Loading...
HomeMy WebLinkAboutSD1-1-FOUNDATION DETAILSA SCHEDULE SCALE: 3/4" = 1'-0" 2X WALL RE: PLAN ANCHORAGE, RE: SCHEDULE WIDTH RE: SCHED.3"CLR.FIN. FLOORSLAB REINFORCEMENT, 6X6 W1.4 X W1.4 WIRE MESH - RE: SPECS OF WALL(S), FOOTING, AND REINFORCING 4"2X WALL RE: PLAN ANCHORAGE, RE: SCHEDULE WIDTH RE: SCHED.EMBEDMENT - RE: SCHEDULE 2"CLR.FINISHED GRADE RE: CIVIL 3" CLR.8" MIN.12" MAX.EXPOSUREFIN. FLOOR2" CLR.SLAB REINFORCEMENT, 6X6 W1.4 X W1.4 WIRE MESH - RE: SPECS OF FOOTING AND REINFORCING (2) #4 CONT.4"FOOTING REINFORCING, RE: SCHEDULE #4 @ 18" O.C. 24"AS REQUIRED8"B TYPICAL 2-POUR CONVENTIONAL EXTERIOR STRIP FOOTING DETAIL SCALE: 3/4" = 1'-0" C TYPICAL 2-POUR CONVENTIONAL INTERIOR STRIP FOOTING DETAIL (UNHEATED) SCALE: 3/4" = 1'-0" 2" CLR.CL CL 2"CLR.2"CLR.2X WALL RE: PLAN ANCHORAGE, RE: SCHEDULE WIDTH RE: SCHED. 2"CLR.3"CLR.FIN. FLOORSLAB REINFORCEMENT, 6X6W1.4 X W1.4 WIRE MESH - RE: SPECS OF WALL(S), FOOTING, AND REINFORCING 4"#4 CONT. D TYPICAL CONVENTIONAL THICKEND SLAB FOOTING DETAIL (HEATED) SCALE: 3/4" = 1'-0" CL 12"12" AS REQUIRED BOTTOM REINFORCING, RE: SCHEDULETYPDEPTHRE: SCHEDULECONT. INSUL. PER ARCH.EMBEDMENT - RE: SCHED.FOOTING REINFORCING, RE: SCHEDULE TOOL AND SEAL COLD JOINT RE: PLANVARIES,RE: PLAN#4 CONT. IN TOP OF CURB #4 @ 18" O.C. W/ 180° HOOK AT TOP8"RE: PLANFIN. FLR.RE: CIVILFIN. FLR.FIN. FLOORRE: ARCH FOR SLOPE WHERE PRESENT WIDTH RE: SCHED.RE: PLANFIN. FLR.WIDTH RE: SCHED. (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) WIDTH RE: SCHED.RE: CIVIL FIN. FLR.4" MAX,RE: PLAN3 DROPPED EXTERIOR STRIP FOOTING SCALE: 3/4" = 1'-0" RE:ARCH. FOR SLOPE WHERE PRESENT (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN)RE: PLANFIN. FLR.WIDTH RE: SCHED.VARIES,RE: PLAN1 EXTERIOR STRIP FOOTING W/ LEDGE SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) WIDTH RE: SCHED.RE: ARCHRE:PLAN 4 NOT USED SCALE: 3/4" = 1'-0"(SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) 7 INTERIOR FOOTING (HEATED ON BOTH SIDES) SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) 2 EXTERIOR STRIP FOOTING SCALE: 3/4" = 1'-0" 5 INTERIOR STRIP FOOTING (UNHEATED) SCALE: 3/4" = 1'-0"(SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) BRICK VENEER, RE: ARCH. 39 PSF MAX WEIGHT OMIT DOWEL 8"TOOL AND SEAL COLD JOINT 6 INTERIOR FOOTING (UNHEATED ON ONE SIDE) SCALE: 3/4" = 1'-0" WIDTH RE: SCHED. (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN)9 STRIP FOOTING @ CONSTRUCTION JOINT SCALE: 3/4" = 1'-0" EMBEDMENTRE: SCHED.WIDTH/2 RE: SCHED. 8" MIN. 2x6 KEYWAY @ MID-DEPTH WIDTH/2 RE: SCHED. 