HomeMy WebLinkAboutCover Letter.pdfThe Foundation for a Wireless World
CrownCastle.com
370 Mallory Station Rd,
Franklin, TN 37067
Phone: (615) 771- 1548
www.crowncastle.com
Project Data Sheet
Business Unit (BU) 873711
Application/Order Number 601166
Crown Castle Site Name Carmel-Springmill
Customer Site Number MW07212A
Site Address 1531 W Main St
Site City, State, Zip Carmel, IN 46032
Parcel Tax ID 1709270000027004
Applicant / Agent T-Mobile Central LLC by Crown Castle USA Inc.
Agent Address 370 Mallory Station Rd,
Agent phone number (615) 771-1548
Carrier T-Mobile
Scope of work
Add or replace antennas, ancillary equipment and ground equipment as per plans
for an existing carrier on an existing wireless communication facility.
Property Owner PSI Energy Inc
Property Owner Address 550 SOUTH TRYON STREET, CHARLOTTE, NC 28202
Structure Type MONOPOLE
Structure Height 150 FT
Antenna Equipment Height 110
Size of Compound Sq. Ft. 2,123 sq ft
Latitude 39° 58’ 37.2”
Longitude -86° 10’ 10.5”
Zoning Jurisdiction IN - CITY OF CARMEL
Zoning Jurisdiction Address 1 CIVIC SQUARE, CARMEL, IN 46032
Permitting Jurisdiction IN - CITY OF CARMEL
Permitting Jurisdiction Address 1 CIVIC SQUARE, CARMEL, IN 46032
The Foundation for a Wireless World
CrownCastle.com
370 Mallory Station Rd,
Franklin, TN 37067
Phone: (615) 771- 1548
www.crowncastle.com
March 30, 2022
IN - CITY OF CARMEL
Dept of Community Services, Div of Bldg & Code Ser
Jim Blanchard, Building Commissioner
1 CIVIC SQUARE
CARMEL, IN 46032
Via Electronic
**********NOTICE OF ELIGIBLE FACILITIES REQUEST**********
RE: Request for Minor Modification to Existing Wireless Facility – Section 6409
Site Address: 1531 W Main St, Carmel, IN 46032
Crown Site Number: 873711 / Crown Site Name: Carmel-Springmill
Customer Site Number: MW07212A / Application Number: 601166
Dear Jim Blanchard, Building Commissioner:
On behalf of T-Mobile Central LLC (”T-Mobile” or “Applicant”), Crown Castle USA Inc. (“Crown Castle”) is pleased to
submit this request to modify the existing wireless facility noted above through the collocation, replacement and/or
removal of the Applicant’s equipment as an eligible facilities request for a minor modification under Section 64091 and the
rules of the Federal Communications Commission (“FCC”).2
Section 6409 mandates that state and local governments must approve any eligible facilities request for the modification
of an existing wireless tower or base station that does not substantially change the physical dimensions of such tower or
base station. Under Section 6409, to toll the review period, if the reviewing authority determines that the application is
incomplete, it must provide written notice to the applicant within 30 days, which clearly and specifically delineates all
missing documents or information reasonably related to whether the request meets the federal requirements.3
Additionally, if a state or local government, fails to issue any approvals required for this request within 60 days, these
approvals are deemed granted. The FCC has clarified that the 30-day and 60-day deadlines begins when an applicant: (1)
takes the first step required under state or local law; and (2) submits information sufficient to inform the jurisdiction that
this modification qualifies under the federal law4. Indiana IC 8-1-32.3 incorporates Section 6409, defining an EFR as an
application for collocation, and further states that such EFR/collocation application is not required to comply with zoning
or land use requirements and deemed granted with written notification in forty five (45) days after a complete application
is received by the local jurisdiction, excluding tolling. Based on the submittal date of March 30, 2022, the 45th day
timeframe will expire on May 14, 2022.
1 Middle Class Tax Relief and Job Creation Act of 2012, Pub. L. No. 112-96, § 6409 (2012) (codified at 47 U.S.C. § 1455).
