Loading...
HomeMy WebLinkAboutA106_ROOF PLANA106 ARCHITECT CLIENT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20010 APRIL 23, 2021THE SIGNATURECARMELCARMEL, INPERMIT SET ENGINEERROOF PLAN1 A201 1 A201 SCALE: 01 ROOF PLAN 1/32" = 1'-0" NORTH 02 A201 01 A201 04 A201 03 A201 01/02 A20702 A204 GENERAL NOTES 1. THE GENERAL CONTRACTOR SHALL VERIFY ALL CONDITIONS AT THE JOBSITE. NOTIFY ARCHITECT OF ANY DEVIATIONS FROM THOSE CONDITIONS AS THEY ARE NOTED ON THE DRAWINGS. 2. THE GENERAL CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK WITH THE OWNER. 3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL STATE AND LOCAL BUILDING CODES AND GOVERNMENT REGULATORY AGENCIES. 4. THE GENERAL CONTRACTOR IS TO SUBMIT SHOP DRAWINGS-PROJECT DATA AND SAMPLES TO OWNER/ARCHITECT FOR APPROVAL PRIOR TO FABRICATION OF ALL MILLWORK AND WALL FINISHES. 5. DO NOT SCALE ANY DRAWING. ANY DIMENSIONS ARE TO BE OBTAINED FROM THE ARCHITECT IF NOT NOTED ON THE DRAWINGS. REFER ALL QUESTIONS TO THE ARCHITECT OR ENGINEER ON RECORD. 6. ALL DIMENSIONS ARE TO C.L. OF DEMISING WALL OF UNITS AND FACE OF FRAMING. 7. THE GENERAL CONTRACTOR SHALL KEEP ONE SET OF PLANS AT THE JOBSITE FOR THE SPECIFIC PURPOSE OF RECORDING ACTUAL CONSTRUCTION CONDITIONS. SUCH PROJECT RECORD-DOCUMENTS SHALL BE PROVIDED TO THE OWNER UPON COMPLETION OF THE PROJECT. 8. THE GENERAL CONTRACTOR SHALL VERIFY SIZE, LOCATION, AND CHARACTERISTICS OF ALL WORKS AND EQUIPMENT SUPPLIED BY THE OWNER OR OTHERS WITH THE MANUFACTURER OR SUPPLIER PRIOR TO THE START OF THE WORK. 9. THE GENERAL CONTRACTOR SHALL SEE THAT ALL SUBCONTRACTORS RECEIVE COMPLETE WORKING DRAWINGS AND ASSUME FULL RESPONSIBILITY FOR COORDINATION OF WORK. 10. PRIMARY ENTRANCE DOOR NUMBERS CORRESPOND TO ROOM NUMBERS OR UNIT NUMBERS. 5" METAL GUTTER1 3" X 4" METAL DOWNSPOUT2 CONTINUOUS RIDGE VENT3 DASHED LINE AT PERIMETER REPRESENTS WALL BELOW4 DRAFTSTOP SHALL BE PROVIDED IN ROOF/CEILING SPACE PER SECTION 718. 5 ROOF DRAINS6 ROOF PLAN KEY NOTES THROUGH WALL SCUPPER WITH COLLECTION BOX AND 3" X 4" METAL DOWNSPOUT 7 AREA OF TAPERED INSULATION TO ACHIEVE POSITIVE DRAINAGE8 04/15/22