR BEAMS MAY BE INSTALLED TO REDUCE THE EFFECTIVE SPAN AS REQUIRED, HOWEVER NO SINGLE SPAN SHOULD EXCEED THE MAXIMUM SPAN LISTED IN THIS SCHEDULE. SPANS ARE MEASURED HORIZONTALLY ONLY. 6. BOTTOM OF STRINGERS MUST BE SHEATHED WITH GYPSUM OR OSB OR BRACED WITH 2x4 SCABS @ 24" O.C. SECTION C-C SECTION D-D SCAB TYPE CONVENTIONAL WOOD-FRAMED STAIR SCHEDULE (2) 2x6 (1) EACH SIDE REQUIRED CLIPPING AT EACH STRINGER END CONNECTION STRINGER SPAN (MAX) (2) 2x12 (1) EACH SIDE STRINGER SPACING DESIGN LIVE LOADING 10'-0" 15'-6" 19'-0" (2) 13 4 " x 111 4" LVL (1) EACH SIDE 12" O.C. MAX 24" O.C. MAX 7'-6" (2) 2x6 (1) EACH SIDE (1) A34 (2) A34 (2) A34 (2) A34 11'-0" (2) 2x12 (1) EACH SIDE (3) A34 16'-6" (2) 134" x 1114" LVL (1) EACH SIDE (4) A34 PUBLIC (100 PSF) 2x6 2x12 11'-6" 16'-0" 19'-0" 134" x 1114" LVL 12" O.C. MAX 24" O.C. MAX 9'-0" (1) A34 (2) A34 11'-0" PRIVATE (40 PSF) (1) A34 2x6 2x12 (2) A34 (1) A34 16'-6" 134" x 1114" LVL (2) A34 STRINGER SPACING RE: SCHEDULE STAIR SUPPORT BEAM, RE: PLAN WOOD STAIR CONCRETE BEARING CONDITION WOOD STAIR FLOOR BEARING CONDITION D C C SCAB MEMBERS, RE: SCHEDULE CLIPPING, RE: SCHEDULE D STANDARD WOOD FRAMING DETAILS 3/4" = 1'-0" S0-3C SHEET NUMBER AVANT PHASE II 18290 OLD MERIDIAN ST CARMEL, INDIANA ISSUE DATE ISSUE TITLE SHEET TITLE DRAWING SCALE PROJECT NUMBER PROJECT NAME & LOCATION 609.002.020 CAD / ENG The words around this title block reflect the values and definition of Integrity Structural Corp. and do not include any notes pertaining to the drawings for this project. For God so loved the world that he gave his one and only Son, that whoever believes in him shall not perish but have eternal life. For God did not send his Son into the world to condemn the world, but to save the world through him. Whoever believes in him is not condemned, but whoever does not believe stands condemned already becauscree en él no es condenado, pero el que no cree ya está condenado por no haber creído en el nombre del Hijo unigénito de Dios. Ésta es la causa de la condenación: que la luz vino al mundo, pero la humanidad prefirió las tinieblas a la luz, porque sus hechos eran perversos. Pues todo el que hace lo malo aborrece la luz, y no se acerca a ella por temor a que sus obras queden al descubierto. En cambio, el que practica la verdad se acerca a la luz, para que se vea claramente que ha hecho sus obras en obedienin the name of God's one and only Son. This is the verdict: Light has come into the world, but men loved darkness instead of light because their deeds were evil. Everyone who does evil hates the light, and will not come into the light for fear that his deeds will be exposed. But whoever lives by the truth comes into the light, so that it may be seen plainly that what he has done has been done through God. (John 3:16-21, NIV). Therefore Jesus said again, "I tell you the truth, I am the gate for the sheep. All who ever came before me were thieves and robbers, but the sheep did not listen to them. I am the gate; whoever enters through me will be saved. He will come in and go out, and find pasture. The thief comes only to steal and kill and destroy; I have come that they may have life, and have it to the full. (John 10: 7-10, NIV) Jesus answered, "I am the way and the truth and the life. No one comes to the Father except through me." (John 14:6, NIV) These bible verses reflect Integrity Structural Co CONSTRUCTION@ INTEGRITYSTRUCTURAL.COM 12777 JONES RD., STE 388 HOUSTON, TX 77070 281 894 7099 09/08/2020 DD SET AD / RA 10/16/2020 PROGRESS SET AD / RA 04/28/2021 PERMIT SET AD / RA 10/11/21