8" MIN.FIN. FLOOR10 THICKENED SLAB @ CONSTRUCTION JOINT SCALE: 3/4" = 1'-0" TOOL AND SEAL JOINT 12", TYP. (2) #4 CONT. IN PLACE OF SCHEDULED REINFORCEMENT (2) #4 CONT. IN PLACE OF SCHEDULED REINFORCEMENT #4 @ 16"O.C. #4 @ 16"O.C.2" CLR.TYP.3" CLR. TYP.2" CLR.TYP.3" CLR. TYP. #4 x 5'-0" LONG @ 18" O.C. (CENTER ON JOINT) 12", TYP. (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) 12 STEM WALL DETAIL SCALE: 3/4" = 1'-0" SLAB REINFORCEMENT, 6X6 W1.4 X W1.4 WIRE MESH - RE: SPECS #5 CONT BAR T&B, W/ #3 "U" TIES @ 16" O.C 4"WIDTH RE: SCHED.EMBEDMENT - RE: SCHED. 3'-0" - MAXFIN. FLOOR512" BRICK LEDGE #4 CONT. @ TOP (2) #4 CONT. @ BOT. FOOTING REINFORCING, 2 - #5 @ 12" O.C. MAX (VERTICALLY) 512"3"CLR.3" CLR. 16" AS REQ'D #5 @ 8" O.C. CTR CTR RE: ARCH.1'-0"(SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN)4"Re: Plan1'-4" #5 @ 8" o.c. 18" 18"AS REQ'D.2"Clr3" ClrWaterstop at each joint 1'-0" #5 @ 8" o.c. EW (Top and Bottom) Hook Ends (Typ) 2 Add'l #5 (Bottom)1'-0" (Verify withElevator Manuf.)Verify sump pit depth and location w/ equip. purchased #5 @ 9" o.c. vertical ea. face (8" Hook) #5 @ 8" o.c. EW (Top and Bottom) Hook Ends (Typ) Provide GratePer Architect. CMU W/ REINF - RE: SPECS 2 x Keyway FIN. FLR.ELEVATOR PIT DEPTH(VERIFY WITH ELEVATOR MANUF.)2'- 0" EMBED DWLW/ HOOKED ENDSRe: Arch. for waterproofing #5@8" o.c. 1'-0"3" CLR.TO HOOK8"Cont. #5 2 x Keyway RE: ELEVATOR MANUF. DRAWINGS FOR ALL RAIL, LADDER, SILL ANGLE, GRATE, ETC. EMBEDS REQ'D. SHORE WALL UNTIL UPPER SLAB IS STRESSED.1'-0"15 ELEVATOR PIT DETAIL SCALE: 3/4" = 1'-0" 6X6 W1.4 X W1.4 WIRE MESH RE: SPECS #4 CONT. 2-#5 BARS Vapor Barrier4" MAX,RE: PLANCONT. #3 #3 W/180°HOOK 18" LONG @18"O.C. RE:PLAN 8 NOT USED SCALE: 3/4" = 1'-0"(SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) 14 GRAVITY FOOTING @ EXTERIOR BOX COLUMN SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) PAVING BY OTHERS POUR TIGHT TO FNDN 4'-6" X 4'-6" RE: PLAN 1'-0"2X STUD BOX COL. RE: PLAN PROVIDE (2) ADD. #3 TIES IN TOP 5"3" CLR.8~#4 VERT W/ 10" ACI HOOK #3 TIES @ 12" O.C. (6) #4 BOT. REINF. BARS EA. WAY 3" CLR.3" CLR. C OF BOX COLUMN AND FOOTING L 2'-6" MIN. WIDTH RE: SCHED. RE: CIVILFIN. FLR.RE: ARCH11 DROPPED EXTERIOR STRIP FOOTING W/ DOOR POCKET SCALE: 3/4" = 1'-0" RE:ARCH. FOR SLOPE WHERE PRESENT (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) OMIT DOWEL FORM DOOR POCKET PER ARCH. GRANULAR BACKFILL SHALL BE LESS THAN 10% BY DRY UNIT WEIGHT IN FINES, BE WELL GRADED, WITH NO PARTICLES GREATER THAN 3", AND CONTAIN NO DELETERIOUS MATERIALS PER THE GEOTECH. MATERIALS SHALL BE COMPACTED TO MEET PROJECT SPECS. GRANULAR BACKFILL RE: ARCH FOR SLOPE WHERE PRESENTRE: PLANFIN. FLR.WIDTH RE: SCHED.4" MAXRE: PLAN8"TOOL AND SEAL COLD JOINT OF WALL(S), FOOTING, AND REINFORCING CL RE: PLANFIN. FLR.WIDTH RE: SCHED. 