HomeMy WebLinkAboutE601GENERAL PANEL
SCHEDULE NOTES
1. VERIFY REQUIRED K.A.I.C. RATING BEFORE PURCHASE
AND INSTALL OF ELECTRICAL EQUIPMENT
2. CONFIRM BREAKER SIZES AND CIRCUITS REQUIRED FOR
MECHANICAL EQUIPMENT WITH MECHANICAL CONTRACTOR.
3. CONFIRM BREAKER SIZES AND CIRCUITS REQUIRED FOR
ELEVATOR EQUIPMENT WITH ELEVATOR CONTRACTOR.ARCHITECT CLIENT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS2OO1O
april 23, 2o21THE SIGNATURECARMELCARMEL, INpermit SET ENGINEERELECTRICAL PANELSCHEDULESE6O1
04/15/22