HomeMy WebLinkAboutC070.15 - 7 of 15SILT FENCE 1. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 2. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT, OR IS CAUSING THE FABRIC TO BULGE. 3. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 4. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE AND STABILIZE. GENERAL NOTES: 1. THE SILT FENCE SHALL BE PLACED AS CLOSE AS POSSIBLE TO EDGE OF CONSTRUCTION LIMITS OR AS DIRECTED. 2. THE SPACING OF THE TIEBACKS SHALL EQUAL THE SPACING OF POSTS. ADDITIONAL POST DEPTH OR TIEBACKS MAYBE BE REQUIRED IN UNSTABLE SOILS. METAL, SYNTHETIC, OR WOOD POSTS GROUND LINE 6' MAX GEOTEXTILE FABRIC SILT FENCE TIEBACK BETWEEN FENCE POST AT ANCHOR 4" FLOW ANCHOR STAKE MIN. LENGTH 18"COMPACTED SOIL18"MIN.36"18"MIN.NOT TO SCALE EXISTING GRATE PIPE GEOTEXTILE FILTER FABRIC BAG GRATE GEOTEXTILE FILTER FABRIC BAG NOT TO SCALE SILT FENCE NOTES 1. CALL THE INDIANA UNDERGROUND PLANT PROTECTION SYSTEM, INC. ("HOLEY MOLEY") AT 1-800-382-5544 TO CHECK THE LOCATION OF ANY EXISTING UTILITIES. THEY SHOULD BE NOTIFIED TWO WORKING DAYS BEFORE CONSTRUCTION TAKES PLACE. 2. PERIMETER PROTECTION, INLET PROTECTION AND CULVERT PROTECTION SHALL BE INSTALLED PRIOR TO WORK IN THOSE DESIGNATED AREAS. ANY DITCHES THAT ARE DISTURBED DURING INSTALLATION OF THE WASTEWATER FACILITIES SHALL BE REESTABLISHED AND REQUIRE RE-SEEDING AS AN EROSION CONTROL MEASURE. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSPECTING THE SURROUNDING STREETS ON A DAILY BASIS TO ENSURE THAT VISIBLE CONSTRUCTION POLLUTANTS ARE NOT PRESENT. IF CONSTRUCTION POLLUTANTS ARE PRESENT, THE CONTRACTOR SHALL REMOVE THEM IMMEDIATELY. DUST CONTROL MEASURES SHALL BE TAKEN AS NECESSARY TO KEEP AIRBORNE POLLUTANTS FROM LEAVING THE SITE. 4. THE CONTRACTOR SHALL ESTABLISH A CONCRETE WASHOUT LOCATION PRIOR TO ANY CONCRETE OR FLOWABLE FILL PLACEMENT. 5. THE TOP 1 FOOT OF TOPSOIL ON AGRICULTURAL AREAS SHALL BE REMOVED AND STOCKPILED DURING CONSTRUCTION. THE STOCKPILE SHALL BE PROTECTED FROM EROSION USING BURLAP, TARPING, ETC. AFTER WASTEWATER FACILITIES HAS BEEN INSTALLED AND BACKFILLED, THE NATIVE TOPSOIL SHALL BE REPLACED. 6. ONCE ALL PERMANENT SURFACE STABILIZATION IS ESTABLISHED, TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED.36" (MIN.)30" (MIN.)8' TREATED 4"X4" POST 24"x36"x3/4" PLYWOOD WOOD OR METAL STAKES TO SECURE THE STRAW BALES (2 PER STRAW BALE) METAL PINS OR STAPLES TO SECURE THE POLYETHYLENE LINING TO THE STRAW BALES POLYETHYLENE LINING (10 MILLIMETERS); THE LINING SHOULD EXTEND OVER THE STRAW BALES. POLYETHYLENE LINING (10 MILLIMETERS); THE LINING SHOULD EXTEND OVER THE STRAW BALES. STRAW BALES ENTRENCHED 4 INCHES INTO THE SOIL12' MIN.15' MIN. CONCRETE WASHOUT AREA PLAN VIEW I C-10 I C-10 SECTION I C-10NO SCALE A C-10 SIGN SIGN DETAIL A C-10NO SCALE METAL PINS OR STAPLES TO SECURE THE POLYETHYLENE LINING TO THE STRAW BALES. NOTE: CONTRACTOR SHALL CLEAN ALL HAUL ROADS DAILY. PAINT PLYWOOD FACE WHITE 4" (MIN.) STENCILED LETTERS PAINTED BLACK CULVERT PIPE PROTECTION NOT TO SCALE SEEDING SCHEDULE CULVERT PIPE PROTECTION/INLET PROTECTION 1. INSPECT THE DROP INLET PROTECTION AFTER EACH STORM EVENT, AND REPAIR DAMAGE IMMEDIATELY. 2. REMOVE SEDIMENT FROM THE POOL AREA TO ENSURE ADEQUATE RUNOFF STORAGE FOR THE NEXT RAIN. 3. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL CONSTRUCTION MATERIALS, AND SEDIMENT AND DISPOSE OF PROPERLY, GRADE THE DISTURBED AREA TO ELEVATION AND STABILIZE. TEMPORARY CONSTRUCTION ENTRANCE DETAIL GEOTEXTILE FABRIC TO STABILIZE FOUNDATION (ESPECIALLY IMPORTANT WHERE WETNESS IS ANTICIPATED) 2"-3" COARSE AGGREGATE NOT TO SCALE SWPPP DETAILS DIRECTORY....F:\2018\18-3943 10209 Ditch Road\30 SheetDrawings\03-Erosion Control\FILE...............3943 SWPPP.dwgDIMSCALE..1 LTSCALE....20PLOTTED BY..JMoweryDATE.............Oct 29,2019 - 12:48pmFOR APPROVAL RECOMMENDED CHECKED: DESIGNED: CHECKED: DRAWN: DESIGN ENGINEER DATE SURVEY BOOK HORIZONTAL SCALE VERTICAL SCALE CONTRACT SHEETS PROJECT of DESIGNATION BRIDGE FILE10155 DITCH ROAD PROJECT HAMILTON COUNTY, INDIANA10/31/2019 15 18-3943 N/A N/A PLANS NOT FORCONSTRUCTIONBASH VSE VSE BASH FLOW ELEVATION ENBEDMENT DETAIL TIEBACK DETAIL 20' (MIN) 50' (MIN) PUBLI C R O A D INLET PROTECTION ELEVATION VIEWPLAN VIEW AREA AT ZERO PERCENT GRADE INDOT CA NO.5 AGGREGATE FLOW INDOT REVETMENT RIPRAP STRAW BALE (ALTERNATE MATERIALS OR PRODUCTS MAY BE USED TO PROVIDE STRUCTURAL CONTAINMENT. ALTERNATIVE MATERIALS OR PRODUCTS WILL REQUIRE DESIGN MODIFICATION. COMPACTED SOIL MATERIAL N/A 07 N/A OVERLAP DETAIL SILT FENCE POST SEDIMENT FILTER ROLL DETAIL 1" = 1'-0" MIN. DIA. = 9 INCHES * * (12 INCHES WHEN USED AS DITCH CHECK) 04/14/22