1. THESE GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS AND
ARE NOT SPECIFIC TO ANY DISCIPLINE
2. IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY TO REVIEW AND
COORDINATE THE WORK OF ALL SUBCONTRACTORS, TRADES AND
SUPPLIERS WITH THE REQUIREMENTS OF THE CONTRACT BEFORE
COMMENCING CONSTRUCTION, AND ASSURE THAT ALL PARTIES ARE
AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE
REQUIREMENTS OCCUR IN THE CONTRACT DOCUMENTS, WHICH MIGHT
AFFECT THE WORK OF THAT PARTY.
3. 0'-0" CORRESPONDS TO 862.35' ON CIVIL DRAWINGS.
4. THE WORK DESCRIBED BY THE DRAWINGS OF ANY OF THE DISCIPLINES
MAY BE AFFECTED BY THE WORK DESCRIBED ON DRAWINGS OF
ANOTHER DISCIPLINE AND MAY REQUIRE REFERENCE TO THE DRAWINGS
OF ANOTHER DISCIPLINE. PARTIAL SETS OF DRAWINGS ARE
INCOMPLETE AND SHOULD NOT BE DISTRIBUTED OR UTILIZED BY THE
GENERAL CONTRACTOR.
5. THE GENERAL CONTRACTOR SHALL ENDEAVOR TO IDENTIFY AND
NOTIFY THE ARCHITECT/ENGINEER OF CONFLICTS BETWEEN THE
WORK OF DIFFERENT PARTIES AT THE EARLIEST POSSIBLE DATE SO AS
TO ALLOW REASONABLE AND ADEQUATE TIME FOR THE CONFLICT TO
BE RESOLVED WITHOUT DELAYING WORK. ALL DEVIATIONS FROM
THAT WHICH IS REQUIRED BY THE CONTRACT DOCUMENTS MUST BE
APPROVED IN ADVANCE BY THE ARCHITECT/ENGINEER AND OWNER.
6. THE GENERAL NOTES, SYMBOLS AND DEFINITIONS APPLICABLE ONLY
TO EACH DISCIPLINE CAN BE FOUND AT THE FRONT OF EACH
DISCIPLINE'S PORTION OF THE SET OF DRAWINGS AND IT IS LISTED AS
PART OF THE OVERALL PROJECT INDEX OF DRAWINGS.
7. BASIC FIRE PROTECTION AND EXITING CONCEPTS ARE ILLUSTRATED BY
THE CODE PLANS.
8. THE DRAWINGS MAY REFERENCE TO AND/OR ILLUSTRATE ITEMS WHICH
ARE NOT PART OF THE WORK OF THE CONTRACT. THESE 'NOT IN
CONTRACT' ITEMS AS INDICATED ARE REFERENCED AND/OR
ILLUSTRATED FOR THE CONTRACTOR'S REFERENCE, INFORMATION AND
COORDINATION ONLY.
9. THE GENERAL CONTRACTOR IS RESPONSIBLE TO COMPLY WITH ALL
APPLICABLE LAWS, CODES, REGULATIONS AND ORDINANCES OF THE
PLACE (CITY, COUNTY, DISTRICT, AND STATE) WHERE THE PROJECT IS
LOCATED. ALTHOUGH SUCH REQUIREMENTS MAY NOT BE REFLECTED BY
THESE DRAWINGS AND SPECIFICATIONS.
10. THE GENERAL CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS
AND SIMILAR RELEASES REQUIRED FOR THE CONSTRUCTION AND
OCCUPANCY OF THE PROJECT. THE GENERAL CONTRACTOR SHALL
FURNISH COPIES OF ALL SUCH ITEMS TO THE OWNER AND ARCHITECT
WITHIN 10 DAYS OF RECEIPT OF SUCH ITEMS. IF PERMITS ARE ISSUED
SUBJECT TO CERTAIN CONDITIONS OR REVISIONS TO THE WORK OR IF
PERMITS ARE DELAYED FOR ANY REASON, THE GENERAL
CONTRACTOR SHALL NOTIFY THE OWNER AND ARCHITECT PROMPTLY.
