HomeMy WebLinkAboutEL113b - BUILDING LIGHTING PLANS - BUILDING AM
M
M
M
M
M
H5H5
H1
X1
X2
H1
H1
H1
H1
H1
H1
H1
H1
H5
H5
H1
H1
H1
H1
H1
H1
H1
H5
H5
H5
H5
H5
H5
X1
X1
H1 H1 H1
X2
X2
1
2
X2
X2
H2 H2
H4 H4
K
H7
3
UNIT B2
326
UNIT B2
327
UNIT B3b
324
UNIT A2 IDD
325
UNIT A1 IDD
322
UNIT A1 IDD
323
UNIT A1 IDD
320
UNIT A2
321
UNIT A2
318
UNIT A1 IDD
319
3 / E403 3 / E403
4 / E401
2 / E401
2 / E401
2 / E401
3 / E401
2 / E401
3 / E401
HA1 -8
HA3 -31 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031
JANUARY 15, 2021
BID SET
EL113bBUILDING LIGHTINGPLANS -BUILDING ANORTH ENDAPARTMENTSCARMEL, INSHEET KEYNOTES
1 CIRCUIT ALL LIGHTING WITHIN STAIRWELL TO CIRCUIT INDICATED.
2 CIRCUIT ALL LIGHTING WITHIN CORRIDOR TO CIRCUIT INDICATED.
3 PROVIDE FIXTURE FOR ELEVATOR USE. PROVIDE KEYED SWITCH,
COORDINATE FINAL MOUNTING LOCATION WITH ELEVATOR SUPPLIER PRIOR
TO INSTALLATION.
1/8" = 1'-0"
BUILDING A LIGHTING THIRD FLOOR PLAN -AREA B 1
GENERAL NOTES
A REFER TO SHEET E000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS, AND
ABBREVIATIONS.
B REFER TO E601 FOR LIGHTING FIXTURE SCHEDULES
C EMERGENCY LIGHT FIXTURE LOCATIONS SHOWN ARE NEOT EXACT. SPACE
FIXTURES AT APPROXIMATELY 42'-0" ON CENTER OR ACCORDING TO
MANUFACTURERS RECOMENDATIONS.
D OCCUPANCY SENSOR LOCATIONS SHOWN ARE NOT EXACT. CENTER
SENSORS WITHIN HALLWAY AND SPACE AT APPROXIMATELY 30'-0" ON
CENTER OR ACCORDING TO MANNUFACTURERS RECOMENDATION. MOUNT TO
BOTTOM OF DUCT SUPPORTS. COORDINATE WITH MECHANICAL.
E CORRIDOR LIGHTING FIXTURES ARE TO DIM TO 50% OUTPUT WHEN NO
OCCUPANCY IS DETECTED.
F FIXTURE MARKED WITH 'EM' SHOULD BE SUPPLIED WITH INTEGRAL BATTERY
BACK-UP.
G RECESSED FIXTURES INSTALLED WITHIN THE THERMAL ENVELOPE MUST BE
SEALED TO LIMIT AIR LEAKAGE.
# DESCRIPTION DATE
1 BID DOCUMENT 01/15/2021
1
07/08/21