No preview available
HomeMy WebLinkAboutTaliaferro Permit Pack Flat.pdf1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. CUSTOMER INFORMATION: Al Taliaferro 1120 Keeneland Ct Carmel, Indiana 46280 DC SYSTEM SIZE: 10.4 kW DC DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: REVISION: PAGE NUMBER: Enphase Energy February 26, 2022 473955 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 COVER SHEET PV1 GENERAL NOTES CODE AND STANDARDS SITE NOTES / OSHA REGULATION SOLAR CONTRACTOR EQUIPMENT LOCATIONS AERIAL VIEW DESIGN CRITERIA WIND SPEED: 115 MPH GROUND SNOW LOAD: 20 lb/ft² WIND EXPOSURE FACTOR: C SEISMIC DESIGN CATEGORY: C SITE SPECIFICATIONS CONSTRUCTION - V-B ZONING: RESIDENTIAL SHEET INDEX PV1 - COVER SHEET PV2 - SITE PLAN PV3 - ROOF PLAN PV4 - STRUCTURAL DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC M AC CB MSP 0" 1403 N. Research Way Orem, UT 84097 800.377.4480 DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC DC AC M AC CB MSP 0" 1403 N. Research Way Orem, UT 84097 800.377.4480 D ATTACHMENT SPACING- SIDE VIEW SCALE: 1/2" = 1'-0" B A LANDSCAPE PORTRAIT A B MODULE WIDTH MODULE WIDTH PV MODULE ROOF STRUCTURE 30° PV MODULE UNIRAC SFM 2" MICRORAIL UNIRAC SFM 6.5" SPLICE PV MODULE UNIRAC SFM 2" MICRORAIL 23" MAX. 72" MAX. 23" MAX. 48" MAX. C ATTACHMENT SPACING- FRONT VIEW SCALE: 3/4" = 1'-0" LANDSCAPE PORTRAIT -RACKING ATTACHMENTS TO BE STAGGERED BY SHIFTING EACH SUBSEQUENT ROW OF ATTACHMENTS OVER ONE RAFTER. UNIRAC SFM 6.5" SPLICE B BOTTOM STANDOFF DETAIL SCALE: 3" = 1'-0" A MIDDLE/TOP STANDOFF DETAIL SCALE: 3" = 1'-0" UNIRAC SFM INFINITY REC SOLAR REC400AA PURE PV MODULE UNIRAC SFM MICRORAIL/ SPLICE (E) ROOF SHEATHING FLASHING UNIRAC SFM SLIDER (1) 5/16" STAINLESS STEEL LAG BOLT WITH 2-1/2" MIN. EMBEDMENT AND FLAT WASHER (E) BUILDING STRUCTURE 21 2" MIN. EMBED. REC SOLAR REC400AA PURE PV MODULE (E) ROOF SHEATHING FLASHING UNIRAC SFM SLIDER AND TRIMRAIL ROOF ATTACHMENT (1) 5/16" STAINLESS STEEL LAG BOLT WITH 2-1/2" MIN. EMBEDMENT AND FLAT WASHER (E) BUILDING STRUCTURE 21 2" MIN. EMBED. UTILITY COMPANY: Duke Energy IN PERMIT ISSUER: City of Carmel 120/240 VAC 60HZ 1 PHASE TO UTILITY GRID L2 L1 N (E) ELECTRICAL NOTES: 26 INVERTERS x 290 W AC = 7.54 kW AC PANEL WATTAGE = 400 W DC DESIGNER NOTES: SUPPLY SIDE TAP. INTERIOR POI. (1) CIRCUIT OF 13 MODULES (1) CIRCUIT OF 13 MODULES L1 JB-1 L2 EGC L1 L2 (N) 20A / 2P L1 L2 EGC 2 1 JB L1 JB-1 L2 EGC L1 L2 (N) 20A / 2P L1 L2 EGC 2 1 EGC N G (26) REC Solar REC400AA Pure UL 1703 COMPLIANT (26) Enphase Energy IQ7PLUS-72-2-US UL 1741 COMPLIANT 3 JB-1 EZ SOLAR JUNCTION BOX 4"x4"x4" PVC JUNCTION BOX ENPHASE IQ COMBINER 3 (SOLAR LOAD ONLY) (E) GROUNDING ELECTRODE(S) (E) 200A / 2P (E) 200A MAIN SERVICE PANEL (E) 200A / 2P MAIN BREAKER L2 GROUNDING NOTES 1. A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH [NEC 690.47] AND [NEC 250.50-60] SHALL BE PROVIDED. PER [NEC 690.47], THE GROUNDING ELECTRODE SYSTEM OF AN EXISTING BUILDING MAY BE USED AND BE BONDED AT THE SERVICE ENTRANCE. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, OR IS ONLY METALLIC WATER PIPING, A SUPPLEMENTAL GROUNDING ELECTRODE WILL BE USED AT THE INVERTER LOCATION CONSISTING OF A UL LISTED 8 FT GROUND ROD WITH ACORN CLAMP. 2. THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE BETWEEN THE GROUNDING ELECTRODE AND THE PANEL (OR INVERTER) IF SMALLER THAN #6 AWG COPPER WIRE PER [NEC 250.64(B)]. THE GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS, EXCEPT FOR SPLICES OR JOINTS AT BUSBARS WITHIN LISTED EQUIPMENT PER [NEC 250.64(C)]. 3. GROUNDING ELECTRODE CONDUCTORS SHALL BE NO LESS THAN 8 AWG AND NO GREATER THAN 6 AWG COPPER AND BONDED TO THE EXISTING GROUNDING ELECTRODE TO PROVIDE FOR A COMPLETE SYSTEM. 4. PV SYSTEM SHALL BE GROUNDED IN ACCORDANCE TO [NEC 250.21], [NEC TABLE 250.122], AND ALL METAL PARTS OR MODULE FRAMES ACCORDING TO [NEC 690.46]. 5. MODULE SOURCE CIRCUITS SHALL BE GROUNDED IN ACCORDANCE TO [NEC 690.42]. 6. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDED CONDUCTOR TO ANOTHER MODULE. 7. EACH MODULE WILL BE GROUNDED USING THE SUPPLIED CONNECTION POINTS IDENTIFIED IN THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 8. ENCLOSURES SHALL BE PROPERLY PREPARED WITH REMOVAL OF PAINT/FINISH AS APPROPRIATE WHEN GROUNDING EQUIPMENT WITH TERMINATION GROUNDING LUGS. 9. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR DIRECT BURIAL. 10. GROUNDING AND BONDING CONDUCTORS SHALL BE COPPER, SOLID OR STRANDED, AND BARE WHEN EXPOSED. 11. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO [NEC 690.45] AND BE A MINIMUM OF 10 AWG WHEN NOT EXPOSED TO DAMAGE (6 AWG SHALL BE USED WHEN EXPOSED TO DAMAGE). 12. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLOR CODED GREEN (OR MARKED GREEN IF 4 AWG OR LARGER). 13. ALL CONDUIT BETWEEN THE UTILITY AC DISCONNECT AND THE POINT OF CONNECTION SHALL HAVE GROUNDED BUSHINGS AT BOTH ENDS. 14. SYSTEM GEC SIZED ACCORDING TO [NEC 690.47], [NEC TABLE 250.66], DC SYSTEM GEC SIZED ACCORDING TO [NEC 250.166], MINIMUM 8 AWG WHEN INSULATED, 6 AWG WHEN EXPOSED TO DAMAGE. 15. EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES, EQUIPMENTS, AND CONDUCTOR ENCLOSURES SHALL BE GROUNDED IN ACCORDANCE WITH [NEC 250.134] OR [NEC 250.136(A)] REGARDLESS OF VOLTAGE. WIRING & CONDUIT NOTES 1. ALL CONDUIT SIZES AND TYPES, SHALL BE LISTED FOR ITS PURPOSE AND APPROVED FOR THE SITE APPLICATIONS. 2. BOLTED CONNECTION REQUIRED IN DC DISCONNECTS ON THE WHITE GROUNDED CONDUCTOR (USE POLARIS BLOCK OR NEUTRAL BAR). 3. ANY CONNECTION ABOVE LIVE PARTS MUST BE WATERTIGHT. REDUCING WASHERS DISALLOWED ABOVE LIVE PARTS, MEYERS HUBS RECOMMENDED 4. UV RESISTANT CABLE TIES (NOT ZIP TIES) USED FOR PERMANENT WIRE MANAGEMENT OFF THE ROOF SURFACE IN ACCORDANCE WITH [NEC 110.2,110.3(A-B)]. 5. SOLADECK JUNCTION BOXES MOUNTED FLUSH WITH ROOF SURFACE TO BE USED FOR WIRE MANAGEMENT AND AS FLASHED ROOF PENETRATIONS FOR INTERIOR CONDUIT RUNS. 6. ALL PV CABLES AND HOMERUN WIRES BE TYPE USE-2, AND SINGLE-CONDUCTOR CABLE LISTED AND IDENTIFIED AS PV WIRE, TYPE TC-ER, OR EQUIVALENT; ROUTED TO SOURCE CIRCUIT COMBINER BOXES AS REQUIRED. 7. ALL CONDUCTORS AND OCPD SIZES AND TYPES SPECIFIED ACCORDING TO [NEC 690.8] FOR MULTIPLE CONDUCTORS. 8. ALL PV DC CONDUCTORS IN CONDUIT EXPOSED TO SUNLIGHT SHALL BE INSTALLED AT LEAST 7/8" ABOVE THE ROOF SURFACE AND DERATED ACCORDING TO [NEC TABLE 310.15 (B)(2)(A)], [NEC TABLE 310.15(B)(3)(A)],& [NEC 310.15(B)(3)(C)]. 9. EXPOSED ROOF PV DC CONDUCTORS SHALL BE USE-2, 90°C RATED, WET AND UV RESISTANT, AND UL LISTED RATED FOR 600V, UV RATED SPIRAL WRAP SHALL BE USED TO PROTECT WIRE FROM SHARP EDGES. 10. PHASE AND NEUTRAL CONDUCTORS SHALL BE DUAL RATED THHN/THWN-2 INSULATED, 90°C RATED, 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. CUSTOMER INFORMATION: Al Taliaferro 1120 Keeneland Ct Carmel, Indiana 46280 DC SYSTEM SIZE: 10.4 kW DC DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: REVISION: PAGE NUMBER: Enphase Energy February 26, 2022 473955 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 LABELS PV7 LABEL 1 FOR PV SYSTEM DISCONNECTING MEANS WHERE THE LINE AND LOAD TERMINALS MAY BE ENERGIZED IN THE OPEN POSITION. [NEC 690.13(B)] ELECTRIC SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION ! WARNING LABEL 2 SHALL BE MARKED AT AN ACCESSIBLE LOCATION AT THE DISCONNECTING MEANS AS A POWER SOURCE AND WITH THE RATED AC OUTPUT CURRENT AND THE NOMINAL OPERATING AC VOLTAGE. [NEC 690.54] PHOTOVOLTAIC SYSTEM !AC DISCONNECT ! 