Loading...
HomeMy WebLinkAboutA161 - ELEVATOR PLANS AND DETAILSBOTTOM OF PIT EL. -3'-4" A.F.F. LOWER LEVEL EL. -10'-8" SECOND FLOOR EL: +10'-8" THIRD FLOOR EL. +21'-4" PLATE BEARING EL. +41'-1" T/O CMU EL. +46'-4" FIRST FLOOR EL: +0'-0" FOURTH FLOOR EL. +32'-0" BOTTOM OF PIT EL. -3'-4" A.F.F. SECOND FLOOR EL: +10'-8" THIRD FLOOR EL. +21'-4" PLATE BEARING EL. +41'-1" T/O CMU EL. +46'-4" FIRST FLOOR EL: +0'-0" FOURTH FLOOR EL. +32'-0" BOTTOM OF PIT EL. -3'-4" A.F.F. FIRST FLOOR EL: +0'-0" SECOND FLOOR EL. +14'-0" PLATE BEARING EL. +33'-9" T/O CMU EL. +39'-0" LOWER LEVEL EL: -10'-8" THIRD FLOOR EL. +24'-8" A161ELEVATOR PLANSAND DETAILSSCALE: 01 LOWER LEVEL PLAN ELEVATOR 1/4" = 1'-0" SCALE: 04 ELEVATOR SECTION BUILDING B 1/4" = 1'-0"7'-0" 7'-0" 7'-0" 7 A161 HOISTWAY BEAM SIZE AND PLACEMENT AS REQUIRED BY ELEVATOR PROVIDED AND INSTALLED BY G.C.12'-8"13'-578"1'-7" ALIGN TOP RUNG WITH FINISH FLOOR STL. LADDER: 1 2"x4" FLAT BARS 16" APART ATTACHED TO WALL W/(3) 2"x7"x3 8" STL. ANGLES 1 2" RUNGS @ 12" O.C. SUMP PIT, REFERENCE STRUCTURAL DWGS. FOR ADDITIONAL INFO. SEE STRUCTURAL FOR WATERPROOFING EXTENTS PASSENGER ELEVATOR BASIS OF DESIGN SCHINDLER 3300 TRACTION ELEVATOR 3500 LBS, 100 FPM FRONT OPENINGS - CENTERED SCALE: 07 SECTION DETAIL 1/4" = 1'-0" ROOFING MEMBRANE FLASHING ON FINISHED METAL COPING/GRAVEL STOP EXTEND ROOFING MEMBRANE UNDER MTL. COPING AND DOWN FACE OF SHEATHING 4" MIN. PRE-FINISHED METAL COPING/GRAVEL STOP WOOD BLOCKING AS REQUIRED ROOFING MEMBRANE TO EXTEND UP AND OVER ELEVATOR WALLS EXTEND WEATHER BARRIER DOWN TO MEET ROOF SHEATHING PROVIDE CONTINUOUS SEALANT AT ENTIRE PERIMETER WG3A WC1R3F3 F2a F1 R4R3R4R3F3 F2a F1 PROVIDE INSULATION IN ATTIC SPACE UP SIDE OF ELEVATOR WALL 5'-0"SCALE: 02 SECOND FLOOR PLAN ELEVATOR 1/4" = 1'-0" SCALE: 03 THIRD FLOOR PLAN ELEVATOR 1/4" = 1'-0" WC1 4 A191 WC1 WC1 75 8" 8'-6" 75 8" WC17'-10" 758" 8'-6"75 8" 75 8"1"TYP.758" ARCHITECTCLIENT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 # DESCRIPTION DATENORTH ENDMULTIFAMILYCARMEL, INDIANABID DOCUMENTS GC/CM 7'-0" 7'-0"SCALE: 05 ELEVATOR SECTION BUILDING C 1/4" = 1'-0"7'-0" 7'-0" 7 A161 HOISTWAY BEAM SIZE AND PLACEMENT AS REQUIRED BY ELEVATOR PROVIDED AND INSTALLED BY G.C.12'-8"13'-578"1'-7" ALIGN TOP RUNG WITH FINISH FLOOR STL. LADDER: 1 2"x4" FLAT BARS 16" APART ATTACHED TO WALL W/(3) 2"x7"x3 8" STL. ANGLES 1 2" RUNGS @ 12" O.C. SUMP PIT, REFERENCE STRUCTURAL DWGS. FOR ADDITIONAL INFO. SEE STRUCTURAL FOR WATERPROOFING EXTENTS PASSENGER ELEVATOR BASIS OF DESIGN SCHINDLER 3300 TRACTION ELEVATOR 3500 LBS, 100 FPM FRONT OPENINGS - CENTERED WG3A WC1 F1F1PROVIDE INSULATION IN ATTIC SPACE UP SIDE OF ELEVATOR WALL 5'-0"7'-0" 7'-0"SCALE: 06 ELEVATOR SECTION BUILDING A 1/4" = 1'-0" 7'-0"7'-0" 7 A161 HOISTWAY BEAM SIZE AND PLACEMENT AS REQUIRED BY ELEVATOR PROVIDED AND INSTALLED BY G.C.12'-8"13'-578"1'-7" ALIGN TOP RUNG WITH FINISH FLOOR STL. LADDER: 12"x4" FLAT BARS 16" APART ATTACHED TO WALL W/(3) 2"x7"x3 8" STL. ANGLES 1 2" RUNGS @ 12" O.C. SUMP PIT, REFERENCE STRUCTURAL DWGS. FOR ADDITIONAL INFO. SEE STRUCTURAL FOR WATERPROOFING EXTENTS PASSENGER ELEVATOR BASIS OF DESIGN SCHINDLER 3300 TRACTION ELEVATOR 3500 LBS, 100 FPM FRONT OPENINGS - CENTERED WG3A WC1 F2aF1 F2a F1 PROVIDE INSULATION IN ATTIC SPACE UP SIDE OF ELEVATOR WALL 5'-0"7'-0"F2F27'-0"R3R4R3R3R4R3F3F3F3F3F3F3F3F3F3F3F3F3WC1 4 A191 WC1WC1 75 8" 8'-6" 75 8" WC17'-10"758"8'-6"75 8" 75 8"1"TYP.758" WC1 4 A191 WC1 WC1 10" 8'-6" 10" WC17'-10" 10" 8'-6"10" 10"1"TYP.10" PROVIDE HOISTWAY VENTING, SEE MECHANICAL DRAWINGS FOR MORE INFORMATION PROVIDE HOISTWAY VENTING, SEE MECHANICAL DRAWINGS FOR MORE INFORMATION PROVIDE HOISTWAY VENTING, SEE MECHANICAL DRAWINGS FOR MORE INFORMATION 04/15/22