HomeMy WebLinkAboutC060.15 - 6 of 15B7 THERE WILL BE NO RUNOFF CONTROL MEASURES USED IN THIS PROJECT. B8 THE STORM WATER OUTLETS FOR THIS PROJECT ARE ONTO THE SHELF OF THE RETENTION BASIN. NO OUTLETS TO THE POND WILL BE ABOVE THE NORMAL POOL LEVEL. NO SCOUR PROTECTION WILL BE REQUIRED FOR THESE CROWNS BELOW THE NORMAL POOL ONCE THE POND IS ONLINE. THE MAIN OUTLET OF THE POND WILL BE INTO A STORM WATER INLET, WITH THE OVERFLOW BEING SHEET FLOW ON LAND. B9 THERE WILL BE NO GRADE STABILIZATION STRUCTURES USED IN THIS PROJECT. B10 STORMWATER QUALITY MEASURES ARE REQUIRED FOR THIS PROJECT. ALL MEASURES AND DETAILS ARE SHOWN ON SHEETS 17 AND 18. B11 SEASON-APPROPRIATE TEMPORARY SURFACE STABILIZATION METHODS: TEMPORARY SURFACE STABILIZATION SHALL BE DONE IN ACCORDANCE WITH INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT STORM WATER QUALITY MANUAL. ALL DISTURBED AREAS THAT REQUIRE TEMPORARY COVER DURING CONSTRUCTION ACTIVITIES SHALL BE STABILIZED WITH MULCHING ALONE FROM DECEMBER 1 TO MARCH 14 AND FROM JUNE 16 TO AUGUST 31. SPRING MIX SHALL BE USED FROM MARCH 15 THROUGH JUNE 15, AND SHALL BE APPLIED AT THE RATE OF 150 LB/ACRE. SPRING MIX SHALL CONSIST OF OATS. FALL MIX SHALL BE USED FROM SEPTEMBER 1 THROUGH NOVEMBER 30, AND SHALL BE APPLIED AT THE RATE OF 150 LB/ACRE. FALL MIX SHALL CONSIST OF WINTER WHEAT. B12 PERMANENT STABILIZATION METHODS, INCLUDING SEQUENCING INFORMATION, APPLICATION RATES FOR SOIL AMENDMENTS AND SEED MIXTURES, AND THE TYPE AND APPLICATION RATES FOR SOIL AMENDMENT AND ANCHORED MULCH ARE INCLUDED IN THE SPECIFICATIONS. B13 MATERIAL HANDLING AND SPILL PREVENTION PLAN: PURPOSE: THE INTENTION OF THIS SPILL PREVENTION, CONTROL AND COUNTERMEASURES PLAN (SPCCP) IS TO ESTABLISH THE PROCEDURES AND EQUIPMENT REQUIRED TO PREVENT THEIR DISCHARGE TO STORMWATER. THE PLAN ALSO ESTABLISHES THE ACTIVITIES REQUIRED SHOULD SUCH OCCUR. DEFINITIONS: POLLUTANT MEANS POLLUTANT OF ANY KIND OR IN ANY FORM, INCLUDING BUT NOT LIMITED TO: SEDIMENT, PAINT, CLEANING AGENTS, CONCRETE WASHOUT, PESTICIDES, NUTRIENTS, TRASH WITH WASTE OTHER THAN DREDGED SOIL. DISCHARGE: INCLUDES BUT IS NOT LIMITED TO: ANY SPILLING, LEAKING, PUMPING, POURING, EMITTING, EMPTYING, OR DUMPING. PLAN REVIEW AND AMENDMENTS: THIS PLAN SHALL BE REVIEWED AND/OR AMENDED, IF NECESSARY, WHENEVER THERE IS A CHANGE IN THE DESIGN OF THE SITE, CONSTRUCTION, OPERATION, OR MAINTENANCE WHICH MATERIALLY AFFECTS THE SITE'S POTENTIAL FOR THE DISCHARGE OF REGULATED MATERIAL. PREDICTION OF POTENTIAL SPILLS: 1. DRAINAGE SYSTEM: ALL RUNOFF ON THE PROJECT IS OVER LAND FLOW 2. POSSIBLE SPILL SOURCES (DURING AND POST CONSTRUCTION): VEHICULAR SOURCES SUCH AS LEAKING FUEL OR OIL, BRAKE FLUID, GREASE, ANTIFREEZE, CONSTRUCTION TRASH AND DEBRIS, BIOLOGICAL AGENTS FOUND IN TRASH AND DEBRIS, FERTILIZERS, HOUSEHOLD ITEMS INCLUDING BUT NOT LIMITED TO: CLEANING AGENTS, CHEMICALS, PAINT, HERBICIDES AND PESTICIDES. 