31.46 A 240 V RATED AC OUTPUT CURRENT 6+((71$0( 3$*(180%(5 5(9,6,21 &21),'(17,$/7+(,1)250$7,21 +(5(,1&217$,1('6+$//127%( 86(')257+(%(1(),72) $1<21((;&(37%/8(5$9(1 62/$51256+$//,7%( ',6&/26(',1:+2/(25,13$57 7227+(562876,'(5(&,3,(176 25*$1,=$7,21(;&(37,1 &211(&7,21:,7+7+(6$/($1' 86(2)7+(5(63(&7,9( (48,30(17:,7+2877+( :5,77(13(50,66,212)%/8( 5$9(162/$5//& 66 63(&6+((7  &2175$&725 %56),(/'236  39,167$//$7,21 352)(66,21$/ 6FRWW*XUQH\ 39 1$%&(3 &(57,),(' 15(6($5&+:$<%8,/',1*- 25(087  :::%/8(5$9(162/$5&20 The high-powered smart grid-ready Enphase IQ 7 Micro™ and Enphase IQ 7+ Micro™ dramatically simplify the installation process while EGLMIZMRKXLILMKLIWXW]WXIQIJƤGMIRG] Part of the Enphase IQ System, the IQ 7 and IQ 7+ Microinverters integrate with the Enphase IQ Envoy™, Enphase IQ Battery™, and the Enphase )RPMKLXIRƎQSRMXSVMRKERHEREP]WMWWSJX[EVI IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power-on testing, enabling Enphase to provide an industry-leading [EVVERX]SJYTXS]IEVW Enphase IQ 7 and IQ 7+ Microinverters To learn more about Enphase offerings, visit enphase.com Data Sheet Enphase Microinverters Region: AMERICAS Easy to Install • Lightweight and simple • Faster installation with improved, lighter two-wire cabling • Built-in rapid shutdown compliant (NEC 2014 & 2017) Productive and Reliable • Optimized for high powered 60-cell/120 half-cell and 72- cell/144 half-cell* modules • More than a million hours of testing • Class II double-insulated enclosure 6+((71$0( 3$*(180%(5 5(9,6,21 &21),'(17,$/7+(,1)250$7,21 +(5(,1&217$,1('6+$//127%( 86(')257+(%(1(),72) $1<21((;&(37%/8(5$9(1 62/$51256+$//,7%( ',6&/26(',1:+2/(25,13$57 7227+(562876,'(5(&,3,(176 25*$1,=$7,21(;&(37,1 &211(&7,21:,7+7+(6$/($1' 86(2)7+(5(63(&7,9( (48,30(17:,7+2877+( :5,77(13(50,66,212)%/8( 5$9(162/$5//& 66 63(&6+((7  &2175$&725 %56),(/'236  39,167$//$7,21 352)(66,21$/ 6FRWW*XUQH\ 39 1$%&(3 &(57,),(' 15(6($5&+:$<%8,/',1*- 25(087  :::%/8(5$9(162/$5&20 The Enphase IQ Combiner 3™ with Enphase IQ Envoy™ consolidates interconnection equipment into a single enclosure and streamlines PV and storage installations by providing a consistent, pre-wired solution for residential applications. It offers up to four 2-pole input circuits and Eaton BR series busbar assembly. Enphase IQ Combiner 3 (X-IQ-AM1-240-3) To learn more about Enphase offerings, visit enphase.com Data Sheet Enphase Networking Smart • Includes IQ Envoy for communication and control • Flexible networking supports Wi-Fi, Ethernet, or cellular • Optional AC receptacle available for PLC bridge • Provides production metering and optional consumption monitoring Simple • Reduced size from previous combiner • Centered mounting brackets support single stud mounting • Supports back and side conduit entry • Up to four 2-pole branch circuits for 240 VAC 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SHEET NAME: REVISION: PAGE NUMBER: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS rec Alphơ® pure Series ơexperience performance 410 wp 222 w M2 Product Specifications ELIGIBLE LEAD-FREE rohs cOMPLIANT COMPACT PANEL Size Ref: PM-DS-12-06-Rev- E 11.21 GR GR GR GR GR 1821±2.5 [71.7±0.1] 901 [35.5] 460 [18.1] 975±2.5 [38.4±0.1] 1100 [43.3] 1200 [47.2] 30 [1.2] 22.5 [0.9] 671 ±3 [26.4 ±0.12] 11±0.2 [0.43±0.01] 6.6±0.2 [0.26±0.01] 20.5±0.5 [0.8±0.02] 6.0±0.2 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SHEET NAME: REVISION: PAGE NUMBER: 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEETS SS 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SHEET NAME: REVISION: PAGE NUMBER: 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEETS SS 15-20 in-lbs UL Standard 1741, Nema Type 3R UL Standard 1741, Nema Type 3R 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SHEET NAME: REVISION: PAGE NUMBER: 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEETS SS SFMSUN FRAME MICRORAIL™ PAGE SYSTEM BONDING & GROUNDING S E-W BONDING PATH: (:PRGXOHWRPRGXOHERQGLQJLVDFFRPSOLVKHG ZLWKSUHLQVWDOOHGERQGLQJSLQVZKLFKHQJDJH RQWKHVHFXUHVLGHRIWKH0LFURUDLO70DQGVSOLFH TRIMRAIL BONDING PATH: 7ULPUDLOWRPRGXOHERQGLQJLVDFFRPSOLVKHGZLWK ERQGLQJFODPSZLWKLQWHJUDOERQGLQJSLQDQG ERQGLQJ7EROW(refer also to alternate method ) N-S BONDING PATH: 16PRGXOHWRPRGXOHERQGLQJLV DFFRPSOLVKHGZLWKERQGLQJFODPSZLWKLQWHJUDO ERQGLQJSLQV(refer also to alternate method ) System bonding is accomplished through modules. System grounding accomplished by attaching DJURXQGOXJWRDQ\PRGXOHDWDORFDWLRQRQWKHPRGXOHVSHFLʳHGE\WKHPRGXOHPDQXIDFWXUHU LUG DETAIL & TORQUE INFO Ilsco Lay-In Lug (GBL-4DBT) • PRXQWLQJKDUGZDUH • 7RUTXH IWOE • $:*6ROLGRU6WUDQGHG LUG DETAIL & TORQUE INFO Ilsco Flange Lug(SGB-4) • ȧPRXQWLQJKDUGZDUH • 7RUTXH LQOE • $:*6ROLGRU6WUDQGHG LUG DETAIL & TORQUE INFO Wiley WEEBLug (6.7) • ȧPRXQWLQJKDUGZDUH • 7RUTXH IWOE • $:*6ROLGRU6WUDQGHG NOTE: ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION TERMINAL TORQUE, Install Conductor and torque to the following: 4-6 AWG: 35in-lbs 8 AWG: 25 in-lbs 10-14 AWG: 20 in-lbs TERMINAL TORQUE, Install Conductor and torque to the following: 6-14 AWG: 7ft-lbs TERMINAL TORQUE, Install Conductor and torque to the following: 4-14 AWG: 35in-lbs WEEBLUG Single Use Only Star Washer is Single Use Only Ñ $OWHUQDWHPHWKRG $OWHUQDWHPHWKRG INSTALLATION GUIDE 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM HEREIN CONTAINED SHALL NOT BE SFMSUN FRAME MICRORAIL™ PAGE UL CODE COMPLIANCE NOTES T SYSTEM LEVEL FIRE CLASSIFICATION 7KHV\VWHPʳUHFODVVUDWLQJUHTXLUHVLQVWDOODWLRQLQWKHPDQQHUVSHFLʳHGLQWKH 681)5$0(0,&525$,/ 6)0 SFMSUN FRAME MICRORAIL™ PAGE TESTED / CERTIFIED MODULE LIST V Aleo P-Series $VWURQHUJ\ &+603&+603+9&+600 &+600+9&+600 %/ %) SFMSUN FRAME MICRORAIL™ PAGE TESTED / CERTIFIED MODULE LIST W Panasonic 9%+1[[[6$ 6$ 9%+1[[[6$ 6$ 9%+1[[[6$ (* AUTHORIZATION TO MARK Applicant: Manufacturer: Address: Address: Country: Country: 2 Standard(s): Product: Brand Name: Models: Unirac, Inc 1411 Broadway Blvd NE Albuquerque, NM 87102 USA Party Authorized To Apply Mark: Same as Manufacturer Report Issuing Office: Intertek Testing Services NA, Inc., Lake Forest, CA Control Number: 5003705 Authorized by: for L. Matthew Snyder, Certification Manager This document supersedes all previous Authorizations to Mark for the noted Report Number. This Authorization to Mark is for the exclusive use of Intertek's Client and is provided pursuant to the Certification agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Authorization to Mark. Only the Client is authorized to permit copying or distribution of this Authorization to Mark and then only in its entirety. Use of Intertek’s Certification mark is restricted to the conditions laid out in the agreement and in this Authorization to Mark. Any further use of the Intertek name for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification mark in accordance with the agreement, they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road, Arlington Heights, IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat- Plate Photovoltaic Modules and Panels [UL 2703:2015 Ed.1+R:29May2019] PV Module and Panel Racking Mounting System and Accessories [CSA TIL No. A-40:2020] Photovoltaic Mounting System, Sun Frame Microrail Installation Guide, PUB2021NOV29 Unirac SFM Unirac This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be applied only at the location of the Party