HomeMy WebLinkAboutEP111b - BUILDING ELECTRICAL PLANS - BUILDING AF FF FFAA
S
S
FACP
S
FF S FS S S
S
XXX-1
XXX-1
ST3-1
ST3-1
ELV2-1
ELV2-1
WORK ROOM
XXX
OFFICE-1
XXX-1
OFFICE-2
XXX-2
BIKE ROOM
XXX
OFFICE
101
MAIL ROOM
XXX
MECH. ROOM-1
M101-1
AMENITIES-1
A101-1
HA0-615cd
15cd
15cd 15cd
HA1
15cd15cd
30cd
30cd
HA0-7
HA0-7
HA0-7
HA0-9
HA0-10
HA0-7
E
HA0-8 FCU-5
HA1-1
HA1-1
HA1-1
HA1-1
HA0-23
HA0-23
HA0-23
HA1-2 HA1-2
HA1-2
HA1-2
HA1-2
HA1-3
HA1-10 HA1-4
HA1-4HA1-4
HA1-5 HA1-5 HA1-5
HA1-6
MDP-T2 T2A
2
1
4
3
5
6
7
8
EF-1 EF-1
99
HA1-7,9,11
RESTROOM
C006
RESTROOM
C007
UH-1
10
HA0-12 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031
JANUARY 15, 2021
BID SET
EP111bBUILDING ELECTRICALPLANS -BUILDING ANORTH ENDAPARTMENTSCARMEL, INSHEET KEYNOTES
1 PROVIDE DISCONNECT FOR ELEVATOR. COORDINATE LOCATION OF
DISCONNECT WITH ELEVATOR INSTALLER PRIOR TO ROUGH-IN.
2 PROVIDE DISCONNECT FOR ELEVATOR CAB LIGHTING AND RECEPTACLES.
COORDINATE LOCATION OF DISCONNECT WITH ELEVATOR INSTALLER PRIOR
TO ROUGH-IN.
3 PROVIDE RECEPTACLE FOR SUMP PUMP IN ELEVATOR PIT. COORDINATE
LOCATION WITH ELEVATOR INSTALLER AND FINAL PIT LOCATION PRIOR TO
ROUGH-IN.
4 PROVIDE RECEPTACLE FOR GENERAL POWER LOCATED IN ELEVATOR PIT.
COORDINATE LOCATION WITH ELEVATOR INSTALLER PRIOR TO ROUGH-IN.
5 PROVIDE SMOKE DETECTOR FOR ELEVATOR RECALL.
6 30A,2 POLE,NEMA 1 DISCONNECT SWITCH FOR FOR FCU,CIRCUIT WITH
2#10,#10G.
7 PROVIDE DEDICATED 20A, 120V CIRCUIT FOR FIRE ALARM CONTROL PANEL.
8 PROVIDE DEDICATED 20A, 120V CIRCUIT FOR REFRIGERATOR.
9 CIRCUIT EF-1 WITH ROOM LIGHTING. VERIFY OCCUPANCY SENSOR POWER
PACK IS SIZED TO ACCOMODATE FAN.
10 PROVIDE DEDICATED 20A, 120V CIRCUIT FOR UH-1.
1/8" = 1'-0"
BUILDING A ELECTRICAL FIRST FLOOR PLAN -AREA B1
GENERAL NOTES
A REFER TO SHEET E-000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND
ABBREVIATIONS.
B REFER TO E-600 SERIES SHEETS FOR LOAD CENTER CIRCUIT SCHEDULES
FOR EACH DWELLNG UNIT TYPE.
C TO PROVIDE (1) 1" CONDUIT WITH PULL STRING AND BUSHINGS FROM
TERMINAL BOARD TO EACH APARTMENT UNIT HOME NETWORKING
ENCLOSURE. COORDINATE WITH UTILITY ON EXACT REQUIREMENTS PRIOR
TO ROUHG-IN.
# DESCRIPTION DATE
07/08/21