3. GROUNDWATER CONTAMINATION: THE FACILITY MAINTAINS NO ABOVE GROUND OR UNDER GROUND STORAGE TANKS ON THIS SITE. THEREFORE, IT IS FELT THERE IS LITTLE OR NO POSSIBILITY OF POST CONSTRUCTION GROUNDWATER CONTAMINATION. ALERT PROCEDURES FOR SPILLS: 1. ANY PERSONNEL OBSERVING A SPILL WILL IMMEDIATELY INITIATE THE FOLLOWING PROCEDURE: CONTAIN AND/OR STOP THE SOURCE OF THE SPILL. 2. DIAL 911 FROM ANY TELEPHONE AND NOTIFY THE APPROPRIATE EMERGENCY PERSONNEL. 3. THE CONTRACTORS DESIGNATED EMERGENCY COORDINATOR WILL THEN TAKE THE FOLLOWING ACTIONS: BARRICADE THE AREA, ALLOW NO VEHICLES TO ENTER OR LEAVE THE SPILL ZONE AND CONTAIN THE SPILL. NOTIFY THE INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT, OFFICE OF EMERGENCY RESPONSE (IDEM-OER) BY CALLING EITHER OF THE FOLLOWING TELEPHONE NUMBERS: OFFICE 1-317-233-7745 TOLL FREE 1-800-233-7745 NOTIFY WASTE RECOVERY CONTRACTOR, MAINTENANCE PERSONNEL OR OTHER CONTRACTUAL PERSONNEL NECESSARY FOR CLEANUP. COORDINATE AND MONITOR CLEANUP UNTIL THE SITUATION HAS BEEN STABILIZED AND SPILLS HAVE BEEN ELIMINATED. COOPERATE WITH THE IDEM-OER ON PROCEDURE AND REPORTS INVOLVED WITH THE EVENT. CLEANUP PARAMETERS: 1. THE CONTRACTOR SHALL MAINTAIN LISTS OF READILY AVAILABLE PERSONNEL, VAC-TRUCKS, TANK PUMPERS AND OTHER EQUIPMENT READILY ACCESSIBLE FOR CLEAN-UP OPERATIONS. IN ADDITION, A CONTINUALLY UPDATED LIST OF AVAILABLE ABSORBENT MATERIALS AND CLEAN-UP SUPPLIES SHALL BE KEPT ON SITE. 2. ALL CONSTRUCTION PERSONNEL WILL BE MADE AWARE OF TECHNIQUES FOR PREVENTION OF SPILLS. THEY SHALL BE INFORMED OF THE REQUIREMENTS AND PROCEDURES OUTLINED IN THIS PLAN. THEY SHALL BE KEPT ABREAST OF CURRENT DEVELOPMENTS OR NEW INFORMATION ON THE PREVENTION OF SPILLS AND /OR NECESSARY ALTERATIONS TO THIS PLAN. 3. WHEN SPILLS OCCUR, WHICH COULD ENDANGER HUMAN LIFE, THE RESPONSIBILITY OF PROTECTION AND CLEANUP WILL BE CARRIED OUT BY THE LOCAL POLICE AND FIRE DEPARTMENT. 4. ABSORBENT MATERIALS, WHICH ARE USED IN CLEANING UP SPILLED MATERIALS, WILL BE DISPOSED OF IN A MANNER SUBJECT TO THE APPROVAL OF THE INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT. 5. FLUSHING OF SPILLED MATERIAL WITH WATER WILL NOT BE PERMITTED UNLESS SO AUTHORIZED BY THE INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT. B14 ALL PROPOSED POLLUTION PREVENTION MEASURES SHALL BE INSPECTED FOR DEFICIENCIES BY A TRAINED PROFESSIONAL AT LEAST WEEKLY, AND AGAIN AFTER EACH 1 2" OR GREATER RAIN EVENT. INSPECTION REPORTS MUST BE SIGNED AND DATED AND KEPT ON FILE. AT COMPLETION OF PROJECT, INSPECTION