Authorized To Apply Mark. nc., Lake Forest, CA for L Matthew Snyder Certification ATM for Report 102393982LAX-002 Page 1 of 4 ATM Issued: 7-Jan-2022 ED 16.3.15 (16-Oct-2021) Mandatory AUTHORIZATION TO MARK Applicant: Manufacturer: Address: Address: Country: Country: 223524 3 Standard(s): Product: Brand Name: Models: Unirac, Inc 1411 Broadway Blvd NE Albuquerque, NM 87102 USA Party Authorized To Apply Mark: Same as Manufacturer AUTHORIZATION TO MARK Applicant: Manufacturer: Address: Address: Country: Country: 4 Standard(s): Product: Brand Name: Models: Unirac, Inc 1411 Broadway Blvd NE Albuquerque, NM 87102 USA Party Authorized To Apply Mark: Same as Manufacturer Report Issuing Office: Intertek Testing Services NA, Inc., Lake Forest, CA Control Number: 5019851 Authorized by: for L. Matthew Snyder, Certification Manager This document supersedes all previous Authorizations to Mark for the noted Report Number. This Authorization to Mark is for the exclusive use of Intertek's Client and is provided pursuant to the Certification agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Authorization to Mark. Only the Client is authorized to permit copying or distribution of this Authorization to Mark and then only in its entirety. Use of Intertek’s Certification mark is restricted to the conditions laid out in the agreement and in this Authorization to Mark. Any further use of the Intertek name for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification mark in accordance with the agreement, they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road, Arlington Heights, IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat- Plate Photovoltaic Modules and Panels [UL 2703:2015 Ed.1+R:29May2019] PV Module and Panel Racking Mounting System and Accessories [CSA TIL No. A-40:2020] Photovoltaic Mounting System, Sun Frame Microrail Installation Guide, PUB2021NOV29 Unirac Unirac SFM This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be applied only at the location of the Party Authorized To Apply Mark. Inc., Lake Forest, CA for L Matthew Snyder Certification ATM for Report 102393982LAX-002 Page 3 of 4 ATM Issued: 7-Jan-2022 ED 16.3.15 (16-Oct-2021) Mandatory AUTHORIZATION TO MARK Applicant: Manufacturer: Address: Address: Country: Country: 5 Standard(s): Product: Brand Name: Models: Unirac, Inc 1411 Broadway Blvd NE Albuquerque, NM 87102 USA Party Authorized To Apply Mark: Same as Manufacturer Listing Constructional Data Report (CDR) Report Number 102393982LAX-002 Original 11-Apr-2016 Revised: 2-Jan-2022 Standard(s) Applicant Manufacturer 2 Address Address Country Country Contact Contact Phone Phone FAX FAX Email Email Manufacturer 3 Manufacturer 4 Address Address Country Country Contact Contact Phone Phone FAX FAX Email Email Manufacturer 5 Address Country Contact Phone FAX 505-462-2190 505-843-1418 NA klaus.nicolaedis@unirac.com toddg@unirac.com 1411 Broadway Blvd NE Albuquerque, NM 87102 USA Klaus Nicolaedis Todd Ganshaw 1.0 Reference and Address Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat-Plate Photovoltaic Modules and Panels [UL 2703:2015 Ed.1+R:29May2019] PV Module and Panel Racking Mounting System and Accessories [CSA TIL No. A-40:2020] Unirac, Inc Page 1 of 136 Listing Constructional Data Report (CDR) Report Number 102393982LAX-002 Original 11-Apr-2016 Revised: 2-Jan-2022 1.0 Reference and Address Email Page 2 of 136 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: Report No. 102393982LAX-002 Unirac, Inc Page 4 of 136 Issued: 11-Apr-2016 Revised: 2-Jan-2022 2.0 Product Description Models Model Similarity Other Ratings Ratings Fuse Rating: 30A Module Orientation: Portrait or Landscape Maximum Module Size: 17.98 ft² UL2703 Design Load Rating: 33 PSF Downward, 33 PSF Upward, 10 PSF Down-Slope Tested Loads - 50 psf/2400Pa Downward, 50psf/2400Pa Uplift, 15psf/720Pa Down Slope Trina TSM-255PD05.08 and Sunpower SPR-E20-327 used for Mechanical Loading Increased size ML test: Maximum Module Size: 22.3 ft² UL2703 Design Load Rating: 113 PSF Downward, 50 PSF Upward, 30 PSF Down-Slope LG355S2W-A5 used for Mechanical Loading test. Mounting configuration: Four mountings on each long side of panel with the longest span of 24" UL2703 Design Load Rating: 46.9 PSF Downward, 40 PSF Upward, 10 PSF Down-Slope LG395N2W-A5, LG360S2W-A5 and LG355S2W-A5 used for used for Mechanical Loading test. Mounting configuration: Six mountings for two modules used with the maximum span of 74.5" IEC 61646 Test Loads - 112.78 psf/5400Pa Downward, 50psf/2400Pa Uplift Mechanical Load test to add FlashLoc Slider and Trim Assemblies to UL2703 and IEC 61646 Certifications, & Increase SFM System UL2703 Module Size: Maximum Module Size: 27.76 ft² UL2703 Design Load Rating: 113 PSF Downward, 50 PSF Upward, 21.6 PSF Down-Slope Jinko Eagle 72HM G5 used for Mechanical Loading test. Mounting configuration: Four mountings on each long side of panel with the longest span of 24" Mamzimum module size: 21.86 ft2 IEC 61646 Test Loads - 112.78 psf/5400Pa Downward, 75psf/3600Pa Uplift SunPower model SPR-A430-COM-MLSD used for Mechanical Loading Fire Class Resistance Rating: - Class A for Steep Slope Applications when using Type 1 Modules. Can be installed at any interstitial gap. Installations must include Trim Rail. - Class A for Steep Slope Applications when using Type 2 Modules. Can be installed at any interstitial gap. Installations must include Trim Rail. - Class A Fire Rated for Low Slope applications with Type 1 or 2 listed photovoltaic modules. This system was evaluated with a 5” gap between the bottom of the module and the roof’s surface See section 7.0 illustractions # 1, 1a, 1b, and 1c for a complete list of PV modules evaluated with these racking systems Unirac SFM NA NA ED 16.3.15 (16-Oct-2021) Mandatory Report No. 102393982LAX-002 Unirac, Inc Page 3 of 136 Issued: 11-Apr-2016 Revised: 2-Jan-2022 Product Brand name The product covered by this report is the Sun Frame Micro Rail roof mounted Photovoltaic Rack Mounting System. This system is designed to provide bonding and grounding to photovoltaic modules. The mounting system employs anodized or mill finish aluminum brackets that are roof mounted using the slider, outlined in section 4 of this report. There are no rails within this product, whereas the 3" Micro Rail, Floating Splice, and 9" Attached Splice Report No. 102393982LAX-002 Unirac, Inc Page 42 of 136 Issued: 11-Apr-2016 Revised: 2-Jan-2022 7.0 Illustrations Illustration 1 - Approved PV Modules ED 16.3.15 (16-Oct-2021) Mandatory Report No. 102393982LAX-002 Unirac, Inc Page 43 of 136 Issued: 11-Apr-2016 Revised: 2-Jan-2022 7.0 Illustrations Illustration 1a - Approved PV Modules Continue ED 16.3.15 (16-Oct-2021) Mandatory 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: REVISION: PAGE NUMBER: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS Report No. 102393982LAX-002 Unirac, Inc Page 44 of 136 Issued: 11-Apr-2016 Revised: 2-Jan-2022 7.0 Illustrations Illustration 1b - Approved PV Modules Continue ED 16.3.15 (16-Oct-2021) Mandatory 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: REVISION: PAGE NUMBER: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS 6+((71$0( 3$*(180%(5 5(9,6,21 &21),'(17,$/7+(,1)250$7,21 +(5(,1&217$,1('6+$//127%( 86(')257+(%(1(),72) $1<21((;&(37%/8(5$9(1 62/$51256+$//,7%( ',6&/26(',1:+2/(25,13$57 7227+(562876,'(5(&,3,(176 25*$1,=$7,21(;&(37,1 &211(&7,21:,7+7+(6$/($1' 86(2)7+(5(63(&7,9( (48,30(17:,7+2877+( :5,77(13(50,66,212)%/8( 5$9(162/$5//& 66 63(&6+((7  &2175$&725 %56),(/'236  39,167$//$7,21 352)(66,21$/ 6FRWW*XUQH\ 39 1$%&(3 &(57,),(' 15(6($5&+:$<%8,/',1*- 25(087  SFM SUN :::%/8(5$9(162/$5&20 FRAME MICRORAIL™ INSTALLATION GUIDE PAGE SYSTEM COMPONENTS C TrimrailTM Flashkit Sub-Components: /)RRW +H[EROW 7ULGULYHQXW &KDQQHO1XW 6FRFNHW+HDG&DS6FUHZ &KDQQHO6OLGHUZJURPPHW 3" Wide Flashing 6WUXFWXUDO6FUHZ 66(3'0:DVKHU Functions: • $WWDFK7ULPUDLOTMWRURRIDWWDFKPHQWˊDVKLQJ • 3DWHQWHGURRIVHDOLQJWHFKQRORJ\DWURRIDWWDFKPHQWSRLQW Features: • 6ORWSURYLGHVYHUWLFDODGMXVWPHQWVWROHYHODUUD\ • 6OLGHUSURYLGHVQRUWKVRXWKDGMXVWPHQWDORQJWKH VORSHRIWKHURRI • Shed and Seal Technology TrimrailTM and Module Clips Sub-Components:  Trim Rail  Module Clip  7%ROW  7UL'ULYH1XW TrimrailTM Functions: 6+((71$0( 3$*(180%(5 5(9,6,21 &21),'(17,$/7+(,1)250$7,21 +(5(,1&217$,1('6+$//127%( 86(')257+(%(1(),72) $1<21((;&(37%/8(5$9(1 62/$51256+$//,7%( ',6&/26(',1:+2/(25,13$57 7227+(562876,'(5(&,3,(176 25*$1,=$7,21(;&(37,1 &211(&7,21:,7+7+(6$/($1' 86(2)7+(5(63(&7,9( (48,30(17:,7+2877+( :5,77(13(50,66,212)%/8( 5$9(162/$5//& 66 63(&6+((7  &2175$&725 %56),(/'236  39,167$//$7,21 352)(66,21$/ 6FRWW*XUQH\ 39 1$%&(3 &(57,),(' 15(6($5&+:$<%8,/',1*- 25(087  SFMSUN :::%/8(5$9(162/$5&20 FRAME MICRORAIL™ INSTALLATION GUIDE PAGE SYSTEM COMPONENTS D SFM Slider Flashkit Sub-Components:  6OLGHU ZJURPPHW  6WUXFWXUDO 6FUHZ 66 (3'0 ZDVKHU  :LGH)ODVKLQJ Functions: • 3DWHQWHG 6KHG 6HDO URRI VHDOLQJ WHFKQRORJ\ DW URRI DWWDFK- PHQW SRLQW • )RU XVH ZLWK FRPSDWLEOH  0LFURUDLO RU  $WWDFKHG 6SOLFHV Features: • 6OLGHU SURYLGHV QRUWKVRXWK DGMXVWPHQW DORQJ WKH VORSH RI WKH URRI • Shed and Seal Technology Wire Bonding Clip w/ 8AWG Functions: • 5RZ WR URZ ERQGLQJ • 0RGXOH WR 7ULPUDLOTM ERQGLQJ • Single Use Only Features: 7RROOHVV LQVWDOODWLRQ MLPE Mounting Assembly Sub-Components:  0/3( 0RXQW %DVH   6RFNHW +HDG &DS 6FUHZ  %RQGLQJ 3LQ Functions: 6+((71$0( 3$*(180%(5 5(9,6,21 &21),'(17,$/7+(,1)250$7,21 +(5(,1&217$,1('6+$//127%( 86(')257+(%(1(),72) $1<21((;&(37%/8(5$9(1 62/$51256+$//,7%( ',6&/26(',1:+2/(25,13$57 7227+(562876,'(5(&,3,(176 25*$1,=$7,21(;&(37,1 &211(&7,21:,7+7+(6$/($1' 86(2)7+(5(63(&7,9( (48,30(17:,7+2877+( :5,77(13(50,66,212)%/8( 5$9(162/$5//& 66 63(&6+((7  &2175$&725 %56),(/'236  39,167$//$7,21 352)(66,21$/ 6FRWW*XUQH\ 39 1$%&(3 &(57,),(' 15(6($5&+:$<%8,/',1*- 25(087  SFMSUN :::%/8(5$9(162/$5&20 FRAME MICRORAIL™ INSTALLATION GUIDE PAGE FLASHING & SLIDERS G PILOT HOLES: 'ULOOSLORWKROHVIRUODJVFUHZVRU VWUXFWXUDOVFUHZV DVQHFHVVDU\ DW PDUNHGDWWDFKHPHQWSRLQWV FLASHINGS: 3ODFHˊDVKLQJV Ô INSTALL SLIDERS AND TRIMRAIL ROOF ATTACHMENTS: • ,QVHUWˊDVKLQJVSHUPDQXIDFWXUHULQVWUXFWLRQV NOTE: Use Lag screw or structural fastener with a maximum diameter of 5/16" • $WWDFKVOLGHUVWRUDIWHUV • 9HULI\SURSHUURZWRURZVSDFLQJIRUPRGXOHVL]H 0RG16 • (QVXUHWKDW7ULPUDLO70URRIDWWDFKPHQWVLQHDFKURZKDYHVXIˉFLHQW HQJDJHPHQWZLWKVOLGHUGRYHWDLOVIRUSURSHUDWWDFKPHQW INSTALL SLIDERS AND ROOF ATTACHMENTS: )ROORZPDQXIDFWXUHULQVWUXFWLRQV IRUˊDVKLQJLQVWDOODWLRQSURFHGXUHV NOTE: If N-S module edge is within 1” of the shingle course above, you have the option to pivot / rotate slider at the attachment point to span the next course and cut shingles as required. UP-× SLOPE DOWN-× SLOPE Mod NS + 1" Mod NS + 1" N/S MODULE EDGE Rotate Slider Cut Shingles as Required Less Than 1"  • 6HFXUHO\ PRXQWV 0/3( WR PRGXOH IUDPHV • 0/3( WR PRGXOH ERQGLQJ Features: • 0RXQWV HDVLO\ WR W\SLFDO PRGXOH ˊDQJH • UL2703 Recognized 0/3( 0RGXOH /HYHO 3RZHU (OHFWURQLFV HJ PLFURLQYHUWHU RU SRZHU RSWLPL]HU Module-to-Module N-S Bonding Sub-Components:  &ODPS  %RQGLQJ 3LQV    6RFNHW +HDG &DS 6FUHZ  &ODPS %DVH Functions/ Features: • 5RZ WR URZ ERQGLQJ • Single Use Only • )LWV PRGXOH VL]HV PP Trim -to- Module Bonding Clamp and Floating Trim Clamp Sub-Components:  :HGJH  %RQGLQJ 3LQ  7%ROW  1XW  &DVW %DVH Functions/ Features: • 0RGXOH WR 7ULPUDLOTM ERQGLQJ  VLQJOH XVH RQO\ • $WWDFKHV 7ULPUDLOTM WR PRGXOH ZKHQ IHZHU WKDQ  UDIWHU DWWDFKPHQW SRLQWV DUH DYDLODEOH • )LWV PRGXOH VL]HV PP • )LWV PRGXOH VL]HV PP o n p n q p n p o o n r p o q • 5HTXLUHGIURQWURZVWUXFWXUDOVXSSRUW ZLWKPRGXOHFOLSV • 0RGXOHPRXQWLQJ • ,QVWDOODWLRQDLG • $HVWKHWLFWULP Features: • 0RXQWVGLUHFWO\WR/IHHW • $OLJQVDQGFDSWXUHVPRGXOHOHDGLQJHGJH • 6XSSRUWVGLVFUHWHPRGXOHWKLFNQHVVHVIURP 38, and 40mm Module Clips Functions: • 5HTXLUHGIURQWURZVWUXFWXUDOVXSSRUW ZLWKWULPUDLO • 0RGXOHPRXQWLQJ Features: • 0RXQWVWR7ULPUDLOTMZLWK7EROWDQGWULGULYHQXW • 0DQXDOO\DGMXVWDEOHWRˉWPRGXOHWKLFNQHVVHV DQGPP TrimrailTM Splice Sub-Components:  6WUXFWXUDO6SOLFH([WUXVLRQ  %RQGLQJ&OLS Functions: • )URQWURZVWUXFWXUDOVXSSRUW • ,QVWDOODWLRQDLG • 6WUXFWXUDOO\FRQQHFWVSLHFHVRI7ULPUDLOTM • (OHFWULFDOO\ERQGVSLHFHVRI7ULPUDLOTM Features: • $OLJQVDQGFRQQHFWV7ULPUDLOTM pieces • 7RROOHVVLQVWDOODWLRQ n o p q n o p q r t n u o s electrically bond the modules together forming the path to ground. The Micro Rails are installed onto the module frame by using a stainless steel bolt anodized with black oxide with a stainless type 300 bonding pin, torqued to 20 ft-lbs, retaining the modules to the bracket. The bonding pin of the Micro Rail when bolted and torqued, penetrate the anodized coating of the photovoltaic module frame (at bottom flange) to contact the metal, creating a bonded connection from module to module. The grounding of the entire system is intended to be in accordance with the latest edition of the National Electrical Code, including NEC 250: Grounding and Bonding, and NEC 690: Solar Photovoltaic Systems or the Canadian Electrical Code, CSA C22.1 Part 1 in accordance to the revision in effect in the jurisdiction in which the project resides. Any local electrical codes must be adhered in addition to the national electrical codes. The Grounding Lug is secured to the photovoltaic module, torqued in accordance with the installation manual provided in this document. Other optional grounding includes the use of the Enphase UL2703 certified grounding system, which requires a minimum of 2 micro-inverters mounted to the same rail, and using the same engage cable. 2.0 Product Description Photovoltaic Mounting System, Sun Frame Microrail Installation Guide, PUB2021NOV29 Unirac Description ED 16.3.15 (16-Oct-2021) Mandatory 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: REVISION: PAGE NUMBER: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS PLOT DATE: PROJECT NUMBER: SHEET NAME: REVISION: PAGE NUMBER: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS Report Issuing Office: Intertek Testing Services NA, Inc., Lake Forest, CA Control Number: 5021866 Authorized by: for L. Matthew Snyder, Certification Manager This document supersedes all previous Authorizations to Mark for the noted Report Number. Unirac SFM This Authorization to Mark is for the exclusive use of Intertek's Client and is provided pursuant to the Certification agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Authorization to Mark. Only the Client is authorized to permit copying or distribution of this Authorization to Mark and then only in its entirety. Use of Intertek’s Certification mark is restricted to the conditions laid out in the agreement and in this Authorization to Mark. Any further use of the Intertek name for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification mark in accordance with the