Loading...
HomeMy WebLinkAboutE603 - ELECTRICAL SCHEDULESARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET E603ELECTRICALSCHEDULESNORTH ENDAPARTMENTSCARMEL, IN# DESCRIPTION DATE 1 BID DOCUMENT 01/15/2021 Notes: Total Est. Demand: 76 A Total Conn.: 75 A Miscellaneous Power 19926 VA 100.00% 19926 VA Total Est. Demand: 27233 VA RECEPT 5580 VA 100.00% 5580 VA Total Conn. Load: 26888 VA LIGHTING 1382 VA 125.00% 1727 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps: 65 A 89 A 71 A Total Load: 7837 VA 10637 VA 8414 VA 41 42 39 LIGHTING 20 A 1 110 40 37 38 35 36 33 34 31 LIGHTING - CORRIDOR ARA B 20 A 1 251 32 29 LIGHTING - RM E301, M301 20 A 1 220 581 1 20 A LIGHTING - CORRIDOR AREA A 30 27 RECEPT - ROOF 20 A 1 720 220 1 20 A LIGHTING - RM E302, M302 28 25 LIGHTING - ELEVATOR 20 A 1 540 180 1 20 A RECEPT 26 23 0 0 24 21 CU-1 - ON ROOF 20 A 2 0 0 2 20 A CU-1 - ON ROOF 22 19 PEV-1 20 A 1 0 0 1 20 A PEV-1 20 17 1456 0 18 15 CU-2 ON ROOF 20 A 2 1456 0 2 20 A CU-1 - ON ROOF 16 13 1456 0 14 11 CU-2 ON ROOF 25 A 2 1456 0 2 20 A CU-1 - ON ROOF 12 9 RECEPT - ROOF 20 A 1 1080 2350 10 7 RECEPT - THIRD FLOOR AREA B 20 A 1 900 2350 2 30 A FCU-4 3RD FLOOR AREA B 8 5 2350 2350 6 3 FCU-4 3RD FLOOR AREA A 30 A 2 2350 2350 2 30 A FCU-4 3RD FLOOR AREA A 4 1 RECEPT - THIRD FLOOR AREA A 20 A 1 1080 1080 1 20 A RECEPT - THIRD FLOOR AREA A 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Enclosure: NEMA 1 MCB Rating: 1 A Mounting: SURFACE Wires: 4 Mains Rating: Supply From: Phases: 3 Mains Type: Location: Volts: 120/208 Wye A.I.C. Rating: 18,000 Branch Panel:HA3 Notes: Total Est. Demand: 1 A Total Conn.: 1 A Total Est. Demand: 360 VA Miscellaneous Power 0 VA 0.00% 0 VA Total Conn. Load: 360 VA RECEPT 360 VA 100.00% 360 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps: 3 A 0 A 0 A Total Load: 360 VA 0 VA 0 VA 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 22 19 20 17 18 15 16 13 14 11 12 9 10 7 8 5 6 3 ELEV CAB PWR & LTG 20 A 1 0 4 1 RECEPT - ELEV. SUMP 20 A 1 180 180 1 20 A RECEPT ELV-1-2 ELV-1-2 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Enclosure: NEMA 1 MCB Rating: 1 A Mounting: SURFACE Wires: 4 Mains Rating: 225 A Supply From: Phases: 3 Mains Type: MLO Location: GARAGE 001 Volts: 120/208 Wye A.I.C. Rating: 18,000 Branch Panel:HAE Notes: Total Est. Demand: 104 A Total Conn.: 103 A Miscellaneous Power 28226 VA 100.00% 28226 VA Total Est. Demand: 37629 VA RECEPT 6840 VA 100.00% 6840 VA Total Conn. Load: 37117 VA LIGHTING 2051 VA 125.00% 2564 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps: 93 A 101 A 117 A Total Load: 11203 VA 11957 VA 13957 VA 41 42 39 UH-1 - BIKE ROOM-2 A102-2 20 A 1 180 180 1 20 A RECEPT Room A103-2, 115, A101-3 40 37 180 1 20 A UH-1 - RISER ROOM 38 35 180 1 20 A RECEPT Space E201-4 36 33 LIGHTING 20 A 1 577 1040 1 20 A