HomeMy WebLinkAbout06010113-State Release
Would you like to reduce your turnaround time?
ELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA AT
efile24-7@dhs.state.Jn.us, Or VISIT OUR WEB SITE AT www,in.gov/dhs/osbc
Project number
Release date
Indiana Department of Homeland Security
DIVISION OF FIRE SAFETY f PLAN REVIEW
402 W. Washington St., Room E245
Indianapolis, IN 46204
INDIANA 02
~OOOO
314510
Construction type
II-B, SPK
Scope of release
ARCH ELEC MECH
PLUM
Type of release
Standard
Project name
AHN Hematology Oncology
11/16/05
CONSTRUCTION DESIGN RELEASE
State Form 41191 (R9/5-98)
Report Printed on: November 16, 2005
To: Owner I Architect I Engineer
Simmons Architects LLC
Frederick A Simmons AlA 3135
305 E New York St
INDIANAPOLIS IN 46204
SUPPORT HOOSIER SAFETY
Street address
1172SllIinois St
Lower level
fax & e-mail: 3176563501, ccartwright@simmonsarchitects,net
The plans, specifications and application submitted for the above referenced project have been reviewed for compliance with the applicable rules of
the Fire Prevention and Building Safety' Commission. The project is released for constrlJction subject to, but not necessarily limited to, the conditions
listed -below::THIS ,IS 'NOT-ABU Il::DING PERMIT:"AU"required local- pennits'and'licenses' must 'be'obtained prior to 'beginning' construction worle All
construction work must be in full compliance with all applicable State rules. Any changes in the released plans andlor specifications:must be filed with
and released by this Office before any wol"l5ls'a_lter~d.;This"fele,ase may bel'juspend€ld(or revoked if it is determined"to bE!js~~ed in: error, in violation
of any rules of the Commission or if it is basei:l,:on incorrect ()r il1suffiC'ie'nt irifol1'11ation.;This release shall expire by Iimitation,,~nd become null and
void, if the work authorized is not commenged_ within one (1):yecir from, the above,dat'e; - - ,
CONDITIONS: .
City
CARMEL
County
HAMILTON
Note :(A 1A & A1 B): In accordancewith.the affidavit sworn under penalties of perjury in the application for construction design release the plans
and specifications tiled in conjunctiohwith this project shall complY with all of the applicable rules and laws of Fire Prevention and Building Safety
Commission. Providing false information constitutes an act of per}ury, which-is a Class 0 felony punishable by a prison term and a fine up to $10,000.
In accordance with Section 19 of the General Administrative Rules (675 lAC 12*6.19) a complete set of plans and specifications that conform
exactly to the design that was released by the office of the state building commissioner shall be maintained on the construction jobsite as well as a
copy of the design release.
No addition or alteration shall cause an existing building, structure, Or any part of the !permanent
heating, ventilating, air conditioning, electrical, plumbing, sanitary, emergency detection, 'emergency
communication, or fire or expiosion suppression systems to become unsafe or overloaded under
ttie provisions of the rules of the Commission for new construction in accordance with 675 lAC 12-4-
12(c).
4G0412AF No addition, aiteration, or repair shall reduce existing exit capacities to less than that required under
the provisions of the rules of the Indiana Fire and Building Safety Commission for new construction
in accordanE" with 675.Ii'\C 12:.t:12(d), .
4G0603AF Plans and specifications for the revised fire suppression system shall be filed with the required
application, fees, and complete details in accordance with 675 lAC 12-6- 3(a), 7(h)17 and 675 lAC
13-1-8. (N,F.PA #13)
Please be advised that if an administrative review of this action is desired, a written petJtion for review must be tiled at the above address with the
Fire Prevention and Building Safety Commission identifying the matter for which a review is sought no later than eighteen (18) days from the above.
stated date, unless the eighteenth day falls on a Saturday, a Sunday, a legal holiday under State statute, or a day in which the Department of Fire
and Building Services is closed during normal business hours. In the latter case, the tiling deadline will be the first working day thereafter. If you
choose to petition, and the before-mentioned procedures are followed, your petition for review will be granted, and an administrative proceeding will
be conducted by an administrative law judge of the Fire Prevention and Building Safety Commission. If a petition for review is not filed, this Order will
be final, and you must comply with its requirements.
4G0412AC
Page 1/2