agreement, they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road, Arlington Heights, IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat- Plate Photovoltaic Modules and Panels [UL 2703:2015 Ed.1+R:29May2019] PV Module and Panel Racking Mounting System and Accessories [CSA TIL No. A-40:2020] Photovoltaic Mounting System, Sun Frame Microrail Installation Guide, PUB2021NOV29 Unirac This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be applied only at the location of the Party Authorized To Apply Mark. , Lake Forest, CA L. Matthew Snyder, Certification Ma ATM for Report 102393982LAX-002 Page 4 of 4 ATM Issued: 7-Jan-2022 ED 16.3.15 (16-Oct-2021) Mandatory 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: REVISION: PAGE NUMBER: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS Report Issuing Office: Intertek Testing Services NA, Inc., Lake Forest, CA Control Number: 5014989 Authorized by: for L. Matthew Snyder, Certification Manager This document supersedes all previous Authorizations to Mark for the noted Report Number. This Authorization to Mark is for the exclusive use of Intertek's Client and is provided pursuant to the Certification agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Authorization to Mark. Only the Client is authorized to permit copying or distribution of this Authorization to Mark and then only in its entirety. Use of Intertek’s Certification mark is restricted to the conditions laid out in the agreement and in this Authorization to Mark. Any further use of the Intertek name for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification mark in accordance with the agreement, they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road, Arlington Heights, IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat- Plate Photovoltaic Modules and Panels [UL 2703:2015 Ed.1+R:29May2019] PV Module and Panel Racking Mounting System and Accessories [CSA TIL No. A-40:2020] Photovoltaic Mounting System, Sun Frame Microrail Installation Guide, PUB2021NOV29 Unirac Unirac SFM This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be applied only at the location of the Party Authorized To Apply Mark. Lake Forest, CA Matthew Snyder Certification Man ATM for Report 102393982LAX-002 Page 2 of 4 ATM Issued: 7-Jan-2022 ED 16.3.15 (16-Oct-2021) Mandatory 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: REVISION: PAGE NUMBER: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS  6$( 9%+1[[[.$ .$ .$ 9%+1[[[=$9%+1[[[=$ 9%+1[[[=$9%+1[[[=$ Peimar 6*[[[0 )%%) Phono Solar 3636 Prism Solar P72 Series 4&HOOV 3OXV3UR3HDN****  **  3UR3HDN/*/*/*/*/* 43($.'82%/.* 43($.'82%/.*76 43($.'82 %/. *  43($.'82/*%)) 43($.'82 %/. 0/*  43($.'82;/*** 43($.'82 %/. 0/*  43($.'82;/* FG REC $OSKD   %ODFN  3XUH 13HDN %ODFN 13HDN %ODFN 3($.(QHUJ\6HULHV 3($.(QHUJ\%/.6HULHV 3($.(QHUJ\6HULHV Manufacture Module Model / Series 5(& FRQW 7ZLQ3HDN6HULHV 7ZLQ3HDN6HULHV 7ZLQ3HDN%/.6HULHV 7ZLQ3HDN6 0  ;9 7ZLQ3HDN6HULHV PP 73 %ODFN Renesola 9LWUXV6HULHV 6HULHV Risen 560 0'*  0 560 S-Energy 61 616HULHV PP Seraphim SEG-6 & SRP-6 Series Sharp NU-SA & NU-SC Series 6LOIDE 6/$6/*%&6HULHV 6,/[[[ %/1/17+/ 0/%.1;18+&  Solaria 3RZHU;7[[[5 $&3'%' 3RZHU;7[[[&3' 3RZHU;7[[[530 $& SolarWorld 6XQPRGXOH3URWHFW Sunmodule Plus Sonali SS 230 - 265 6XQWHFK STP 6XQLYD 096HULHV 2SWLPXV6HULHV 6XQ(GLVRQ)OH[WURQLFV )6HULHV56HULHV )/(;);66HULHV SunPower ;6HULHV(6HULHV 36HULHV Talesun 73737373 73+LSRU06PDUW Tesla 6&6&%6&%6&% TxxxS Trina 3$3''''(''3( 3'3('''('('( 3(+ Upsolar 830[[[3 %  830[[[0 % URE '0[[[+$' 0. [[[+$ )$.[[[ &*(* )$0[[[(*%% )$0[[[(* %% 9LNUDP (OGRUD 6ROLYR Somera Waaree AC & Adiya Series Winaico WST & WSP Series Yingli YGE & YLM Series ZN Shine =;0 Manufacture Module Model / Series Manufacture Module Model / Series ȫ 8QOHVVRWKHUZLVHQRWHGDOOPRGXOHVOLVWHGDERYHLQFOXGHDOOZDWWDJHVDQGVSHFLʳFPRGHOVZLWKLQWKDWVHULHV9DULDEOHZDWWDJHVDUHUHSUHVHQWHGDV[[[ ȫ ,WHPVLQSDUHQWKHVLVDUHWKRVHWKDWPD\RUPD\QRWEHSUHVHQWLQDFRPSDWLEOHPRGXOH VPRGHO,' ȫ 6ODVKHVEHWZHHQRQHRUPRUHLWHPVLQGLFDWHVWKDWHLWKHURIWKRVHLWHPVPD\EHWKHRQHWKDWLVSUHVHQWLQDPRGXOH VPRGHO,' ȫ 3OHDVHVHHWKH6)08/&RQVWUXFWLRQ'DWD5HSRUWDW8QLUDFFRPWRHQVXUHWKHH[DFWVRODUPRGXOHVHOHFWHGLVDSSURYHGIRUXVHZLWK6)0 ȫ 6)0,QʳQLW\LVQRWFRPSDWLEOHZLWKPRGXOHIUDPHKHLJKWRIOHVVWKDQPPDQGPRUHWKDQPP6HH0RGXOH0RXQWLQJVHFWLRQSDJH/IRUIXUWKHULQIRUPDWLRQ INSTALLATION GUIDE 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: REVISION: PAGE NUMBER: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS  +)  &+600+& Auxin $;107$;137 $;107 $;137 $[LWHF $;,EODFNSUHPLXP PP  $;,SRZHU PP  $;,SRZHU PP  $;,SUHPLXP PP  $;,SUHPLXP PP  $SWRV '1$ %)0)  '1$ %)0)  %RYLHW %90 %90 %<' 3. 0+.6HULHV Canadian Solar &6 +.8< 06 &6 ./8 &6.0%$*&6. 063 &6106&680%$*&68 063 &6: &6$0&6 .8 &6. 03 &6.06 &63 03 &68 03 &690&6;3 &HQWURVRODU$PHULFD C-Series & E-Series &HUWDLQ7HHG &7[[0[[&7[[3[[ &7[[[0[[&7[[[0 &7[[[0[[&7[[[+& 'HKXL '+0 Manufacture Module Model / Series Eco Solargy Orion 1000 & Apollo 1000 ET Solar (70%+[[[7: )UHH9ROW Mono PERC GCL GCL-P6 & GCL-M6 Series +DQVRO 7'$17'$1 8%$18'$1 +HOLHQH 0030 36HULHV +76RODU +7 0  1'9  )  +7 03 +\XQGDL .*0*7*5,5*7,0,+, .,6HULHV +L$6[[[+* ,7(. L7L7+( L76(6HULHV Japan Solar JPS-60 & JPS-72 Series JA Solar -$3[[[-$0[[[6,-$0 .  [[[-$3 N [[[%%-$36<<[[[== -$3 N [[[%%-$36<<[[[== -$0 N [[[==-$06<<[[[== -$0 N [[[==-$06<<[[[== L<< LL==6&35%3+L7,%0:05 -LQNR -.0 -.066HULHV (DJOH-.0[[[0 -.0[[[0+/9 .\RFHUD .86HULHV /*(OHFWURQLFV LGxxxN2T-A4 /*[[[ $&(&(.1&1.171: 4&4.6&6: $ LGxxxN2T-B5 /*[[[1.% /*[[[ $&0&0.1&1.4&4. 4$&4$. $ /*[[[ 1&1.171: ( /*[[[ 1&1.1:6&6: * LGxxxN2T-J5 /*[[[ 1.1:171: / /*[[[ 1&4&4. 1 /*[[[ 1&1.1:4&4. 9 LONGi /5 +,%+,++3%+3+ [[[0 /5 +,++3+ [[[0 /5 %3+%'+,%' [[[0 PP /5 %. 3( +3% +3+ [[[0 PP /5 %. 3( 3% 3+ [[[0 PP /5 %3 +%' +,%' [[[0 PP /5 +9 %. 3( 3+ 3% +3+ [[[0 PP /5 %. +9 3( 3% 3+ [[[0 PP Mission Solar Energy MSE Series 0LWVXELVKL MJE & MLE Series 1HR6RODU3RZHU&R '0 '36HULHV Manufacture Module Model / Series Manufacture Module Model / Series ȫ 8QOHVVRWKHUZLVHQRWHGDOOPRGXOHVOLVWHGDERYHLQFOXGHDOOZDWWDJHVDQGVSHFLʳFPRGHOVZLWKLQWKDWVHULHV9DULDEOHZDWWDJHVDUHUHSUHVHQWHGDV[[[ ȫ ,WHPVLQSDUHQWKHVLVDUHWKRVHWKDWPD\RUPD\QRWEHSUHVHQWLQDFRPSDWLEOHPRGXOH VPRGHO,' ȫ 6ODVKHVEHWZHHQRQHRUPRUHLWHPVLQGLFDWHVWKDWHLWKHURIWKRVHLWHPVPD\EHWKHRQHWKDWLVSUHVHQWLQDPRGXOH VPRGHO,' ȫ 3OHDVHVHHWKH6)08/&RQVWUXFWLRQ'DWD5HSRUWDW8QLUDFFRPWRHQVXUHWKHH[DFWVRODUPRGXOHVHOHFWHGLVDSSURYHGIRUXVHZLWK6)0 ȫ 6)0,QʳQLW\LVQRWFRPSDWLEOHZLWKPRGXOHIUDPHKHLJKWRIOHVVWKDQPPDQGPRUHWKDQPP6HH0RGXOH0RXQWLQJVHFWLRQSDJH/IRUIXUWKHULQIRUPDWLRQ INSTALLATION GUIDE 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: REVISION: PAGE NUMBER: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS ,QVWDOODWLRQ*XLGH6)0KDVEHHQFODVVLʳHGWR WKHV\VWHPOHYHOʳUHSRUWLRQRI8/7KLV8/FODVVLʳFDWLRQKDVEHHQ LQFRUSRUDWHGLQWRWKH8/SURGXFWFHUWLʳFDWLRQ6)0KDVDFKLHYHG&ODVV$ % &V\VWHPOHYHOSHUIRUPDQFHIRUORZVORSH VWHHSVORSHGURRIVZKHQXVHG LQFRQMXQFWLRQZLWKW\SHDQGW\SHPRGXOHV&ODVV$% &V\VWHPOHYHOʳUH UL2703 TEST MODULES 6HHSDJHV9DQG:IRUDOLVWRIPRGXOHVWKDWZHUHHOHFWULFDOO\DQGPHFKDQLFDOO\WHVWHGRU TXDOLʳHGZLWKWKH681)5$0(0,&525$,/ 6)0 FRPSRQHQWVRXWOLQHGZLWKLQWKLV,QVWDOODWLRQ*XLGH • 0D[LPXP$UHDRI0RGXOH VTIW • 8/'HVLJQ/RDG5DWLQJV D 'RZQZDUG3UHVVXUHȡ36)3D E 8SZDUG3UHVVXUHȡ36)3D F 'RZQ6ORSH/RDGȡ36)3D • 7HVWHG/RDGV D 'RZQZDUG3UHVVXUHȡ36)3D E 8SZDUG3UHVVXUHȡ36)3D F 'RZQ6ORSH/RDGȡ36)3D • 0D[LPXP6SDQ IW • 8VHZLWKDPD[LPXPRYHUFXUUHQWSURWHFWLRQGHYLFH2&3'RI$ • 6\VWHPFRQIRUPVWR8/6WGFHUWLʳHGWR/75$( • 