REPORTS MUST BE SUBMITTED TO THE OWNER. FOLLOWING GUIDELINES SHALL BE FOLLOWED FOR MAINTAINING THE FOLLOWING POLLUTION PREVENTION MEASURES: PERIMETER PROTECTION 1. IF PERIMETER PROTECTION BECOMES BREACHED, STARTS TO DECOMPOSE, OR IN ANY WAY BECOME INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. PLAN ELEMENTS - CONSTRUCTION PLANS A1 PLAN INDEX PROVIDED BELOW. A2 EXISTING CONDITIONS ARE SHOWN ON SHEET 01. A3 THIS PROJECT CONSISTS OF THE CONSTRUCTION OF A PRIVATE RESIDENCE, POND, AND BERMS AT 10155 DITCH ROAD. A4 VICINITY MAP IS SHOWN ON SHEET 01. A5 THE LATITUDE AND LONGITUDE OF THE SITE IS AS FOLLOWS: LAT. 39° 56' 39.9" N LON. 86° 07' 00.3" W A6 THE LOCATION OF ALL PROPOSED SITE IMPROVEMENTS CAN BE FOUND ON PLAN SHEETS 2-7. A7 14-DIGIT HYDROLOGIC UNIT CODE: 05120201090040. A8 AN IDEM RULE 5 PERMIT IS THE ONLY APPLICABLE STATE PERMIT FOR THIS PROJECT. A9 RUNOFF FROM THE PROJECT AREA DISCHARGES INTO AN OPEN CUT DITCH THAT RUNS THROUGH THE COURSE AND INTO THE NEIGHBORHOOD. THIS IS A TRIBUTARY TO THE MOFFITT & WILLIAMSON DRAIN, WHICH ULTIMATELY FLOWS INTO THE WHITE RIVER. NO CHANGE TO RUNOFF OR DRAINAGE PATTERNS IS PROPOSED AS PART OF THIS PROJECT. FLARED END SECTIONS DISCHARGE FLOW INTO THE DITCH. LOCATIONS FOR THE FLARED END SECTIONS ARE LOCATED IN THE PLANS ON SHEETS 2-7. A10 THE PROJECT AREA CONSISTS OF THE WOODLAND COUNTRY CLUB OF CARMEL, WHICH RUNOFF DISCHARGES INTO AN OPEN CUT DITCH THAT RUNS THROUGH THE COURSE AND INTO THE NEIGHBORHOOD. THIS IS A TRIBUTARY TO THE MOFFITT & WILLIAMSON DRAIN, WHICH ULTIMATELY FLOWS INTO THE WHITE RIVER. A11 RECEIVING WATERS: MOFFITT & WILLIAMSON DRAIN, WHITE RIVER. A12 POTENTIAL DISCHARGES TO GROUNDWATER: NONE A13 A FEMA FLOOD MAP DETAILING 100 YR FLOODPLAINS, FLOODWAYS, AND FLOODWAY FRINGES CAN BE FOUND ON SHEET 11. THERE IS NO WORK EXPECTED IN A FLOOD ZONE. A14 PRE-CONSTRUCTION AND POST CONSTRUCTION ESTIMATE OF PEAK DISCHARGES ARE AS FOLLOWS: PRE-CONSTRUCTION DISCHARGES Q, 10 YEAR = 75.1 cfs Q, 100 YEAR = 162.5 cfs POST-CONSTRUCTION DISCHARGES Q, 10 YEAR = 37.2 cfs Q, 100 YEAR = 103. cfs A15 THE LAND USE ADJACENT TO THE PROJECT SITE IS RESIDENTIAL AND PUBLIC RIGHT-OF-WAY. A16 LOCATION AND APPROXIMATE BOUNDARIES OF ALL DISTURBED AREAS ARE IDENTIFIED ON SHEETS 2-7. A17 EXISTING VEGETATIVE COVER IS PRIMARILY GRASS AND IS SHOWN ON SHEETS 2-7. A18 A SOILS MAP FROM THE NRCS DEPICTING SOIL TYPES FOR THE PROJECT SITE CAN BE FOUND ON SHEET 13. A19 PLAN OF PROPOSED DRAINAGE IMPROVEMENTS ARE SHOWN ON SHEETS 2-7. DETAILS OF PROPOSED DRAINAGE IMPROVEMNETS INCLUDING HYBRID DITCH DETAILS ARE INCLUDED ON SHEETS 8 AND 9. A20 THERE ARE NO OFF-SITE CONSTRUCTION ACTIVITIES ASSOCIATED WITH THIS PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL HAULING AND MATERIAL STORAGE NEEDED FOR THE PROJECT. A21 THE CONTRACTOR SHALL PHASE CONSTRUCTION OPERATIONS SO THAT ALL SOIL REMOVED IS EITHER USED AS BACKFILL OR REMOVED FROM THE SITE PRIOR TO ENDING CONSTRUCTION OPERATIONS FOR THAT DAY. A22 EXISTING SITE TOPOGRAPHY IS SHOWN ON PLAN SHEETS 2-7. A23 FINAL TOPOGRAPHY WILL MATCH EXISTING TOPOGRAPHY AND IS SHOWN ON PLAN SHEETS 2-7. CONSTRUCTION COMPONENTS B1 POTENTIAL POLLUTANT SOURCES: EXPECTED POLLUTANTS TO STORMWATER DURING CONSTRUCTION CAN BE BUT NOT LIMITED TO: EXCESS SEDIMENT, ORGANIC MATERIALS SUCH AS LEAVES AND TWIGS, EXCESS CONCRETE, FUELS, BRAKE DUST, AND TRASH. B2 STORMWATER QUALITY SEQUENCING: PRE-CONSTRUCTION ACTIVITIES: 1. CALL THE INDIANA UNDERGROUND PLANT PROTECTION SYSTEM, INC. ("HOLEY MOLEY") AT 811 TO CHECK THE LOCATION OF ANY EXISTING UTILITIES. THEY SHOULD BE NOTIFIED TWO WORKING DAYS BEFORE CONSTRUCTION TAKES PLACE. 2. ESTABLISH ONSITE LOCATION FOR OWNER/OPERATOR/CONTRACTOR PLACEMENT OF APPROVED PLANS AND EROSION CONTROL MEASURE INSPECTION DOCUMENTS. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSPECTING THE SURROUNDING STREETS ON A DAILY BASIS TO ENSURE THAT VISIBLE CONSTRUCTION POLLUTANTS ARE NOT PRESENT. IF CONSTRUCTION POLLUTANTS ARE PRESENT, THE CONTRACTOR SHALL REMOVE THEM IMMEDIATELY. CONSTRUCTION ACTIVITIES: 1. INSTALL APPROPRIATE PERIMETER PROTECTION AND INLET PROTECTION WHILE WORK IS BEING PERFORMED IN THE AREA. CREATE STAGING AREA FOR MATERIALS. STOCKPILE AREA WILL NEED TO HAVE APPROPRIATE EROSION CONTROL PRIOR TO CREATION. THESE EROSION CONTROL MEASURES ARE TO BE INSTALLED AS INDICATED ON PLAN SHEET 7 OF 18 (POND 10 ONLY). 2. POND CONSTRUCTION TO OCCUR. EXCAVATED POND WILL ACT AS SEDIMENT CONTROL DURING THE MASS GRADING PROCESS. 3. RESTORATION TO OCCUR FOR POND AND AREAS SHEET FLOWING TO THE POND. EROSION CONTROL ITEMS TO BE INSTALLED SUCH AS EROSION CONTROL BLANKET AND TEMPORARY SEEDING. DEWARTERING WILL OCCUR AT THIS TIME 4. CONTRACTOR TO REMOVE COLLECTED SEDIMENT FROM POND BOTTOM PRIOR TO ENERGIZING POND. 5. OUTLET TO BE PUT ONLINE BEFORE THE RETENTION BASIN IS ENERGIZED. INSTALL INLET PROTECTION. 6. ENERGIZE RETENTION BASIN. 7. ONCE ALL PERMANENT SURFACE STABILIZATION IS ESTABLISHED, TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED. B3 THE PROJECT IS THROUGHOUT THE JORDAN WOODS NEIGHBORHOOD, ALONG JORDAN ROAD, TIMBER DRIVE, E. 109TH STREET, E. 110TH STREET, AND E. 111TH STREET. THE CONTRACTOR SHALL MINIMIZE SEDIMENT TRACKING ONTO THE ROADWAY. B4 SEDIMENT CONTROL MEASURES FOR SHEET FLOW AREAS INCLUDE BUT ARE NOT LIMITED TO: PERIMETER PROTECTION AND INLET FILTERS. B5 SEDIMENT CONTROL MEASURES FOR CONCENTRATED FLOW AREAS: LIMITED CONCENTRATED FLOWS FROM