11. THE GENERAL CONTRACTOR SHALL TAKE PRECAUTIONS TO MAINTAIN
AND PROTECT NEW WORK AS WELL AS EXISTING SYSTEMS AND
ELEMENTS WHICH ARE TO REMAIN. ANY DAMAGE TO SUCH SYSTEMS AND
ELEMENTS SHALL BE IMMEDIATELY REPAIRED IN A MANNER
ACCEPTABLE TO THE ARCHITECT / ENGINEER. IF SATISFACTORY
REPAIRS CANNOT BE MADE, THE GENERAL CONTRACTOR SHALL
REPLACE SYSTEMS AND ELEMENTS WITH 'LIKE NEW' QUALITY
ACCEPTABLE TO THE ARCHITECT / ENGINEER. ALL REPAIRS AND
REPLACEMENT COST SHALL BE THE FINANCIAL RESPONSIBILITY OF THE
GENERAL CONTRACTOR.
12. ALL WORK ON THE DRAWINGS AND IN THE SPECIFICATIONS SHALL BE
BASE BID UNLESS SPECIFICALLY NOTED TO BE BY ALTERNATE BID.
13. DO NOT SCALE DRAWINGS. REFER DIMENSION QUESTIONS TO
ARCHITECT FOR INTERPRETATION.
PROJECT GENERAL NOTES
1. THESE GENERAL NOTES APPLY TO ALL ARCHITECTURAL DRAWINGS.
2. REFER TO THE 'PROJECT GENERAL NOTES' FOR ALL GENERAL NOTES
APPLICABLE TO ALL DRAWINGS OF ALL DISCIPLINES.
3. FOR GENERAL NOTES AND SYMBOLS APPLICABLE ONLY TO THE
DRAWINGS OTHER THAN ARCHITECTURE, REFER TO THE SPECIFIC
DRAWINGS OF THAT DISCIPLINE.
4. PARTIAL SETS OF DRAWINGS ARE INCOMPLETE AND SHALL NOT BE
DISTRIBUTED NOR UTILIZED BY THE CONTRACTOR. IT IS THE GENERAL
CONTRACTOR'S RESPONSIBILITY TO REVIEW AND COORDINATE THE
WORK OF ALL SUBCONTRACTORS, TRADES, AND SUPPLIERS WITH THE
REQUIREMENTS OF THE CONTRACT BEFORE COMMENCING
CONSTRUCTION AND TO ASSURE THAT ALL PARTIES ARE AWARE OF ALL
REQUIREMENTS REGARDLESS OF WHERE THE REQUIREMENTS OCCUR IN
THE CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE WORK OF THAT
PARTY.
5. THESE NOTES ARE ONLY APPLICABLE TO THIS PERMIT SET AND MAY
NOT BE APPLICABLE TO FUTURE PACKAGES.
6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE
WORK OF ALL SUBCONTRACTORS, TRADES AND SUPPLIERS. THE
GENERAL CONTRACTOR SHALL ENDEAVOR TO IDENTIFY AND NOTIFY
TO THE CONTRACTING OFFICER OF ANY CONFLICTS BETWEEN THE
WORK OF DIFFERENT PARTIES AT THE EARLIEST POSSIBLE DATE SO AS
TO ALLOW REASONABLE AND ADEQUATE TIME FOR THE CONFLICT TO
BE RESOLVED WITHOUT DELAYING THE WORK. ALL DEVIATIONS FROM
THAT WHICH IS REQUIRED BY THE CONTRACT DOCUMENTS MUST BE
APPROVED IN ADVANCE BY THE CONTRACTING OFFICER.
7. THE ARCHITECTURAL DRAWINGS ESTABLISH AND COORDINATE THE
FINISH APPEARANCE AND EXACT LOCATION OF ALL EXPOSED
ELEMENTS OF THE WORK, INCLUDING THAT WORK WHICH IS ILLUSTRATED
PRIMARILY ON DWGS. OF OTHER DISCIPLINES. LOCATIONS SHOWN ON
OTHER DWGS. ARE SCHEMATIC, U.N.O. ON THE ARCHITECTURAL DWGS.
THE ARCHITECTURAL DWGS. TAKE PRECEDENCE FOR THE FINISHED
APPEARANCE AND EXACT LOCATIONS OF ALL PARTS OF THE WORK.
EXCEPTION: DIMENSIONED LOCATIONS SHOWN ON DRAWINGS OF OTHER
DISCIPLINES SHALL GOVERN ONLY WHERE:
A. SPECIFICALLY AND INDIVIDUALLY INDICATED BY SYMBOL, KEYED
NOTE, OR NOTATION ON THE ARCHITECTURAL DWGS.