5DWHGIRUDGHVLJQORDGRI3D3DZLWKLQFKVSDQ • 39PRGXOHVPD\KDYHDUHGXFHGORDGUDWLQJLQGHSHQGHQWRIWKH6)0ORDGUDWLQJ3OHDVHFRQVXOW WKH39PRGXOHPDQXIDFWXUHU VLQVWDOODWLRQJXLGHIRUPRUHLQIRUPDWLRQ • 'RZQ6ORSHGHVLJQORDGUDWLQJRI36)3DIRUPRGXOHDUHDVRIVTIWRUOHVV Module Type Roof Slope System Level Fire Rating Microrail Direction Module Orientation Mitigation Required Type 1 and Type 2 6WHHS6ORSH /RZ6ORSH &ODVV$% & (DVW:HVW /DQGVFDSH253RUWUDLW None Required SHUIRUPDQFHLVLQKHUHQWLQWKH6)0GHVLJQDQGQRDGGLWLRQDOPLWLJDWLRQPHDVXUHV DUHUHTXLUHG7KHʳUHFODVVLʳFDWLRQUDWLQJLVYDOLGIRUDQ\URRISLWFK7KHUHLVQR UHTXLUHGPLQLPXPRUPD[LPXPKHLJKWOLPLWDWLRQDERYHWKHURRIGHFNWRPDLQWDLQ WKH&ODVV$% &ʳUHUDWLQJIRU6)0681)5$0(0,&525$,/TM FRPSRQHQWVVKDOO EHPRXQWHGRYHUDʳUHUHVLVWDQWURRIFRYHULQJUDWHGIRUWKHDSSOLFDWLRQ INSTALLATION GUIDE 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: REVISION: PAGE NUMBER: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS EXCEPT BLUE RAVEN SOLAR NOR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: REVISION: PAGE NUMBER: CERTIFIED Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 CONFIDENTIAL- THE INFORMATION USED FOR THE BENEFIT OF ANYONE SHALL IT BE DISCLOSED IN WHOLE OR USE OF THE RESPECTIVE EQUIPMENT, DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: REVISION: PAGE NUMBER: ---- NABCEP PV INSTALLATION PROFESSIONAL SPEC SHEET SS [0.24±0.01] 28 [1.1] 1016±2.5 [40 ±0.1] 17 [0.7] 45 [1.8] 153.7 [6.05] 153.7 [6.05] www.recgroup.com GENERAL DATA Cell type: 132 half-cut REC heterojunction cells with lead-free, gapless technology, 6 strings of 22 cells in series Glass: 3.2 mm solar glass with anti-reflective surface treatment in accordance with EN 12150 Backsheet: Highly resistant polymer (black) Frame: Anodized aluminum (black) Junction box: 3-part, 3 bypass diodes, lead-free IP68 rated, in accordance with IEC 62790 Connectors: Stäubli MC4 PV-KBT4/KST4 (4 mm²) in accordance with IEC 62852, IP68 only when connected Cable: 4 mm² solar cable, 1.1 m + 1.2 m in accordance with EN 50618 Dimensions: 1821 x 1016 x 30 mm (1.85 m2) Weight: 20.5 kg Origin: Made in Singapore Specifications subject to change without notice. Measurements in mm [in] LOW LIGHT BEHAVIOUR Typical low irradiance performance of module at STC: WARRANTY Standard REC ProTrust Installed by an REC Certified Solar Professional No Yes Yes System Size All ≤25 kW 25-500 kW Product Warranty (yrs) 20 25 25 Power Warranty (yrs) 25 25 25 Labor Warranty (yrs) 0 25 10 Power in Year 1 98% 98% 98% Annual Degradation 0.25% 0.25% 0.25% Power in Year 25 92% 92% 92% See warranty documents for details. Conditions apply Irradiance (W/m²) Rel. Efficiency (%) TEMPERATURE RATINGS* Nominal Module Operating Temperature: 44°C (±2°C) Temperature coefficient of PMAX:-0.26 %/°C Temperature coefficient of VOC:-0.24 %/°C Temperature coefficient of ISC:0.04 %/°C *The temperature coefficients stated are linear values CERTIFICATIONS IEC 61215:2016, IEC 61730:2016, UL 61730 IEC 62804 PID IEC 61701 Salt Mist IEC 62716 Ammonia Resistance ISO 11925-2 Ignitability (Class E) IEC 62782 Dynamic Mechanical Load IEC 61215-2:2016 Hailstone (35mm) IEC 62321 Lead-freeacc. to RoHS EU 863/2015 ISO 14001, ISO 9001, IEC 45001, IEC 62941 DELIVERY INFORMATION Panels per pallet: 33 Panels per 40 ft GP/high cube container: 792 (24 pallets) Panels per 13.6 m truck: 924 (28 pallets) Panels per 53 ft truck: 891 (27 pallets) MAXIMUM RATINGS Operational temperature: -40 ... +85°C Maximum system voltage: 1000 V Maximum test load (front): + 7000 Pa (713 kg/m²)* Maximum test load (rear): - 4000 Pa (407 kg/m²)* Max series fuse rating: 25 A Max reverse current: 25 A * See installation manual for mounting instructions. Design load = Test load / 1.5 (safety factor) NMOT STC Founded in 1996, REC Group is an international pioneering solar energy company dedicated to empowering consumers with clean, affordable solar power. As Solar’s Most Trusted, REC is committed to high quality, innovation, and a low carbon footprint in the solar materials and solar panels it manufactures. Headquartered in Norway with operational headquarters in Singapore, REC also has regional hubs in North America, Europe, and Asia-Pacific. 85 90 95 100 105 100 200 300 400 500 600 700 800 900 1000 REC Alpha Pure Series Product SPECIFICATIONS take-e-way WEEE-compliant Lead-Free recycling scheme ELECTRICAL DATA Product Code*: RECxxxAA Pure Power Output - PMAX (Wp) 385 390 395 400 405 410 Watt Class Sorting - (W) 0/+5 0/+5 0/+5 0/+5 0/+5 0/+5 Nominal Power Voltage - VMPP (V) 41.2 41.5 41.8 42.1 42.4 42.7 Nominal Power Current - IMPP (A) 9.35 9.40 9.45 9.51 9.56 9.61 Open Circuit Voltage - VOC (V) 48.5 48.6 48.7 48.8 48.9 49.0 Short Circuit Current - ISC (A) 10.18 10.19 10.20 10.25 10.30 10.35 Power Density (W/m2) 208 211 214 216 219 222 Panel Efficiency (%) 20.8 21.1 21.4 21.6 21.9 22.2 Power Output - PMAX (Wp) 293 297 301 305 309 312 Nominal Power Voltage - VMPP (V) 38.8 39.1 39.4 39.7 40.0 40.2 Nominal Power Current - IMPP (A) 7.55 7.59 7.63 7.68 7.72 7.76 Open Circuit Voltage - VOC (V) 45.7 45.8 45.9 46.0 46.1 46.2 Short Circuit Current - ISC (A) 8.16 8.20 8.24 8.28 8.32 8.36 Values at standard test conditions (STC: air mass AM 1.5, irradiance 1000 W/m², temperature 25°C), based on a production spread with a tolerance of PMAX, VOC & ISC ±3% within one watt class. Nominal module operating temperature (NMOT: air mass AM 1.5, irradiance 800 W/m², temperature 20°C, windspeed 1 m/s). * Where xxx indicates the nominal power class (PMAX) at STC above. plug-in breakers (not included) • 80 A total PV or storage branch circuits Reliable ŵ (YVEFPI 2680GIVXMƤIH 2)1% X]TI 3R enclosure • Five-year limited warranty •UL listed To learn more about Enphase offerings, visit enphase.com © 2018 Enphase Energy. All rights reserved. Enphase, the Enphase logo, IQ Combiner 3, and other trademarks or service names are the trademarks of Enphase Energy, Inc. 2019-11-04 MODEL NUMBER IQ Combiner 3 <-5%1 IQ Combiner 3 with Enphase IQ Envoy™ printed circuit board for integrated revenue grade PV production QIXIVMRK %27- '   ERH STXMSREP consumption QSRMXSVMRK    ACCESSORIES and REPLACEMENT PARTS (not included, order separately) )RTLEWI 1SFMPI 'SRRIGXƎ ')0013()1 +]IEV HEXE TPER ')0013()1 +]IEV HEXE TPER ')0013()11 + FEWIH 08)1]IEV HEXE TPER Plug and play industrial grade cellular modem with data plan for systems up to 60 QMGVSMRZIVXIVW %ZEMPEFPIMRXLI97'EREHE1I\MGS4YIVXS6MGSERHXLI97:MVKMR-WPERHW [LIVI XLIVI MW EHIUYEXI GIPPYPEV WIVZMGI MR XLI MRWXEPPEXMSR EVIE 'SRWYQTXMSR 1SRMXSVMRK '8 CT-200-SPLIT Split core current transformers enable whole home consumption QIXIVMRK     'SRWYQTXMSR QSRMXSVMRK MW VIUYMVIH JSV )RTLEWI 7XSVEKI 7]WXIQW Wireless USB adapter '3117/-8 -RWXEPPIHEXXLI-5)RZS]*SVGSQQYRMGEXMSRW[MXL)RTLEWI)RGLEVKIƎWXSVEKI ERH )RTLEWI )RTS[IVƎWQEVXW[MXGL-RGPYHIW97&GEFPIJSVGSRRIGXMSRXS-5)RZS]SV)RTLEWI -5 'SQFMRIVƎ ERH EPPS[W VIHYRHERX [MVIPIWW GSQQYRMGEXMSR [MXL )RGLEVKI ERH )RTS[IV Circuit Breakers &6/% &6/% &6/%4 7YTTSVXW )EXSR &6 &6 &6 &6 &6 &6 ERH &6 GMVGYMXFVIEOIVW 'MVGYMX FVIEOIV  TSPI % )EXSR &6 'MVGYMX FVIEOIV  TSPI % )EXSR &6 Circuit breaker, 2 pole, 20A, Eaton BR220 )40' Power line carrier (communication bridge pair), quantity - one pair <%409+ %GGIWWSV] VIGITXEGPI JSV 4S[IV 0MRI 'EVVMIV MR -5 'SQFMRIV  VIUYMVIH JSV )40' XA-ENV-PCBA-3 Replacement IQ Envoy printed circuit board (PCB) for Combiner 3 ELECTRICAL SPECIFICATIONS Rating