HomeMy WebLinkAboutIMG_021710701 N. College Avenue Suite A Indianapolis, Indiana 46280 phone 31 r-b44-UZUU tax 31 i-n44-azua www.ula u.u.
Residential SANITARY SEWER PERMIT 999913514
Permit Type Final Subdivision
Project WO ENG10212006 Section Number
Project Name 96th Street Interceptor Lot Number
Project Developer CTRWD Address Number
Lift Station 08 Laurelwood Station Address 2
Treatment Plant MIX Street
Parcel Acreage 9.05 City
EDU in Gallons 310 Zip Code
County
Local Sewer Charge - District Contribution
0.00
Builder
Plan Review and Inspection
0.00
Phone Number
Application Fee
150.00
EDU Fee
1908.00
Owner
Interceptor Fee
12225.00
Phone Number
Other Fees
0.00
Fees Due
14283.00
Occupant
Invoice Number
Phone Number
10207
Ditch Road
Carmel
46032
Hamilton
Bharat & Anju Patel (Owner)
PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see
reverse) and any conditions noted below. All installations shall be inspected by TdCo personnel during "open trench"
phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other
sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no
liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are
extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be
responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and
the like; caused by construction activity on the building site which is the subject of this permit.
Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in
advance. All new construction will be placed on billing two months after connection has been made or when water is
connected, whichever comes first.
IThe building has:
Grease Trap
Grease Interceptor
Slab Foundation
Crawl Space
Main ID: SLI2-SLI1
Manhole IDs USMH SLI-2 SLI-1 DSMH
Grit Interceptor Basement YES Lid Elevation 843.96 831.05
Grinder Station First Floor Elevation 841.00 -- — 841.00-- --- —--
Water Service Basement Elevation 825.83 825.83
Calculation is based on both Manhole Lid Elevations and the elevation of the First Floor -2.96 _ 9.95 Ft.
°er Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by: Gravity/Ejector Pump
TriCo currently requires that an I&I inspection is performed and a Certificate of Compliance is issued prior to occupancy /
sale of a properrty. Please review attached 1/1 Permit.
Manholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner.
'i oitv'� The proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer main to structure.
-he terms of the conditional permit, If any, are listed below.
Plans have been submitted.
All fees have been paid.
A certificate of insurance with the district named as certificate holder is required.
RECORDED AGREEMENT
A MANHOLE CORE PERMIT IS REQUIRED PRIOR TO CONSTRUCTION.
The facility is not classified as a FOG facility.
(Notes)
'�y signing below, I attest that I am fam'liar with the District's specifications and agree to accept responsibility for all work done under this permit.
3uilder / Owner Signaturel ��F Phone Number 85 a 5 ` 7 of & 2
Printed Name k I
Approved By
Engineer
Permit is valid fob ONq-YEAR from the date issued. Permit valid only with
I w
O
@OEZC y