8"TOOL AND SEAL COLD JOINT OF JOINT, FOOTING, AND REINFORCINGCL 2" 2", TYP. (2) ROWS OF DOWELS STAGGERED @18" O.C. 1 11'-0"(2) #6 CONT. 3 1 2" CLR. FROM EXT. FACE 2~ #5 @ EA. PERPENDICULAR FOOTING 13 STEM WALL DETAIL @ INTERSECTING FOOTING SCALE: 3/4" = 1'-0" (SEE DETAIL 12/SD1-1 FOR INFORMATION NOT SHOWN) BOTTOM OF INTERSECTING FOOTING BEYOND FOOTING BOT. REINF. TERMINATE AT FAR END OF STEM WALL WITH ACI HOOK 3" CLR. FLOOR FRAMING DETAILS ############ SD1-1 SHEET NUMBER AVANT PHASE II 18290 OLD MERIDIAN ST CARMEL, INDIANA ISSUE DATE ISSUE TITLE SHEET TITLE DRAWING SCALE PROJECT NUMBER PROJECT NAME & LOCATION 609.002.020 CAD / ENG The words around this title block reflect the values and definition of Integrity Structural Corp. and do not include any notes pertaining to the drawings for this project. For God so loved the world that he gave his one and only Son, that whoever believes in him shall not perish but have eternal life. For God did not send his Son into the world to condemn the world, but to save the world through him. Whoever believes in him is not condemned, but whoever does not believe stands condemned already becauscree en él no es condenado, pero el que no cree ya está condenado por no haber creído en el nombre del Hijo unigénito de Dios. Ésta es la causa de la condenación: que la luz vino al mundo, pero la humanidad prefirió las tinieblas a la luz, porque sus hechos eran perversos. Pues todo el que hace lo malo aborrece la luz, y no se acerca a ella por temor a que sus obras queden al descubierto. En cambio, el que practica la verdad se acerca a la luz, para que se vea claramente que ha hecho sus obras en obedienin the name of God's one and only Son. This is the verdict: Light has come into the world, but men loved darkness instead of light because their deeds were evil. Everyone who does evil hates the light, and will not come into the light for fear that his deeds will be exposed. But whoever lives by the truth comes into the light, so that it may be seen plainly that what he has done has been done through God. (John 3:16-21, NIV). Therefore Jesus said again, "I tell you the truth, I am the gate for the sheep. All who ever came before me were thieves and robbers, but the sheep did not listen to them. I am the gate; whoever enters through me will be saved. He will come in and go out, and find pasture. The thief comes only to steal and kill and destroy; I have come that they may have life, and have it to the full. (John 10: 7-10, NIV) Jesus answered, "I am the way and the truth and the life. No one comes to the Father except through me." (John 14:6, NIV) These bible verses reflect Integrity Structural Co CONSTRUCTION@ INTEGRITYSTRUCTURAL.COM 12777 JONES RD., STE 388 HOUSTON, TX 77070 281 894 7099 09/08/2020 DD SET AD / RA 10/16/2020 PROGRESS SET AD / RA 04/28/2021 PERMIT SET AD / RA 10/11/21