Continuous duty System voltage  :%'  ,^ Eaton BR series busbar rating  % 1E\ GSRXMRYSYW GYVVIRX VEXMRK SYXTYX XS KVMH  % 1E\ JYWIGMVGYMX VEXMRK SYXTYX 90 A &VERGL GMVGYMXW WSPEV ERHSV WXSVEKI 9T XS JSYV TSPI )EXSR &6 WIVMIW (MWXVMFYXIH +IRIVEXMSR (+ FVIEOIVW SRP] RSX MRGPYHIH 1E\ GSRXMRYSYW GYVVIRX VEXMRK MRTYX JVSQ 4: 64 A 1E\ XSXEP FVERGL GMVGYMX FVIEOIV VEXMRK MRTYX % SJ HMWXVMFYXIH KIRIVEXMSR%[MXL-5)RZS]FVIEOIVMRGPYHIH 4VSHYGXMSR 1IXIVMRK '8 200 A solid core pre-installed and wired to IQ Envoy MECHANICAL DATA (MQIRWMSRW ;\,\( \\GQ ű\ű\ű ,IMKLXMW  GQ [MXL QSYRXMRK FVEGOIXW  Weight  OK  PFW Ambient temperature range {'XS{' {XS{* Cooling Natural convection, plus heat shield Enclosure environmental rating 3YXHSSV 2680GIVXMƤIH 2)1% X]TI 6 TSP]GEVFSREXI GSRWXVYGXMSR Wire sizes • %XS%FVIEOIVMRTYXWXS%;+GSTTIVGSRHYGXSVW •  % FVIEOIV FVERGL MRTYX XS  %;+ GSTTIV GSRHYGXSVW • 1EMR PYK GSQFMRIH SYXTYX XS  %;+ GSTTIV GSRHYGXSVW • 2IYXVEP ERH KVSYRH XS  GSTTIV GSRHYGXSVW %P[E]W JSPPS[ PSGEP GSHI VIUYMVIQIRXW JSV GSRHYGXSV WM^MRK Altitude 8S  QIXIVW  JIIX INTERNET CONNECTION OPTIONS Integrated Wi-Fi FKR Ethernet 3TXMSREP'EX) SV'EX 984)XLIVRIXGEFPI RSXMRGPYHIH Cellular 3TXMSREP ')0013()1 + SV ')0013()1 + SV ')0013()11 + FEWIH 08)1 (not included) COMPLIANCE Compliance, Combiner 90 '%2'7% ' 2S   '*6 4EVX  'PEWW & -')7  4VSHYGXMSR QIXIVMRK %27- ' EGGYVEG] GPEWW  4: TVSHYGXMSR Compliance, IQ Envoy 90 '%2'7%  2S  Enphase IQ Combiner 3 • UL listed Smart Grid Ready • Complies with advanced grid support, voltage and frequency ride-through requirements • Remotely updates to respond to changing grid requirements ŵ 'SRƤKYVEFPIJSVZEV]MRKKVMHTVSƤPIW • Meets CA Rule 21 (UL 1741-SA) * The IQ 7+ Micro is required to support 72-cell/144 half-cell modules. 1. No enforced DC/AC ratio. See the compatibility calculator at https://enphase.com/en-us/support/module-compatibility. 2. Nominal voltage range can be extended beyond nominal if required by the utility. 3. Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area. To learn more about Enphase offerings, visit enphase.com k)RTLEWI)RIVK]%PPVMKLXWVIWIVZIH)RTLEWIXLI)RTLEWIPSKS)RTLEWI-5)RTLEWI-5)RTLEWI-5&EXXIV] )RTLEWI)RPMKLXIR)RTLEWI-5)RZS]ERHSXLIVXVEHIQEVOWSVWIVZMGIREQIWEVIXLIXVEHIQEVOWSJ)RTLEWI)RIVK]-RG(EXEWYFNIGXXSGLERKI INPUT DATA (DC) IQ7-60-2-US IQ7PLUS-72-2-US Commonly used module pairings¹ 235 W - 350 W + 235 W - 440 W + Module compatibility 60-cell/120 half-cell PV modules only 60-cell/120 half-cell and 72- cell/144 half-cell PV modules Maximum input DC voltage 48 V 60 V Peak power tracking voltage 27 V - 37 V 27 V - 45 V Operating range 16 V - 48 V 16 V - 60 V Min/Max start voltage 22 V / 48 V 22 V / 60 V Max DC short circuit current (module Isc) 15 A 15 A Overvoltage class DC port II II DC port backfeed current 0 A 0 A 4:EVVE]GSRƤKYVEXMSR 1 x 1 ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA (AC) IQ 7 Microinverter IQ 7+ Microinverter Peak output power 250 VA 295 VA Maximum continuous output power 240 VA 290 VA Nominal (L-L) voltage/range² 240 V / 211-264 V 208 V / 183-229 V 240 V / 211-264 V 208 V / 183-229 V Maximum continuous output current 1.0 A (240 V) 1.15 A (208 V) 1.21 A (240 V) 1.39 A (208 V) Nominal frequency 60 Hz 60 Hz Extended frequency range 47 - 68 Hz 47 - 68 Hz AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms Maximum units per 20 A (L-L) branch circuit³ 16 (240 VAC) 13 (208 VAC) 13 (240 VAC) 11 (208 VAC) Overvoltage class AC port III III AC port backfeed current 18 mA 18 mA Power factor setting 1.0 1.0 Power factor (adjustable) 0.85 leading ... 0.85 lagging 0.85 leading ... 0.85 lagging EFFICIENCY @240 V @208 V @240 V @208 V 4IEOIJƤGMIRG] 97.6 % 97.6 % 97.5 % 97.3 % ')'[IMKLXIHIJƤGMIRG] 97.0 % 97.0 % 97.0 % 97.0 % MECHANICAL DATA Ambient temperature range -40ºC to +65ºC Relative humidity range 4% to 100% (condensing) Connector type MC4 (or Amphenol H4 UTX with additional Q-DCC-5 adapter) Dimensions (HxWxD) 212 mm x 175 mm x 30.2 mm (without bracket) Weight 1.08 kg (2.38 lbs) Cooling Natural convection - No fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated, corrosion resistant polymeric enclosure Environmental category / UV exposure rating NEMA Type 6 / outdoor FEATURES Communication Power Line Communication (PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load-break disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741-SA) UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014, NEC 2017, and NEC 2020 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according manufacturer’s instructions. Enphase IQ 7 and IQ 7+ Microinverters NOMINAL OPERATING AC VOLTAGE LABEL 3 IF INTERCONNECTING LOAD SIDE, INSTALL THIS LABEL ANYWHERE THAT IS POWERED BY BOTH THE UTILITY AND THE SOLAR PV SYSTEM, IE. MAIN SERVICE PANEL AND SUBPANELS. [NEC 705.12(B)(3)] DUAL POWER SUPPLY SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM ! WARNING LABEL 4 APPLY TO THE DISTRIBUTION EQUIPMENT ADJACENT TO THE BACK-FED BREAKER FROM THE POWER SOURCE. [NEC 705.12(B)(2)] POWER SOURCE OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE ! WARNING LABEL 5 APPLY TO THE PV COMBINER BOX [NEC 705.12 (3)(3)] THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUSBAR. ! WARNING LABEL 6 BUILDINGS WITH PV SYSTEMS SHALL HAVE A PERMANENT LABEL LOCATED AT EACH SERVICE EQUIPMENT LOCATION TO WHICH THE PV SYSTEMS ARE CONNECTED OR AT AN APPROVED READILY VISIBLE LOCATION AND SHALL INDICATE THE LOCATION OF RAPID SHUTDOWN INITIATION DEVICES. [NEC 690.56(C)] SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS LABEL 7 SIGN LOCATED AT RAPID SHUT DOWN DISCONNECT SWITCH [NEC 690.56(C)(2)] RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM LABEL 8 PERMANENT PLAQUE OR DIRECTORY DENOTING THE LOCATION OF ALL ELECTRIC POWER SOURCE DISCONNECTING MEANS ON OR IN THE PREMISES SHALL BE INSTALLED AT EACH SERVICE EQUIPMENT LOCATION AND AT THE LOCATION(S) OF THE SYSTEM DISCONNECT(S) FOR ALL ELECTRIC POWER PRODUCTION SOURCES CAPABLE OF BEING INTERCONNECTED. [2017 NEC 705.10] MAIN DISTRIBUTION UTILITY DISCONNECT(S) POWER TO THIS BUILDING IS ALSO SUPPLIED FROM A ROOF MOUNTED SOLAR ARRAY WITH A RAPID SHUTDOWN DISCONNECTING MEANS GROUPED AND LABELED WITHIN LINE OF SITE AND 10 FT OF THIS LOCATION ! WARNING LABEL 9 PERMANENT PLAQUE OR DIRECTORY DENOTING THE LOCATION OF ALL ELECTRIC POWER SOURCE DISCONNECTING MEANS ON OR IN THE PREMISES SHALL BE INSTALLED AT EACH SERVICE EQUIPMENT LOCATION AND AT THE LOCATION(S) OF THE SYSTEM DISCONNECT(S) FOR ALL ELECTRIC POWER PRODUCTION SOURCES CAPABLE OF BEING INTERCONNECTED. [2017 NEC 705.10] POWER TO THIS BUILDING IS ALSO SUPPLIED FROM MAIN DISTRIBUTION UTILITY DISCONNECT LOCATED ! WARNING LABEL 10 PERMANENT PLAQUE OR DIRECTORY TO BE LOCATED AT MAIN SERVICE EQUIPMENT DENOTING THE LOCATION OF THE RAPID SHUTDOWN SYSTEM DISCONNECTING MEANS IF SOLAR ARRAY RAPID SHUTDOWN DISCONNECTING SWITCH IS NOT GROUPED AND WITHIN LINE OF SITE OF MAIN SERVICE DISCONNECTING MEANS. [2017 NEC 705.10 AND 690.56(C)(1)] LABEL 11 PERMANENT PLAQUE OR DIRECTORY TO BE LOCATED AT AC COMBINER PANEL. [NEC 110.21(B)] POWER TO THIS BUILDING IS ALSO SUPPLIED FROM A ROOF MOUNTED SOLAR ARRAY. SOLAR ARRAY RAPID SHUTDOWN DISCONNECT IS LOCATED OUTSIDE NEXT TO THE UTILITY METER. ! WARNING PHOTOVOLTAIC SYSTEM COMBINER PANEL DO NOT ADD LOADS ! WARNING STANDARD LABELS ADDITIONAL LABELS *ELECTRICAL DIAGRAM SHOWN ABOVE IS FOR LABELING PURPOSES ONLY. NOT AN ACTUAL REPRESENTATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS PRESENTED MAY VARY DEPENDING ON TYPE OF INTERCONNECTION METHOD AND LOCATION PRESENTED ON 3 LINE DIAGRAM. 