Loading...
HomeMy WebLinkAboutEL120 - BUILDING LIGHTING PLANS - BUILDING BM H4 H4 H4 H4 H2 H2 H2 H2 KKPARKING GARAGE 001 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 RISER ROOM 002 G1G1 H3 H3 H3 H3 H3 H3 X1 XR X1X1 X1 XR XR S4 S4 S4 MDPB HB0 HBE HB0 -11 HB0 -11 HB0 -11 HB0 -11 HB0 -11 HB0 -11 HB0 -11 HB0 -11 HB0 -11 HB0 -11 HB0 -11 HB0 -11 HB0 -11 HB0 -11 HB0 -11 HB0 -11 HB0 -12 HB0 -12 HB0 -12 HB0 -12 HB0 -12 HB0 -12 HB0 -12 HB0 -12 HB0 -12 HB0 -12 HBE -1 HB0 -17 HB0 -12 HB0 -12 HB0 -12 HB0 -12 HB0 -12 HB0 -12 HB0 -12 HB0 -12 HB0 -12 HB0 -12 HB0 -12 HB0 -12 X1 X1 HB0 -11 HB0 -11 HB0 -11HB0 -11 LC 1 HB0 -16 HB0 -15 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET EL120BUILDING LIGHTINGPLANS -BUILDING BNORTH ENDAPARTMENTSCARMEL, INSHEET KEYNOTES 1 PROVIDE LIGHTING CONTACTOR WITH PROGRAMMABLE TIME CLOCK FOR EXTERIOR LIGHTING CONTROL. 1/8" = 1'-0" BUILDING B LIGHTING LOWER FLOOR PLAN1 GENERAL NOTES A REFER TO SHEET E000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS, AND ABBREVIATIONS. B REFER TO E601 FOR LIGHTING FIXTURE SCHEDULES C EMERGENCY LIGHT FIXTURE LOCATIONS SHOWN ARE NEOT EXACT. SPACE FIXTURES AT APPROXIMATELY 42'-0" ON CENTER OR ACCORDING TO MANUFACTURERS RECOMENDATIONS. D OCCUPANCY SENSOR LOCATIONS SHOWN ARE NOT EXACT. CENTER SENSORS WITHIN HALLWAY AND SPACE AT APPROXIMATELY 30'-0" ON CENTER OR ACCORDING TO MANNUFACTURERS RECOMENDATION. MOUNT TO BOTTOM OF DUCT SUPPORTS. COORDINATE WITH MECHANICAL. E CORRIDOR LIGHTING FIXTURES ARE TO DIM TO 50% OUTPUT WHEN NO OCCUPANCY IS DETECTED. F FIXTURE MARKED WITH 'EM' SHOULD BE SUPPLIED WITH INTEGRAL BATTERY BACK-UP. G RECESSED FIXTURES INSTALLED WITHIN THE THERMAL ENVELOPE MUST BE SEALED TO LIMIT AIR LEAKAGE. # DESCRIPTION DATE 1 BID DOCUMENT 01/15/2021 1 07/08/21