DEWATERING FOR EXCAVATIONS WILL OCCUR DURING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MINIMIZING SEDIMENTATION IN THESE CONCENTRATED FLOWS, TYPICALLY AT DEWATERING PUMP DISCHARGES. OTHER SEDIMENT CONTROL PROCEDURES FOR OTHER CONCENTRATED FLOWS, INCLUDING THOSE ASSOCIATED WITH WITH STAGING AREA RUNOFF, SHALL ALSO BE THE RESPONSIBILITY OF THE CONTRACTOR. B6 PROTECTION MEASURES FOR SURFACE INLETS CAN BE FOUND ON PLAN SHEETS 7 OF 18. DETAILS PERTAINING TO THESE EROSION CONTROL MEASURES CAN BE FOUND ON SHEETS 17 AND 18. 2. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE PERIMETER PROTECTION AT ITS LOWEST POINT, OR IS CAUSING THE PERIMETER PROTECTION TO BULGE. 3. TAKE CARE TO AVOID UNDERMINING THE PERIMETER PROTECTION DURING CLEAN OUT. 4. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE AND STABILIZE. TEMPORARY SEEDING 1. INSPECT PERIODICALLY AFTER PLANTING TO SEE THAT VEGETATIVE STANDS ARE ADEQUATELY ESTABLISHED; RE-SEED IF NECESSARY. 2. CHECK FOR EROSION DAMAGE AFTER STORM EVENTS AND REPAIR; RE-SEED AND MULCH IF NECESSARY. 3. TOP-DRESS FALL SEEDED WHEAT SEEDINGS WITH 50 LBS/ACRE OF NITROGEN IN FEBRUARY OR MARCH IF NITROGEN DEFICIENCY IS APPARENT. INLET PROTECTION 1. PLACE GEOTEXTILE FILTER FABRIC BAGS WHEN THEY BECOME THREE QUARTERS FULL, OR WHEN THE SEDIMENT IMPEDES THE PASSAGE OF STORMWATER INTO THE SYSTEM. 2. INLET PROTECTION SHALL BE INSPECTED AND CLEANED AFTER EVERY RAIN EVENT, OR AT LEAST ONCE A WEEK. CONCRETE WASHOUT AREA 1. INSPECT DAILY AND AFTER EACH STORM EVENT. 2. INSPECT THE INTEGRITY OF THE OVERALL STRUCTURE INCLUDING, WHERE APPLICABLE, THE CONTAINMENT SYSTEM. 3. INSPECT THE SYSTEM FOR LEAKS, SPILLS, AND TRACKING OF SOIL BY EQUIPMENT. 4. INSPECT THE POLYETHYLENE LINING FOR FAILURE, INCLUDING TEARS AND PUNCTURES. 5. ONCE CONCRETE WASTE HARDENS, REMOVE AND DISPOSE OF MATERIAL. 6. EXCESS CONCRETE SHOULD BE REMOVED WHEN THE WASHOUT SYSTEM REACHES 50% CAPACITY. 7. THE POLYETHYLENE LINER SHOULD BE REPLACED AFTER THE REMOVAL OF CONCRETE WASTE. B15 DOES NOT APPLY TO THIS PROJECT POST-CONSTRUCTION COMPONENTS C1 THE PROPOSED PROJECT IS A STORM SEWER INSTALLATION. POST CONSTRUCTION POLLUTANT EXPOSURE INCLUDE THOSE PRODUCED BY VEHICULAR TRAFFIC SUCH AS: OIL, GREASE, ANTIFREEZE, BRAKE FLUID, BRAKE DUST, RUBBER FRAGMENTS, DUST, GASOLINE, DIESEL FUEL, AND OTHER METALS AND FRAGMENTS FROM VEHICULAR SOURCES. OTHER POLLUTANTS INCLUDE GRIT (SEDIMENT) FROM WEAR OF THE ROADWAY OR WASHING OFF VEHICLES AND TRASH FROM LITTERING AND IMPROPER DISPOSAL OF WASTE. C2 UNDERDRAINS WILL BE INSTALLED ALONG THE ALIGNMENTS OF HYBRID HITCHES. THE UNDERDRAIN PIPE SIZES RANGE FROM 4" TO 18" AND WILL BE PERFORATED HDPE PIPE THAT WILL SERVE AS A CONVEYANCE ELEMENT AS WELL AS