3 LINE DIAGRAM ON PV5 TO REFLECT ACTUAL REPRESENTATION OF PROPOSED SCOPE OF WORK. UTILITY METER MAIN SERVICE PANEL 1 6 2 3 IF BREAKER 4 IS USED 8 OR 10 OR PLACARD SUBPANEL (IF INTERCONNECTION IS MADE HERE) 1 6 2 3 4 9 AC DISCONNECT 1 2 7 9 OR PLACARD PV COMBINER BOX 1 2 5 8 11 LABEL 12 AT EXPOSED RACEWAYS, CABLE TRAYS, COVERS AND ENCLOSURES OF JUNCTION BOXES, AND OTHER WIRING METHODS. [NEC 690.31(G)(3&4)] WARNING: PHOTOVOLTAIC POWER SOURCE PV METER LABELING NOTES 1) LABELS CALLED OUT ACCORDING TO ALL COMMON CONFIGURATIONS. ELECTRICIAN TO DETERMINE EXACT REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND MAKE APPROPRIATE ADJUSTMENTS. 2) LABELING REQUIREMENTS BASED ON THE 2017 & 2020 NEC CODE, OSHA STANDARD 19010.145, ANSIZ535. 3) MATERIAL BASED ON THE REQUIREMENTS OF THE AHJ. 4) LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED AND SHALL NOT BE HANDWRITTEN [NEC 110.21] WET AND UV RESISTANT, RATED FOR 600V 11. 4-WIRE DELTA CONNECTED SYSTEMS HAVE THE PHASE WITH THE HIGHER VOLTAGE TO GROUND MARKED ORANGE OR IDENTIFIED BY OTHER EFFECTIVE MEANS. 12. ALL SOURCE CIRCUITS SHALL HAVE INDIVIDUAL SOURCE CIRCUIT PROTECTION 13. VOLTAGE DROP LIMITED TO 2% FOR DC CIRCUITS AND 3% FOR AC CIRCUITS 14. NEGATIVE GROUNDED SYSTEMS DC CONDUCTORS SHALL BE COLOR CODED AS FOLLOWS: DC POSITIVE- RED (OR MARKED RED), DC NEGATIVE- GREY (OR MARKED GREY) 15. POSITIVE GROUNDED SYSTEMS DC CONDUCTORS COLOR CODED: DC POSITIVE- GREY (OR MARKED GREY), DC NEGATIVE- BLACK (OR MARKED BLACK) 16. AC CONDUCTORS >4AWG COLOR CODED OR MARKED: PHASE A OR L1- BLACK, PHASE B OR L2- RED, PHASE C OR L3- BLUE, NEUTRAL- WHITE/GRAY * USE-2 IS NOT INDOOR RATED BUT PV CABLE IS RATED THWN/THWN-2 AND MAY BE USED INSIDE ** USE-2 IS AVAILABLE AS UV WHITE 17. RIGID CONDUIT, IF INSTALLED, (AND/OR NIPPLES) MUST HAVE A PULL BUSHING TO PROTECT WIRES. 18. IF CONDUIT DETERMINED TO BE RAN THROUGH ATTIC IN FIELD THEN CONDUIT WILL BE EITHER EMT, FMC, OR MC CABLE IF DC CURRENT COMPLYING WITH [NEC 690.31], [NEC 250.118(10)]. DISCONNECTING MEANS SHALL COMPLY WITH [NEC 690.13] AND [NEC 690.15]. 19. CONDUIT RAN THROUGH ATTIC WILL BE AT LEAST 18" BELOW ROOF SURFACE COMPLYING WITH [NEC 230.6(4)] AND SECURED NO GREATER THAN 6' APART PER [NEC 330.30(B)]. 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. CUSTOMER INFORMATION: Al Taliaferro 1120 Keeneland Ct Carmel, Indiana 46280 DC SYSTEM SIZE: 10.4 kW DC DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: REVISION: PAGE NUMBER: Enphase Energy February 26, 2022 473955 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 ELEC CALCS PV6 L1 N (E) LOADS N G PV AC DISCONNECT FUSED, AIC 10kA LOCKABLE, VISIBLE OPEN 60A, 240V, 2-POLE L1 L2 N EGC 40A FUSES INTERCONNECTION NOTES 705.11 AN ELECTRIC POWER PRODUCTION SOURCE, WHERE CONNECTED TO THE SUPPLY SIDE OF THE SERVICE DISCONNECTING MEANS AS PERMITTED IN 230.82(6), SHALL COMPLY WITH 705.11 (A) THROUGH (E). 16 15 (N) 6 AWG SOLID COPPER GEC TO BE IRREVERSIBLE SPLICED TO (E) GEC TO COMPLY WITH NEC 250.64(D)(1) 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. CUSTOMER INFORMATION: Al Taliaferro 1120 Keeneland Ct Carmel, Indiana 46280 DC SYSTEM SIZE: 10.4 kW DC DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: REVISION: PAGE NUMBER: Enphase Energy February 26, 2022 473955 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 ELECTRICAL PV5 UNIRAC SFM TRIMRAIL 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. CUSTOMER INFORMATION: Al Taliaferro 1120 Keeneland Ct Carmel, Indiana 46280 DC SYSTEM SIZE: 10.4 kW DC DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: REVISION: PAGE NUMBER: Enphase Energy February 26, 2022 473955 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 STRUCTURAL PV4 STRUCTURAL INFORMATION: ROOF TYPE (1): ROOF TYPE: Comp Shingle SHEATHING TYPE: OSB FRAMING TYPE: Manufactured Truss FRAMING SIZE: 2x4 @ 24" OC CEILING JOIST SIZE: 2x4 @ 24" OC STANDOFF: SFM Infinity Switchblade Flashkit RACKING: Unirac SFM Infinity @ 48" OC Portrait / 72" OC Landscape NUMBER OF ATTACHMENTS: 44 PV MODULE COUNT: 26 Modules TOTAL ARRAY AREA: 455.3 ft² (17.51ft²/panel) TOTAL ROOF AREA: 2599.03 ft² ARRAY/ROOF AREA: 17.5% ARRAY WEIGHT: 1,300 lbs (50 lbs/panel) DISTRIBUTED LOAD: 2.86 lbs/ft² POINT LOAD: 29.55 lbs/attachment STRUCTURAL NOTES: ---- Manufactured Truss @24" O.C *NOTE: LISTED NUMBER OF ATTACHMENT POINTS ARE AN ESTIMATE ONLY AND MAY VARY BASED ON FIELD CONDITIONS. MAXIMUM ATTACHMENT SPACING TO BE FOLLOWED PER ENGINEER OF RECORD SPECIFICATIONS. Sealed For Existing Roof & Attachment Only 3/1/2022 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. CUSTOMER INFORMATION: Al Taliaferro 1120 Keeneland Ct Carmel, Indiana 46280 DC SYSTEM SIZE: 10.4 kW DC DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: REVISION: PAGE NUMBER: Enphase Energy February 26, 2022 473955 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 ROOF PLAN PV3 DC SYSTEM SIZE: 10.4 kW DC MODULE: (REC Solar REC400AA Pure) INVERTER(S): Enphase Energy IQ7PLUS-72-2-US SCALE: 1/8" = 1'-0" M MSP AC CB LC SUB PV TS MAIN SERVICE PANEL UTILITY METER AC DISCONNECT COMBINER BOX LOAD CENTER SUBPANEL PV METER TRANSFER SWITCH JUNCTION BOX LEGEND FIRE SETBACK TRENCHING PROPERTY LINE FRONT OF HOME MP1 # OF MODULES: 21 AZIMUTH: 203 PITCH: 30 TSRF: 95% AREA: 585.82 ft.² MP2 # OF MODULES: 5 AZIMUTH: 203 PITCH: 30 TSRF: 88% AREA: 332.43 ft.² CHIMNEY POINT OF INTERCONNECTION UNDERGROUND SERVICE LINE 3' 1'-6" 3' 1'-6" 1'-6" ANTENNA Sealed For Existing Roof & Attachment Only 3/1/2022 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. CUSTOMER INFORMATION: Al Taliaferro 1120 Keeneland Ct Carmel, Indiana 46280 DC SYSTEM SIZE: 10.4 kW DC DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: REVISION: PAGE NUMBER: Enphase Energy February 26, 2022 473955 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SITE PLAN PV2 SCALE: 1/16" = 1'-0" ---- M MSP AC CB LC SUB PV TS MAIN SERVICE PANEL UTILITY METER AC DISCONNECT COMBINER BOX LOAD CENTER SUBPANEL PV METER TRANSFER SWITCH JUNCTION BOX LEGEND FIRE SETBACK TRENCHING PROPERTY LINE FRONT OF HOME 1120 Keeneland Ct Sealed For Existing Roof & Attachment Only 3/1/2022 PV5 - ELECTRICAL 3-LINE DIAGRAM PV6 - ELECTRICAL CALCULATIONS PV7 - WARNING LABELS AND LOCATIONS (ALL OTHER SHEETS AS REQUIRED) SS - PRODUCT SPEC. SHEETS UTILITY COMPANY: Duke Energy IN PERMIT ISSUER: City of Carmel PROJECT INFORMATION: NUMBER OF STORIES: 2 CONDUIT RUN: Interior ECOBEE QTY: 1 LIGHT BULB QTY: 0 PV METER: Not Required ROOF TYPE (1) INFORMATION: ROOF TYPE: Comp Shingle FRAMING TYPE: Manufactured Truss SHEATHING TYPE: OSB STANDOFF: SFM Infinity Switchblade Flashkit RACKING: Unirac SFM Infinity @ 48" OC Portrait / 72" OC Landscape NUMBER OF ATTACHMENTS: 44 ROOF TYPE (2) INFORMATION (IF APPLICABLE): *SEE PV4.2 SCOPE OF WORK INSTALLATION OF UTILITY INTERACTIVE PHOTOVOLTAIC SOLAR SYSTEM AND ANY NECESSARY ADDITIONAL WORK NEEDED FOR INSTALLATION. SYSTEM TO BE INSTALLED INFORMATION: SYSTEM SIZE: 10.4 kW DC MODULE TYPE: (26) REC Solar REC400AA Pure INVERTER TYPE: Enphase Energy IQ7PLUS-72-2-US MONITORING: Enphase IQ Combiner 3 X-IQ-AM1-240-3 Sealed For Existing Roof & Attachment Only 3/1/2022 Digitally signed by John A. Calvert Date: 2022.03.01 09:39:08 -07'00'