Loading...
HomeMy WebLinkAboutA003_POOL EQUIPMENT BUILDINGA003POOLEQUIPMENTBUILDING ARCHITECT CLIENT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20010 APRIL 23, 2021THE SIGNATURECARMELCARMEL, INPERMIT SET ENGINEER07 A003 SCALE: 05 POOL BUILDING FRONT ELEVATION 3/8" = 1'-0" SCALE: 06 POOL BUILDING REAR ELEVATION 3/8" = 1'-0" SCALE: 03 POOL BUILDING SIDE ELEVATION 3/8" = 1'-0" SCALE: 04 POOL BUILDING SIDE ELEVATION 3/8" = 1'-0" SCALE: 01 POOL BUILDING FLOOR PLAN 3/8" = 1'-0" SCALE: 07 ELEVATION DETAIL 1/4" = 1'-0" FINISH FLOOR EL: 0'-0" FINISH FLOOR EL: 0'-0" FIRST FLOOR EL: 0'-0" FINISH FLOOR EL: 0'-0" 07 A003 FIRST FLOOR EL: 0'-0" ROOF PLATE EL: 10'-0" WM3 FC1aRW3ROOF PLATE EL: 10'-0" SCALE: 02 POOL BUILDING ROOF PLAN 1/4" = 1'-0" ROOF PLATE EL: 8'-0" ROOF PLATE EL: 0'-0" ROOF PLATE EL: 8'-0" 22'-3 12" 19'-738"11'-1178"2'-8 18" 8'-738"3'-1178" 3'-378" 6'-438" 22'-312" 2'-738"6'-438" 3'-0 18"11'-1178"3"x4" METAL DOWNSPOUT 5" MTL. GUTTER 5" MTL. GUTTER CONTINUOUS RIDGE VENT 3"x4" METAL DOWNSPOUT WM3 WM3WM3 WM3WM3 1'-10" 03 A003 04 A003 1'-10"PERFORATED SOFFIT PANEL FACE OF CMU BELOW ASPHALT SHINGLESASPHALT SHINGLES ASPHALT SHINGLES ASPHALT SHINGLES FIBER CEMENT TRIMFIBER CEMENT TRIM FIBER CEMENT TRIM FIBER CEMENT TRIM DOWNSPOUT DOWNSPOUT 06 A003 05 A003 03 A003 04 A003 06 A003 05 A003 04/15/22