B. OCCURRING WITHIN A ROOM OR OTHER IDENTIFIED SPACE FOR
WHICH ARCH. SHEET OR SCHEDULE NOTES INDICATE THAT
DIMENSIONS PROVIDED ELSEWHERE SHALL GOVERN.
8. REFER TO THE STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING
DRAWINGS FOR THE DETAILED DESIGN OF THE STRUCTURAL,
MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS OF WHICH
PORTIONS ALSO MAY BE SHOWN ON THE ARCHITECTURAL DRAWINGS.
9. THE TERM 'REFERENCE' ELEVATION OR DIMENSIONS REFERS TO A
NOMINAL WORK POINT. THE ACTUAL ELEVATION MAY VARY FROM THE
REFERENCE POINT. REFER TO THE APPLICABLE DETAIL TO DETERMINE
THE RELATIONSHIP BETWEEN THE ACTUAL ELEVATION OR DIMENSION
AND THE STATED REFERENCE POINT.
10. 'FINISH FLOOR' ELEVATIONS ARE MEASURED AT THE TOP OF THE
CONCRETE FLOOR SLAB, UNLESS NOTED OTHERWISE.
11. WHERE THE CONCRETE FLOOR SLAB IS DEPRESSED TO
ACCOMMODATE MORTAR BEDS, SETTING BEDS, RAISED ACCESS
FLOORS, AND OTHER SIMILAR FLOOR ASSEMBLIES, FINISHED FLOOR
ELEVATIONS ARE MEASURED AS IF CONCRETE DEPRESSION DID NOT
OCCUR.
12. CEILING HEIGHT DIMENSIONS ARE MEASURED TO FINISHED SURFACES,
UNLESS NOTED OTHERWISE.
13. THE TERM 'REFERENCE ROOF ELEVATION' REFERS, UNLESS NOTED
OTHERWISE, TO THE ELEVATION OF THE TOP OF THE STRUCTURAL ROOF
ASSEMBLY AT THE PERIMETER OF THE AREA INDICATED.
14. WHERE THE STRUCTURAL ROOF ASSEMBLY IS SLOPED TO DRAIN, THE
ACTUAL TOP OF THE ASSEMBLY ELEVATION WILL VARY FROM THE
STATED 'REFERENCE ROOF ELEVATION'. SEE THE ARCH. ROOF PLANS
AND THE STRUCTURAL DWGS. TO DETERMINE WHERE THE STRUCTURE IS
SLOPED TO DRAIN.
15. INSULATION AND ROOFING MATERIALS RAISE THE ACTUAL FINISHED
SURFACE OF THE ROOF ABOVE THE STATED ' REFERENCE ROOF
ELEVATION'. THICKNESS OF INSULATION AND ROOFING MATERIALS
VARIES WITH THE TYPE OF ROOF SYSTEMS INDICATED. SEE THE
ARCHITECTURAL ROOF PLANS FOR SPECIFIC INFORMATION.
16. DIMENSIONS TO NEW CONSTRUCTION ARE TO FACE OF FRAMING, FACE
OF CMU OR FACE OF STRUCTURAL CONCRETE WALL, U.N.O.
17. PROVIDE FINISH END PANELS, FILLERS, SUPPORTS, ETC., REQUIRED
FOR A COMPLETE CABINETRY INSTALLATION.
18. VERIFY MOUNTING HEIGHTS OF ACCESSORIES, EQUIPMENT, DOOR
HARDWARE, CASEWORK, ETC., AND PROVIDE SOLID BLOCKING OR
METAL STRAPS BETWEEN FRAMING MEMBERS TO SUPPORT WEIGHT
AND USE OF ITEMS TO BE SUPPORTED. WHERE MOUNTING HEIGHTS ARE
NOT INDICATED, MOUNT ITEMS AT RECOGNIZED INDUSTRY STANDARD
MOUNTING HEIGHTS. COORDINATE LOCATIONS WITH MANUFACTURER OR
SUPPLIER. REFER ANY MOUNTING HEIGHT QUESTIONS TO ARCHITECT
FOR INTERPRETATION.
