Loading...
HomeMy WebLinkAboutP101-C - LEVEL 01 OVERHEAD SANITARY - AREA CUP UP UP UPS A1 A1 A1 A1 A1 A1 A1 A1 A1A1A1 A1 A1 A1 A1 A1 A1A1B4A12A12UNIT A1 SEE DETAIL ON P200 UNIT A1 SEE DETAIL ON P200 UNIT A1 SEE DETAIL ON P200 UNIT A1 SEE DETAIL ON P200 UNIT A12 SEE DETAIL ON P201 UNIT B4 SEE DETAIL ON P202 UNIT A1 SEE DETAIL ON P200 UNIT A1 SEE DETAIL ON P200 UNIT A1 SEE DETAIL ON P200 UNIT A1 SEE DETAIL ON P200 UNIT A1 SEE DETAIL ON P200 UNIT A1 SEE DETAIL ON P200 UNIT A1 SEE DETAIL ON P200 2 2 3 3 4 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 3 6"ø 4"ø 4"ø 4"ø 6"ø 4"ø FD-2 FD-2 FD-2 FD-1 FD-2 FD-3 FD-2 FD-2 FD-2 FD-2 2 3 4 MOORE ENGINEERING SERVICES, INC. 6340 LaPas Trail Indianapolis, IN 46268 Phone (317) 291-1052 FAX (317) 298-2729R I G EEIS PE60860351 No.REENIGNELANOISSEFORPDOUGLAS.R MOO RET R NNDIA A STATE OF DE NOTE OVER-HEAD PLUMBING SHOWN IN THIS VIEW SANITARY STACK NOTES 4 OSD STACK 2 WASHER STACK 3 KITCHEN ISLAND STACK 1 BATHROOM GROUP STACK ARCHITECT CLIENT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20010THE SIGNATURECARMELCARMEL, INENGINEERE D C B A 5 KITCHEN WALL STACK P101-CLEVEL 01 OVERHEADSANITARY - AREA C PERMIT SET 04.23.2021 1/8" = 1'-0"1 Level 01 Overhead Sanitary - Area C 04/15/22