Loading...
HomeMy WebLinkAboutEL113b - BUILDING LIGHTING PLANS - BUILDING AM M M M M M H5H5 H1 X1 X2 H1 H1 H1 H1 H1 H1 H1 H1 H5 H5 H1 H1 H1 H1 H1 H1 H1 H5 H5 H5 H5 H5 H5 X1 X1 H1 H1 H1 X2 X2 1 2 X2 X2 H2 H2 H4 H4 K H7 3 UNIT B2 326 UNIT B2 327 UNIT B3b 324 UNIT A2 IDD 325 UNIT A1 IDD 322 UNIT A1 IDD 323 UNIT A1 IDD 320 UNIT A2 321 UNIT A2 318 UNIT A1 IDD 319 3 / E403 3 / E403 4 / E401 2 / E401 2 / E401 2 / E401 3 / E401 2 / E401 3 / E401 HA1 -8 HA3 -31 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET EL113bBUILDING LIGHTINGPLANS -BUILDING ANORTH ENDAPARTMENTSCARMEL, INSHEET KEYNOTES 1 CIRCUIT ALL LIGHTING WITHIN STAIRWELL TO CIRCUIT INDICATED. 2 CIRCUIT ALL LIGHTING WITHIN CORRIDOR TO CIRCUIT INDICATED. 3 PROVIDE FIXTURE FOR ELEVATOR USE. PROVIDE KEYED SWITCH, COORDINATE FINAL MOUNTING LOCATION WITH ELEVATOR SUPPLIER PRIOR TO INSTALLATION. 1/8" = 1'-0" BUILDING A LIGHTING THIRD FLOOR PLAN -AREA B 1 GENERAL NOTES A REFER TO SHEET E000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS, AND ABBREVIATIONS. B REFER TO E601 FOR LIGHTING FIXTURE SCHEDULES C EMERGENCY LIGHT FIXTURE LOCATIONS SHOWN ARE NEOT EXACT. SPACE FIXTURES AT APPROXIMATELY 42'-0" ON CENTER OR ACCORDING TO MANUFACTURERS RECOMENDATIONS. D OCCUPANCY SENSOR LOCATIONS SHOWN ARE NOT EXACT. CENTER SENSORS WITHIN HALLWAY AND SPACE AT APPROXIMATELY 30'-0" ON CENTER OR ACCORDING TO MANNUFACTURERS RECOMENDATION. MOUNT TO BOTTOM OF DUCT SUPPORTS. COORDINATE WITH MECHANICAL. E CORRIDOR LIGHTING FIXTURES ARE TO DIM TO 50% OUTPUT WHEN NO OCCUPANCY IS DETECTED. F FIXTURE MARKED WITH 'EM' SHOULD BE SUPPLIED WITH INTEGRAL BATTERY BACK-UP. G RECESSED FIXTURES INSTALLED WITHIN THE THERMAL ENVELOPE MUST BE SEALED TO LIMIT AIR LEAKAGE. # DESCRIPTION DATE 1 BID DOCUMENT 01/15/2021 1 07/08/21