COLLECTION POINT FOR INFILTRATIVE FLOWS. CLEAN STONE AND GEOMEMBRANE WILL BE INSTALLED ALONG THE UNDERDRAINS TO ENHANCE INFILTRATION AND REDUCE PONDING SURFACE WATER. INLETS WILL BE INSTALLED ALONG THE HYBRID DITCH SYSTEM AND ARE GENERALLY CONFIGURED TO PROVIDE MINOR PONDING PRIOR TO OVERTOPINIG INTO INLETS IN ORDER TO FORCE INITIAL FLOWS TO INFILTRATE OR ENCOUNTER MICRO-PONDING PRIOR TO BEING COLLECTED INTO THE STORMSEWER NETWORK. THE CONTRACTOR SHOULD FOLLOW THE GENERAL SEQUENCE BELOW: 1. EROSION AND SEDIMENT CONTROL PRACTICES FOR EACH HYBRID DITCH SECTION WILL NEED TO BE INSTALLED AND MAINTAINED DURING THE COURSE OF CONSTRUCTION. 2. STORMWATER POLLUTION PREVENTION PRACTICES SHOULD BE REVIEWED AND MAINTAINED AS NEEDED TO KEEP THEM EFFECTIVE. SEDIMENT WILL BE REMOVED FROM SEDIMENT CONTROL PRACTICES AND INLETS AFTER THE SITE IS PERMANENTLY STABILIZED. 3. REVIEW ALL DISTURBED AREAS FOR FINAL STABILIZATION. A UNIFORM COVER OF 70% PERENNIAL VEGETATION IS REQUIRED. 4. THE CONTRACTOR WILL REMOVE THE TEMPORARY EROSION OR SEDIMENT CONTROL PRACTICES AS THE VEGETATIVE COVER FOR EACH PRACTICE IS PERMANENTLY STABILIZED. 5. SUBMIT THE NOTICE OF TERMINATION (NOT) C3 POST CONSTRUCTION STORMWATER QUALITY MEASURES: STORMWATER QUALITY MEASURES INCLUDE SEEDING, SODDING, AND MULCHING, ETC. ALL DENUDED AREAS NOT PAVED WILL BE RE-VEGETATED. ALL PAVED AREAS WILL BE KEPT FREE OF LITTER AND DEBRIS. HYBRID DITCHES WILL SERVE AS THE MAIN SOURCE OF POST-CONSTRUCTION STORMWATER QUALITY MEASURES. THE DITCHES WILL COLLECT RUNOFF FROM THE ROADWAY AND FILTER THROUGH THE SOIL TO THE UNDER DRAINS AND ULTIMATELY THE INLETS. SEDIMENT WILL BE FILTERED OUT THROUGH THE RETENTION MEDIA AND OTHER ELEMENTS WILL BE ABSORBED NATURALLY THROUGH THE GRASS AND PLANTS. C4 THE HYBRID DITCHES WILL BE CONSTRUCTED PER THE DETAILS ON SHEETS 8 AND 9. LOCATIONS FOR THE INLETS AND DITCHES CAN BE FOUND IN THE PLANS ON SHEETS 2-7. C5 MAINTENANCE OF THE DITCHES AND INLETS WILL REQUIRE REGULAR CLEANING OF DEBRIS FROM AROUND THE GRATES TO ENSURE WATER CAN FLOW INTO THE STORMWATER SYSTEM. THE CITY OF CARAMEL WILL BE RESPONSIBLE FOR THE MAINTENANCE IN ACCORDANCE WITH CHAPTER 8 OF THE IDEM STORMWATER QUALITY MANUAL. SWPPP NOTES DIRECTORY....F:\2018\18-3943 10209 Ditch Road\30 SheetDrawings\03-Erosion Control\FILE...............3943 SWPPP.dwgDIMSCALE..1 LTSCALE....20PLOTTED BY..JMoweryDATE.............Oct 29,2019 - 12:48pmFOR APPROVAL RECOMMENDED CHECKED: DESIGNED: CHECKED: DRAWN: DESIGN ENGINEER DATE SURVEY BOOK HORIZONTAL SCALE VERTICAL SCALE CONTRACT SHEETS PROJECT of DESIGNATION BRIDGE FILE10155 DITCH ROAD PROJECT HAMILTON COUNTY, INDIANA10/31/2019 15 18-3943 N/A N/A PLANS NOTFORCONSTRUCTIONBASH VSE VSE BASH N/A 06 N/A 04/14/22