HomeMy WebLinkAboutEP111a - BUILDING ELECTRICAL PLANS - BUILDING AFF
S
FS
S
S
ELV-1-1
ELV-1-1
ST2-1
ST2-1
STORAGE
103
LOBBY
100
ST1-1
ST1-1
HA0-6
E
T1A
15cd
15cd15cd
MDP-T1
HA0-30
UH-1 1
2 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031
JANUARY 15, 2021
BID SET
EP111aBUILDING ELECTRICALPLANS -BUILDING ANORTH ENDAPARTMENTSCARMEL, INSHEET KEYNOTES
1 PROVIDE DEDICATED 20A, 120V CIRCUIT FOR UH-1.
2 PROVIDE DEDICATED 20A, 120V CIRCUIT FOR UH-1.
9 PROVIDE 208V, 3-PHASE 20 AMP CIRCUIT TO DBP-1. REFER TO ONE-LINE
DIAGRAM FOR ADDITIONAL INFORMATION.
10 PROVIDE CONNECTION TO JOCKEY PUMP CONTROLLER.
11 PROVIDE CONNECTION TO FIRE PUMP CONTROLLER.
13 PROVIDE CONNECTION TO JP-1. COORDINATE EXACT REQUIREMENTS WITH
EQUIPMENT BEING PROVIDED. REFER TO ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
14 PROVIDE CONNECTION TO FP-1. COORDINATE EXACT REQUIREMENTS WITH
EQUIPMENT BEING PROVIDED. REFER TO ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
1/8" = 1'-0"
BUILDING A ELECTRICAL FIRST FLOOR PLAN -AREA A 1
GENERAL NOTES
A REFER TO SHEET E-000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND
ABBREVIATIONS.
B REFER TO E-600 SERIES SHEETS FOR LOAD CENTER CIRCUIT SCHEDULES
FOR EACH DWELLNG UNIT TYPE.
C TO PROVIDE (1) 1" CONDUIT WITH PULL STRING AND BUSHINGS FROM
TERMINAL BOARD TO EACH APARTMENT UNIT HOME NETWORKING
ENCLOSURE. COORDINATE WITH UTILITY ON EXACT REQUIREMENTS PRIOR
TO ROUHG-IN.
# DESCRIPTION DATE
07/08/21