19. PROVIDE CONTINUOUS SEALANT BETWEEN DISSIMILAR MATERIALS SUCH
AS MASONRY AND CONCRETE, GYPSUM BOARD AND MASONRY,
COUNTERTOPS AND WALLS, ETC. - COLOR TO BE APPROVED BY
ARCHITECT / OWNER PRIOR TO INSTALLATION
20. LOCATE INSIDE (DOOR SIDE) FACE OF DOOR FRAME JAMBS 6 INCHES
FROM THE FINISH FACE OF ADJACENT WALLS IN STEEL STUD
ASSEMBLIES, U.N.O. - LOCATE R.O. OF DOOR FRAMES 4" FROM
ADJACENT WALLS IN WOOD STUD ASSEMBLIES EXCEPT AT PRIMARY
UNIT ENTRY DOORS WHICH SHOULD BE 6", U.N.O.
21. COORDINATE EQUIPMENT WORK WITH MANUFACTURERS AND SUPPLIERS
PROPER ROUGH-IN CLEARANCES FOR INSTALLATION, USE, AND
MAINTENANCE.
22. PROVIDE CONTROL JOINTS (C.J.) IN GYPSUM BOARD WALL
CONSTRUCTION AS INDICATED. WHERE NOT SHOWN, PROVIDE MAXIMUM
SPACING BETWEEN JOINTS OF 30'-0". VERIFY FINAL CONTROL JOINT
LOCATIONS WHETHER OR NOT INDICATED ON THE DRAWINGS WITH
ARCHITECT PRIOR TO STARTING WORK.
23. STUD SPACING SHALL BE 16 INCHES, U.N.O. - REFER TO STRUCTURAL
DRAWINGS.
24. DO NOT BEGIN ANY WORK THAT MAY REQUIRE COORDINATION SUCH
AS CEILING INSTALLATION PRIOR TO FINAL SUBMITTAL OF MECHANICAL
AND ELECTRICAL COORDINATION DRAWINGS TO ARCHITECT NOR PRIOR
TO RESOLUTION AND APPROVAL OF ALL COORDINATION ISSUES.
25. WHEN WALL TAGS ARE INDICATED AT ONE FACE OF FURRED COLUMN, IT
SHOULD BE CONSIDERED TO OCCUR ON ALL FACES OF THE COLUMN,
U.N.O.
26. WALL TYPES ARE ASSUMED TO BE CONTINUOUS WITHIN THE SAME PLANE
OR SURFACE UNTIL ANOTHER WALL TAG IS SHOWN.
27. PROVIDE CONTROL JOINTS (C.J.) IN MASONRY WALL CONSTRUCTION AS
INDICATED. WHERE NOT SHOWN, PROVIDE MAXIMUM SPACING BETWEEN
JOINTS OF 40'-0" AND MAXIMUM DISTANCE BETWEEN OUTSIDE CORNERS
AND JOINTS OF 10'-0". PROVIDE JOINTS BETWEEN ALL INTERIOR LOAD
BEARING AND NON-LOAD BEARING WALLS, AT ALL ABRUPT CHANGES IN
HEIGHTS, AT ALL CHANGES IN WALL THICKNESS, AND AT ALL PILASTER
LOCATIONS. VERIFY FINAL CONTROL JOINT LOCATIONS, WETHER OR
NOT INDICATED ON THE DWGS, WITH ARCHITECT PRIOR TO STARTING
WORK.
28. MECHANICAL CONTRACTOR IS RESPONSIBLE TO PROVIDE ACCEPTABLE
AND UNIFORM ENVIRONMENTAL CONDITIONS DURING CONSTRUCTION.
29. MECHANICAL CONTRACTOR IS RESPONSIBLE TO PROVIDE A COMPLETE
MECHANICAL SYSTEM IN FULL COMPLIANCE WITH ALL APPLICABLE
CODES.
30. ELECTRICAL CONTRACTOR IS RESPONSIBLE TO PROVIDE A COMPLETE
ELECTRICAL SYSTEM IN FULL COMPLIANCE WITH ALL APPLICABLE
CODES.
GENERAL NOTES
ARCHITECTURAL
1. PROVIDE WATER RESISTANT GWB IN ALL ROOMS CONTAINING
OPERABLE PLUMBING FIXTURES AND WITHIN FOUR FEET OF DRINKING
FOUNTAINS.