LIGHTING 34 31 ELEV CAB PWR & LTG 20 A 1 0 32 29 ACCESS CONTROL 20 A 1 360 360 1 20 A ACCESS CONTROL 30 27 2350 0 28 25 Miscellaneous Power MECH. ROOM-1 M202-1 30 A 2 2350 0 2 30 A FCU-4 26 23 RECEPT - SECOND FLOOR 20 A 1 720 180 1 20 A RECEPT ELEC. ROOM-1 E202-1 24 21 RECEPT - ELEV. PIT 20 A 1 180 900 1 20 A RECEPT - SECOND FLOOR 22 19 180 1 20 A RECEPT - ELEV. SUMP 20 17 RECEPT - ELEV. SUMP 20 A 1 180 110 1 20 A LIGHTING - RM M202 18 15 RECEPT - ELEV. PIT 20 A 1 180 110 1 20 A LIGHTING - RM E202 16 13 RECEPT Space E201-5 20 A 1 180 110 1 20 A LIGHTING - RM M201 14 11 5720 105 1 20 A LIGHTING - C008 12 9 Miscellaneous Power STORAGE S101 70 A 2 5720 180 1 20 A RECEPT 10 7 2350 3692 8 5 FCU-4 30 A 2 2350 3692 2 20 A FCU-5 6 3 RECEPT - ELEC. ROOM-2 E102-2 20 A 1 180 180 1 20 A FACP 4 1 RECEPT - FIRST FLOOR 20 A 1 1080 1080 1 20 A RECEPT - FIRST FLOOR 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Enclosure: NEMA 1 Mounting: SURFACE Wires: 4 Mains Rating: 225 A Supply From: Phases: 3 Mains Type: MCB Location: ELEC. ROOM-2 E101-2 Volts: 120/208 Wye A.I.C. Rating: 18,000 Branch Panel:HB1 Notes: Total Est. Demand: 84 A HVAC-NON COINCIDENTAL 0 VA 0.00% 0 VA Total Conn.: 83 A Miscellaneous Power 18803 VA 100.00% 18803 VA Total Est. Demand: 30246 VA RECEPT 9060 VA 100.00% 9060 VA Total Conn. Load: 29770 VA LIGHTING 1907 VA 125.00% 2383 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps: 92 A 61 A 104 A Total Load: 10562 VA 7261 VA 11947 VA 41 LIGHTING - RM E302 20 A 1 110 88 1 20 A LIGHTING - ELEVATOR 42 39 LIGHTING - RM M301 20 A 1 110 110 1 20 A LIGHTING - RM 302 40 37 0 110 1 20 A LIGHTING - RM E301 38 35 HVAC-NON COINCIDENTAL 20 A 2 0 0 36 33 0 0 2 20 A HVAC-NON COINCIDENTAL 34 31 CU-1 - ON ROOF 20 A 2 0 0 32 29 RECEPT - ROOF 20 A 1 1080 0 2 20 A CU-1 - ON ROOF 30 27 0 0 28 25 HVAC-NON COINCIDENTAL 20 A 2 0 0 2 20 A HVAC-NON COINCIDENTAL 26 23 0 0 24 21 CU-1 - ON ROOF 20 A 2 0 0 2 20 A CU-1 - ON ROOF 22 19 2350 472 1 20 A LIGHTING 20 17 FCU-4 30 A 2 2350 907 1 20 A LIGHTING 18 15 RECEPT - TELECOM 20 A 1 180 360 1 20 A ACCESS CONTROL 16 13 2350 900 1 20 A RECEPT - THIRD FLOOR 14 11 FCU-4 30 A 2 2350 2350 12 9 RECEPT - THIRD FLOOR 20 A 1 900 2350 2 30 A FCU-4 10 7 UH-1 - STAIRWELL 20 A 1 1560 1560 1 20 A UH-1 - STAIRWELL 8 5 2350 360 1 20 A RECEPT - TELECOM 6 3 FCU-4 30 A 2 2350 900 1 20 A RECEPT - FOURTH FLOOR 4 1 RECEPT - FOURTH FLOOR 20 A 1 900 360 1 20 A ACCESS CONTROL 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Enclosure: NEMA 1 MCB Rating: 400 A Mounting: SURFACE Wires: 4 Mains Rating: 400 A Supply From: Phases: 3 Mains Type: MCB Location: ELEC. ROOM E401 Volts: 120/208 Wye A.I.C. Rating: 18,000 Branch Panel:HB4 Notes: Total Est. Demand: 51 A Total Conn.: 48 A Miscellaneous Power 7384 VA 100.00% 7384 VA Total Est. Demand: 18474 VA RECEPT 5376 VA 