HomeMy WebLinkAboutEL111a - BUILDING LIGHTING PLANS - BUILDING AM
M
M
M
ST1-1
ST1-1
STORAGE
103
ST2-1
ST2-1
ELV-1-1
ELV-1-1
LOBBY
100
T
H3 H3
H2
H2
H2
H2
H3
H3
H3
H3 H3 H3
H3
T1A
MDP-T1
H3
XR
X2
X2
X1
XR
X1
S4
S4
1
VESTIBULE
104HA0 -32
HA0 -1
HA0 -1
HA0 -33
HA0 -2 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031
JANUARY 15, 2021
BID SET
EL111aBUILDING LIGHTINGPLANS -BUILDING ANORTH ENDAPARTMENTSCARMEL, INSHEET KEYNOTES
1 FIXTURE FED FROM EMERGECNY ELEVATOR PANEL.
1/8" = 1'-0"
BUILDING A LIGHTING FIRST FLOOR PLAN -AREA A 1
GENERAL NOTES
A REFER TO SHEET E000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS, AND
ABBREVIATIONS.
B REFER TO E601 FOR LIGHTING FIXTURE SCHEDULES
C EMERGENCY LIGHT FIXTURE LOCATIONS SHOWN ARE NEOT EXACT. SPACE
FIXTURES AT APPROXIMATELY 42'-0" ON CENTER OR ACCORDING TO
MANUFACTURERS RECOMENDATIONS.
D OCCUPANCY SENSOR LOCATIONS SHOWN ARE NOT EXACT. CENTER
SENSORS WITHIN HALLWAY AND SPACE AT APPROXIMATELY 30'-0" ON
CENTER OR ACCORDING TO MANNUFACTURERS RECOMENDATION. MOUNT TO
BOTTOM OF DUCT SUPPORTS. COORDINATE WITH MECHANICAL.
E CORRIDOR LIGHTING FIXTURES ARE TO DIM TO 50% OUTPUT WHEN NO
OCCUPANCY IS DETECTED.
F FIXTURE MARKED WITH 'EM' SHOULD BE SUPPLIED WITH INTEGRAL BATTERY
BACK-UP.
G RECESSED FIXTURES INSTALLED WITHIN THE THERMAL ENVELOPE MUST BE
SEALED TO LIMIT AIR LEAKAGE.
# DESCRIPTION DATE
1 BID DOCUMENT 01/15/2021
1
07/08/21