2. REFER TO SPECIFIC UNIT SHEETS FOR ANY "PREROCK" REQUIREMENTS
AROUND BATH TUBS AND SHOWERS. INSTALL 1/2" CEMENT BOARD OR
EQUAL BEHIND ALL TILE IN BATH TUBS AND SHOWERS
3. PROVIDE LATERAL BRACING FOR PARTITIONS WHICH EXTEND PAST
CEILING HEIGHT.
4. WALL TYPE CONSTRUCTION TYPICALLY STARTS AT CONCRETE FLOOR
ELEVATION OR WOOD FRAMED TOP OF SUBFLOOR.
5. REFER TO CODE DRAWINGS FOR ADDITIONAL INFORMATION.
GENERAL NOTES
WALL TYPES
1. THESE GENERAL NOTES APPLY TO REFLECTED CEILING PLAN
DRAWINGS.
2. REFER TO THE 'PROJECT GENERAL NOTES' FOR ALL GENERAL NOTES
APPLICABLE TO ALL DRAWINGS OF ALL DISCIPLINES.
3. CEILING HEIGHT DIMENSIONS ARE MEASURED TO FINISHED SURFACES,
U.N.O.
4. ALL CEILINGS TO HAVE 58" TYPE 'C' GYPSUM BOARD WHERE REQUIRED
FOR RATING AT INDICATED CEILING HEIGHT.
5. CENTER CEILING GRIDS WITHIN ROOM EACH DIRECTION, U.N.O.
6. LOCATE ACT CEILING GRIDS WITHIN ROOMS SUCH THAT THE BORDERS
CONTAIN NOT LESS THAN 12 TILE WIDTH, U.N.O.
7. CENTER PENETRATIONS IN ACOUSTICAL CEILING SYSTEMS WITHIN
INDIVIDUAL CEILING PANELS, SUCH AS SPRINKLER HEADS, DIFFUSERS,
LIGHT FIXTURES, ETC., U.N.O.
8. PAINT ALL EXPOSED GYPSUM BOARD U.N.O. REF. FINISH PLANS FOR
ADDITIONAL INFO.
9. PROVIDE CONTROL JOINTS (CJ) IN GYPSUM BOARD CEILING, MAX. CJ
SPACING SHALL BE 30'-0", VERIFY FINAL CJ LOCATIONS WITH
ARCHITECT PRIOR TO STARTING WORK.
10. CEILING ACCESS PANELS INDICATED ARE NOT INTENDED TO LIMIT THE
NUMBER OF PANELS REQUIRED. PANEL QUANTITY SHALL BE SUFFICIENT
TO PROVIDE ALL REQUIRED ACCESS WHETHER OR NOT INDICATED ON
THE DRAWINGS. VERIFY FINAL LOCATIONS WITH ARCHITECT PRIOR TO
STARTING WORK.
11. REFER TO FINISH PLANS FOR ADDITIONAL CEILING INFORMATION.
12. REFER TO ELECTRICAL DRAWINGS FOR CEILING MOUNTED LIGHT
FIXTURES TYPES AND QUANTITIES. USE ARCHITECTURAL REFLECTED
CEILING PLANS FOR THE PLACEMENT OF LIGHT FIXTURES
13. REFER TO FIRE PROTECTION DRAWINGS FOR SPRINKLER HEAD TYPES
AND QUANTITIES. HEADS HAVE BEEN INTENTIONALLY OMITTED FROM
REFLECTED CEILING PLANS FOR CLARITY.
14. PROVIDE SOUND ATTENUATION INSULATION ABOVE CEILING AS
INDICATED ON THE PLANS, SECTIONS, AND FLOOR/ROOF ASSEMBLIES.
15. COORDINATE LOCATION OF ALL ELEMENTS WITHIN HARD CEILING WITH
ARCHITECT PRIOR TO INSTALLATION.
16. EXPOSED PERIMETER EDGES OF ACT CEILING TO BE FINISHED WITH
SPECIFIED PERIMETER TRIM
GENERAL NOTES
REFLECTED CEILING PLAN
1. THESE GENERAL NOTES APPLY TO THE DOOR SCHEDULES.
2. DOOR AND FRAME NUMBERS CORRESPOND TO RESPECTIVE ROOM
NUMBERS. IN ROOMS WITH MULTIPLE OPENINGS, A SUFFIX HAS BEEN
ADDED TO DOOR NUMBERS.
