Loading...
HomeMy WebLinkAbout20210923_AvantPhase2_CFD-Response 2 West Main Street, Carmel, IN 46032 317.810.1502 www.studiomarchitecture.net City of Carmel CFD Plan Comments Avant Apartments Phase 2 Studio M Project No. #20011 Date Received: 09/22/2021 Date of Response: 09/23/2021 Response: The complete scope of the Fire Protection system will be finalized during construction and be submitted for review. The final drawings will show compliance. Issued By Architect: _____________________________________________________________________________________ Signature Printed Name & Title Date Per Section 905.4 item 6 of the IFC, two additional hose valves must be added on each floor. One on each side of the two fire wall that separates sections A and B of the Building. 905.4 Location of Class I standpipe hose connections. Class I standpipe hose connections shall be provided in all of the following locations: 6. Where the most remote portion of a non sprinklered floor or story is more than one hundred fifty (150) feet from a hose connection or the most remote portion of a sprinklered floor or story is two hundred (200) feet from a hose connection, additional hose connections shall be provided in approved locations. Alex D Marsh, Architect Sept. 23, 2021