HomeMy WebLinkAbout20210923_AvantPhase2_CFD-Response
2 West Main Street, Carmel, IN 46032 317.810.1502 www.studiomarchitecture.net
City of Carmel CFD Plan Comments
Avant Apartments Phase 2
Studio M Project No. #20011
Date Received: 09/22/2021
Date of Response: 09/23/2021
Response:
The complete scope of the Fire Protection system will be finalized during construction and be submitted
for review. The final drawings will show compliance.
Issued By Architect:
_____________________________________________________________________________________
Signature Printed Name & Title Date
Per Section 905.4 item 6 of the IFC, two additional hose valves must be added on each floor. One on each
side of the two fire wall that separates sections A and B of the Building.
905.4 Location of Class I standpipe hose connections.
Class I standpipe hose connections shall be provided in all of
the following locations:
6. Where the most remote portion of a non sprinklered
floor or story is more than one hundred fifty (150) feet
from a hose connection or the most remote portion of a
sprinklered floor or story is two hundred (200) feet
from a hose connection, additional hose connections
shall be provided in approved locations.
Alex D Marsh, Architect Sept. 23, 2021