3. VERTICAL FRAMING MEMBERS AT ALL DOOR FRAMES SHALL EXTEND
TO STRUCTURE ABOVE.
4. UNDERCUT DOORS AS REQUIRED BY FINAL FINISH OR AS REQUIRED BY
MECHANICAL ENGINEER
5. PROVIDE CONTINUOUS SEALANT BETWEEN HOLLOW METAL FRAME
PERIMETERS AND SURROUNDING WALL CONSTRUCTION.
6. PROVIDE CONTINUOUS SEALANT BETWEEN INTERIOR AND EXTERIOR
WINDOW, CURTAINWALL, AND STOREFRONT FRAME PERIMETERS AND
SURROUNDING CONSTRUCTION, U.N.O.
7. GROUT FULL HOLLOW METAL FRAMES IN MASONRY CONSTRUCTION.
8. SPOT GROUT HOLLOW METAL FRAMES IN GYPSUM WALL.
9. WHERE A FIRE RATING IS INDICATED ON THE DOOR SCHEDULE,
HARDWARE AND DOOR ASSEMBLY COMPONENTS SHALL MEET THE
REQUIREMENTS OF THAT LABEL.
10. INSTALL DOOR GLASS USING WET-GLAZING METHOD.
11. ALL STEEL LINTELS ABOVE EXTERIOR OPENINGS SHALL BE
GALVANIZED.
GENERAL NOTES - WINDOW & DOORS ARCHITECTCLIENT CONSTRUCTION MANAGER PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20011
APRIL 28, 2021AVANT PHASE IICARMEL, INEDWARD ROSEDEVELOPMENTCARMEL LLC.PERMIT SET
No. AR12000062
STATE OF
MDXELA
ARS
H
T E C TCHI
AR
STGI
R E E
DER
IANDI N AGENERAL NOTES1. CONTRACTOR TO PROVIDE REQUIRED BLOCKING FOR CABINETS AND
BATH ACCESSORIES
2. ALL BEDROOM CLOSETS TO HAVE DOUBLE SHELF AND ROD
CONFIGURATION.
3. ALL COAT CLOSETS TO HAVE SINGLE SHELF AND ROD CONFIGURATION.
4. SEE MECHANICAL DRAWINGS FOR DRYER VENT INSTALLATION
LOCATION
5. SEE MECHANICAL DRAWINGS FOR IN-WALL WATER CONNECTIONS
6. CONTRACTOR TO VERIFY SIZE AND FRAMING DIMENSIONS OF HVAC
UNIT, BATHTUB, DOORS AND WINDOWS.
7. PROVIDE 1x2 PTD WOOD TRIM @ INTERIOR OF ALL CLOSETS / UTILITY
CLOSETS WHERE STANDARD DOOR CASING WILL NOT FIT.
8. UNDERCUT ALL INTERIOR DOORS FOR RETURN AIR 1", VERIFY WITH
MECHANICAL DRAWINGS.
9. ALL DRYWALL WET AREAS TO BE "GREEN" BOARD.
10. BASE OF MIRROR INSTALLED 40" AFF MAXIMUM.
11. PROVIDE DOOR VIEWER AT UNIT ENTRY DOORS
12. ALL CEILINGS ARE AT BOTTOM OF STRUCTURE (B.O.S.) IN UNITS U.N.O.
13. ALL FLOORING TRANSITIONS ARE TO BE CENTERED UNDER THE DOOR
14. REFER TO OVERALL PLANS FOR DEMISING / CORRIDOR WALL
REQUIREMENTS. ALL WALLS / WALL SECTIONS BEHIND PLUMBING
FIXTURES TO BE 2X6 MINIMUM. - FINISH WALLS TO ALIGN.
15. INTERIOR ELEVATIONS ARE FOR SCHEMATIC CABINET LAYOUT ONLY.
CONTRACTOR TO VERIFY ALL DIMENSIONS, PROVIDE FILLERS AS
REQUIRED. REFER TO CABINET SHOP DRAWINGS AND OWNER
SPECIFICATIONS.
16. FIELD VERIFY ALL CLOSET ELEVATIONS PRIOR TO FABRICATION &
INSTALL.