2 Acceleration of Broadband Deployment by Improving Wireless Facility Siting Policies, 29 FCC Rcd. 12865 (2014) (codified at 47
CFR § 1.6100); and Implementation of State & Local Governments’ Obligation to Approve Certain Wireless Facility Modification
Requests Under Section 6409(a) of the Spectrum Act of 2012, WT Docket No. 19-250 (June 10, 2020).
3 See 47 CFR § 1.6100 (c)(3). 4 See 2020 Upgrade Order at paragraph 16.
The Foundation for a Wireless World
CrownCastle.com
370 Mallory Station Rd,
Franklin, TN 37067
Phone: (615) 771- 1548
www.crowncastle.com
IN - CITY OF CARMEL requires the electronic submission of applications for 873711 Carmel-Springmill. Please allow this
letter to confirm that, on March 30, 2022, Applicant submitted its electronic application through the appropriate forum.
This letter supplements the electronic filing for purposes of starting the review period. Accordingly, the deadline for
written notice of incomplete application is April 29, 2022, and the deadline for issuance of approval is May 29, 2022.
The proposed scope of work for this project includes:
Add or replace antennas, ancillary equipment and ground equipment as per plans for an existing carrier on an existing
wireless communication facility.
At the end of this letter is a checklist of the applicable substantial change criteria under Section 6409. Additionally, please
find enclosed the following information in support of this request:
(1) 873711 Carmel-Springmill;
(2) Construction Drawings;
(3) Structural Analysis; and
(4) Section 6409 Substantial Change Checklist.
As these documents indicate, (i) the modification involves the collocation, removal or replacement of transmission
equipment; and (ii) such modification will not substantially change the physical dimensions of such tower or base station.
As such, it is an “eligible facilities request” as defined in the FCC’s rules to which the 60-day deadline for approval applies.
Accordingly, Applicant requests all authorization necessary for this proposed minor modification under Section 6409.
Our goal is to work with you to obtain approvals earlier than the deadline. We will respond promptly to any request for
related information you may have in connection with this request. Please let us know how we can work with you to
expedite the approval process. We look forward to working with you on this important project, which will improve wireless
telecommunication services in your community using collocation on existing infrastructure. If you have any questions,
please do not hesitate to contact me.
Regards,
Jeannie Koehl
Jeannie Koehl
Site Acquisition Specialist
Crown Castle
Agent for Applicant
(615) 771-1548
Jeannie.Koehl@crowncastle.com
The Foundation for a Wireless World
CrownCastle.com
370 Mallory Station Rd,
Franklin, TN 37067
Phone: (615) 771- 1548
www.crowncastle.com
Section 6409 Substantial Change Checklist
Towers Outside of the Public Right of Way
The Federal Communications Commission has determined that a modification substantially changes the physical dimension of a wireless tower or
base station under 47 U.S.C. § 1455(a) if it meets one of six enumerated criteria under 47 C.F.R. § 1.6100.
Criteria for Towers Outside the Public Rights of Way
YES/NO
NO
Does the modification increase the height of the tower by more than the greater of:
(a) 10%
(b) or, the height of an additional antenna array plus separation of up to 20 feet from the top of
the nearest existing antenna?
YES/NO
NO
Does the modification add an appurtenance to the body of the tower that would protrude from the
edge of the tower more than 20 feet or more than the width of the tower structure at the level of the
appurtenance, whichever is greater?
YES/NO
NO
Does the modification involve the installation of more than the standard number of new equipment
cabinets for the technology involved or add more than four new equipment cabinets?
YES/NO
NO
Does the modification entail an increase in square footage by more than two thousand five hundred
(2,500) square feet?
YES/NO
NO
Does the modification defeat the concealment elements of the eligible support structure?
YES/NO
NO
Does the modification violate conditions associated with the siting approval with the prior approval the
tower or base station other than as specified in 47 C.F.R. § 1.6100(c)(7)(i) – (iv)?
If all questions in the above section are answered “NO,” then the modification does not constitute a substantial change to the existing
tower under 47 C.F.R. § 1.6100.