100.00% 5376 VA Total Conn. Load: 17327 VA LIGHTING 4637 VA 125.00% 5796 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps: 69 A 52 A 30 A Total Load: 7935 VA 5908 VA 3583 VA 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 22 19 20 17 LIGHTING 20 A 1 88 18 15 LIGHTING - STAIRWELL 20 A 1 328 328 1 20 A LIGHTING - STAIRWELL 16 13 LIGHTING 20 A 1 516 991 1 20 A LIGHTING - EXTERIOR 14 11 LIGHTING - GARAGE 20 A 1 1204 1274 1 20 A LIGHTING - GARAGE 12 9 3692 0 10 7 Miscellaneous Power PARKING GARAGE 001 20 A 2 3692 0 8 5 RECEPT - GARAGE LEVEL 20 A 1 1080 0 3 20 A Miscellaneous Power PARKING GARAGE 001 6 3 ELEV CAB PWR & LTG 20 A 1 0 1560 4 1 SE-1 20 A 1 1176 1560 2 20 A UH-2 - RISER ROOM 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Enclosure: NEMA 1 MCB Rating: 100 A Mounting: SURFACE Wires: 4 Mains Rating: 225 A Supply From: Phases: 3 Mains Type: Location: PARKING GARAGE 001 Volts: 120/208 Wye A.I.C. Rating: 18,000 Branch Panel:HB0 Notes: Total Est. Demand: 0 A Total Conn.: 0 A Total Est. Demand: 110 VA Total Conn. Load: 88 VA LIGHTING 88 VA 125.00% 110 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps: 1 A 0 A 0 A Total Load: 88 VA 0 VA 0 VA 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 22 19 20 17 18 15 16 13 14 11 12 9 10 7 8 5 6 3 4 1 LIGHTING - ELEV PIT 20 A 1 88 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Enclosure: NEMA 1 MCB Rating: 100 A Mounting: SURFACE Wires: 4 Mains Rating: 225 A Supply From: Phases: 3 Mains Type: Location: PARKING GARAGE 001 Volts: 120/208 Wye A.I.C. Rating: 18,000 Branch Panel:HBE Notes: Total Est. Demand: 122 A Total Conn.: 119 A Miscellaneous Power 32698 VA 100.00% 32698 VA Total Est. Demand: 43984 VA RECEPT 6300 VA 100.00% 6300 VA Total Conn. Load: 42986 VA LIGHTING 3989 VA 125.00% 4986 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps: 170 A 77 A 124 A Total Load: 19650 VA 9223 VA 14113 VA 41 42 39 LIGHTING - RM M202 20 A 1 110 110 1 20 A LIGHTING - RM E202 40 37 LIGHTING - RM E201 20 A 1 110 165 1 20 A LIGHTING - RM E101 38 35 LIGHTING - SECOND FLOOR CORRIDOR 20 A 1 473 110 1 20 A LIGHTING - RM M201 36 33 LIGHTING - RM E102 20 A 1 110 110 1 20 A LIGHTING - RM101 34 31 LIGHTING - CORRIDOR 20 A 1 433 110 1 20 A LIGHTING - RM M102 32 29 262 1 20 A LIGHTING 30 27 LIGHTING 20 A 1 262 88 1 20 A LIGHTING - ELEVATOR 28 25 LIGHTING - RM A101, RM C010 20 A 1 121 203 1 20 A LIGHTING Room R101 26 23 ELEVATOR CONV. 20 A 1 180 180 1 20 A ELEVATOR PIT 24 21 LIGHTING - EXTERIOR 20 A 1 1212 0 1 20 A ELEVATOR CAB 22 19 5720 2964 20 17 FCU-5 70 A 2 5720 2964 2 20 A Miscellaneous Power MECH. ROOM-1 M102-1 18 15 2350 2350 16 13 FCU-4 30 A 2 2350 2350 2 30 A FCU-4 14 11 RECEPT - SECOND FLOOR 20 A 1 900 180 1 20 A RECEPT - TELECOM 12 9 ACCESS CONTROL 20 A 1 360 1080 1 20 A RECEPT - SECOND FLOOR 10 7 ACCESS CONTROL 20 A 1 540 2964 8 5 FACP 20 A 1 180 2964 2 40 A FCU-4 6 3 RECEPT - FIRST FLOOR 20 A 1 900 180 1 20 A RECEPT - TELECOM 4 1 RECEPT - RM A102, E101, M101 20 A 1 1440 180 1 20 A RECEPT - TELECOM 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Enclosure: NEMA 1 MCB Rating: 225 A Mounting: SURFACE Wires: 4 Mains Rating: 225 A Supply From: Phases: 3 Mains Type: MLO Location: ELEC. ROOM-1 E101-1 Volts: 120/208 Wye A.I.C. Rating: 18,000 Branch Panel:HC1 Notes: Total Est. Demand: 134 A HVAC-NON COINCIDENTAL 17472 VA 100.00% 17472 VA Total Conn.: 132 A Miscellaneous Power 20030 VA 100.00% 20030 VA Total Est. Demand: 48254 VA RECEPT 8100 VA 100.00% 8100 VA Total Conn. Load: 47724 VA LIGHTING 2122 VA 125.00% 2652 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps: 144 A 128 A 126 A Total Load: 17195 VA 15357 VA 15172 VA 41 42 39 LIGHTING - M301, E301, E302, M302 20 A 1 440 88 1 20 A LIGHTING - ELEVATOR 40 37 LIGHTING Room M401, E401, E402, M402 20 A 1 440 533 1 20 A LIGHTING - CORRIDOR 38 35 LIGHTING - CORRIDOR 20 A 1 621 2350 36 33 RECEPT - ROOF 20 A 1 1260 2350 2 30 A FCU-4 34 31 1248 1248 32 29 HVAC-NON COINCIDENTAL 20 A 2 1248 1248 2 20 A HVAC-NON COINCIDENTAL 30 27 1248 1248 28 25 HVAC-NON COINCIDENTAL 20 A 2 1248 1248 2 20 A HVAC-NON COINCIDENTAL 26 23 0 1248 24 21 CU-1 - ON ROOF 20 A 2 0 1248 2 20 A HVAC-NON COINCIDENTAL 22 19 1248 1248 20 17 CU-1 - ON ROOF 20 A 2 1248 1248 2 20 A CU-1 - ON ROOF 18 15 UH-1 20 A 1 720 360 1 20 A RECEPT - TELECOM 16 13 RECEPT - THIRD FLOOR 20 A 1 900 360 1 20 A RECEPT - TELECOM 14 11 2350 360 1 20 A ACCESS CONTROL 12 9 FCU-4 30 A 2 2350 720 1 20 A UH-1 10 7 RECEPT - THIRD FLOOR 20 A 1 1080 2350 8 5 RECEPT - FOURTH FLOOR 20 A 1 900 2350 2 30 A FCU-4 6 3 ACCESS CONTROL 20 A 1 360 2964 4 1 RECEPT - FOURTH FLOOR 20 A 1 1080 2964 2 30 A FCU-4 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Enclosure: NEMA 1 MCB Rating: 400 A Mounting: SURFACE Wires: 4 Mains Rating: 400 A Supply From: Phases: 3 Mains Type: MCB Location: ELEC. ROOM E401 Volts: 120/208 Wye A.I.C. Rating: 18,000 Branch Panel:HC4 Notes: Total Est. Demand: 1 A Total Conn.: 1 A Miscellaneous Power 0 VA 0.00% 0 VA Total Est. Demand: 470 VA RECEPT 360 VA 100.00% 360 VA Total Conn. Load: 448 VA LIGHTING 88 VA 125.00% 110 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps: 3 A 1 A 0 A Total Load: 360 VA 88 VA 0 VA 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 22 19 20 17 18 15 16 13 14 11 12 9 10 7 8 5 6 3 ELEVATOR CAB 20 A 1 0 88 1 20 A LIGHTING - ELEVATOR 4 1 ELEVATOR PIT 20 A 1 180 180 1 20 A ELEVATOR CONV. 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Enclosure: MCB Rating: 225 A Mounting: Wires: 4 Mains Rating: Supply From: Phases: 3 Mains Type: MLO Location: ELEC. ROOM-1 E101-1 Volts: 120/208 Wye A.I.C. Rating: Branch Panel:HC1E 1 07/08/21